NEM network congestion, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Areas that bound
350
Network as built share
40%
Equipment outage share
27%
Single-plant limit share
33%
Curtailed while constrained
1,135 GWh
Value of that curtailment
$71.2m

Top 25 congestion areas by binding hours

Network as builtEquipment outageLimit on a single plant
AreaRegionHours% of periodCause splitUnits in constraintsMW in constraintsLimit typeGWh curtailed$m
Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kVNSW81538%
7411,954Thermal44722.4
Central Queensland: Gladstone corridor (Calliope River, Larcom Creek, Wurdong 275 kV)QLD79437%
11122,138Thermal23215.5
Murraylink: SA to Victoria held at zeroSA63629%
interconnectorNot described0.00.0
Central-west NSW: Molong–Orange North 132 kVNSW59828%
233,637Thermal1185.3
North-west NSW: Gunnedah–Tamworth 132 kVNSW49023%
2166Thermal16.40.9
Project EnergyConnect loop: system normalNSW41919%
NSW1-SA1,V-SA,VIC1-NSW1Other0.00.0
Project EnergyConnect loop: N-3 outage constraintNSW39618%
NSW1-SA1,V-SA,VIC1-NSW1Other0.00.0
Wagga North–Wagga 132 kVNSW38518%
121,579Thermal2.50.1
Murraylink (SA side): Monash–North West Bend 132 kVSA37217%
V-S-MNSP1Thermal0.00.0
Kennedy Energy Park — system strengthQLD36717%
258System Strength4.10.3
North-west Victoria: voltage stability, Horsham–Murra Warra–Kiamal 220 kVVIC35717%
558,016Voltage Stability50.20.5
NSW mid-north coast: Port Macquarie–Herons Creek 132 kVNSW33916%
101,366Thermal1.90.0
Aldoga Solar Farm — system strengthQLD31515%
1387System Strength0.30.0
Wemen transformer (Bannerton and Wemen solar farms)VIC30314%
2198Thermal6.70.1
Kaban Wind Farm — system strengthQLD30214%
1157System Strength10.10.6
Snowy to NSW: transient stability limits (Yass–Bannaby–Marulan)NSW28713%
10123,129Transient Stability60.620.2
Glenrowan transformers (north-east Victoria)VIC28513%
3263Thermal10.90.2
Project EnergyConnect loop: N-3 outage constraint (dispatch and predispatch only)NSW27513%
NSW1-SA1,V-SA,VIC1-NSW1Other0.00.0
Mount Emerald — system strengthQLD27413%
1181System Strength14.81.0
Haughton Solar Farm — system strengthQLD26812%
1133System Strength3.40.1
Victoria: transient stability, Hazelwood–South Morang 500 kVVIC23511%
649,933Transient Stability20.90.3
Dundonnell Wind Farm — 168 MW capVIC1918.8%
5920Discretionary22.70.2
Rugby Run Solar Farm — system strengthQLD1888.7%
165System Strength3.50.1
Terranora interconnector: Terranora–Mudgeeraba 110 kVNSW1878.7%
N-Q-MNSP1Thermal0.00.0
Out = Canberra-Capital (6) or Kangaroo Valley to Capital (3W), avoidNSW1717.9%
129Voltage Stability0.00.0

Monthly binding hours, top 8 areas of the period

Source: AEMO. Summary built 25 Nov 2026 02:11; data through 25 Nov 2026 01:10 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.