NEM network congestion, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Areas that bound
350
Network as built share
40%
Equipment outage share
27%
Single-plant limit share
33%
Curtailed while constrained
1,135 GWh
Value of that curtailment
$71.2m
Network as built: the limit binds with every line and transformer in service. AEMO marks these “Out = Nil”.
Equipment outage: the limit applies only while a named line or transformer is out of service.
Limit on a single plant: AEMO caps one wind or solar farm. Most are system strength limits, which depend on how many coal, gas or hydro units and synchronous condensers are running nearby.
Top 25 congestion areas by binding hours
Network as builtEquipment outageLimit on a single plant
Source: AEMO. Summary built 25 Nov 2026 02:11; data through 25 Nov 2026 01:10 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.