Bucket size auto-picked from range: 5-min for ≤24h, 30-min for ≤7d, daily means above. Transmission imports/exports shown for single regions only (interconnectors net to zero across NEM).
| Fuel | Avg GW | GWh | Share % | VWAP $/MWh |
|---|---|---|---|---|
| Coal | 10.7 | 252.3 | 44.9 | 101 |
| Wind | 5.4 | 127.8 | 22.7 | 44 |
| Solar | 2.1 | 48.3 | 8.6 | 106 |
| Rooftop Solar | 4.0 | 93.2 | 16.6 | 37 |
| Battery | 0.7 | 15.7 | 2.8 | 109 |
| Hydro | 0.8 | 19.2 | 3.4 | 175 |
| Gas | 0.3 | 5.9 | 1.1 | 106 |
| Total Supply | 23.9 | 562.5 | 92 | |
| Battery Charge | 0.7 | 16.1 | 28 | |
| Net Demand | 546.4 | |||
| Flat load $/MWh | 97 |
VWAP = Σ(price × generation) / Σ(generation) at 30-min resolution. For NEM, each region's output is priced at that region's RRP. Flat load = simple time-weighted price.