113 in progress; showing 25, those that have invoked a constraint set first, then the most recently started.
Substation
Equipment
Start
End
Status
Reason
Constraint set
BURONGA
SYNC SCON5
24 Nov 2026 18:00
25 Nov 2026 18:00
PTP
HV equipt commissioning
N-FINLYSF1_ZERO_INV, N-BU-SCON1
S2_HALYS, H24_CALV
REAC 8811_H24, CB CPLR_5062, CB FDR_88112, CB CPLR_5072, LINE 275KV_8811
24 Nov 2026 10:00
26 Nov 2026 17:00
PTP
HV equipt maintenance
Q-HACL
H39_WORE
SVC 3_H39
24 Nov 2026 08:00
26 Nov 2026 11:59
PTP
HV equipt maintenance
Q-WR_VC
BANNABY, MARULAN
LINE 35
24 Nov 2026 07:00
25 Nov 2026 16:00
PTP
HV equipt maintenance
N-BYMN_ONE_15M
KANGAROO, BENDEELA
LINE 19
24 Nov 2026 06:40
25 Nov 2026 14:30
PTP
HV equipt maintenance
N-X_BDKV_CB5432
YASS
TRANS 1H
24 Nov 2026 06:00
27 Nov 2026 16:00
PTP
HV equipt maintenance
N-YSTX
KAR_H_PS
TRANS X2
23 Nov 2026 11:00
25 Nov 2026 15:00
PTP
HV equipt maintenance
Q-KA_2TX
R2_BRAE, BRAE_PS
CB FDR_88392, LINE 275KV_8839
23 Nov 2026 09:00
27 Nov 2026 17:00
PTP
HV equipt commissioning
Q-BRBRA_8839
DARL_PT
TRANS 4H
23 Nov 2026 09:00
27 Nov 2026 14:00
PTP
HV equipt maintenance
N-DP_TIETX
S_EAST
CB CB6160
23 Nov 2026 08:00
26 Nov 2026 15:30
PTP
HV equipt maintenance
S-SE_CB6162_CB6160
GORDON
BUS 7MNB, CB B52, CB B152, CB C752
23 Nov 2026 07:30
13 Dec 2026 14:00
PTP
HV equipt commissioning
T-GO_288
MA_3
CB CB2996
23 Nov 2026 07:16
27 Nov 2026 15:30
PTP
HV equipt commissioning
S-MAPS3-PV_0
MOREE
TRANS 1
23 Nov 2026 06:30
27 Nov 2026 16:00
PTP
HV equipt commissioning
N-MOR_TX
KEMPSEY, ARMIDALE
LINE 965
23 Nov 2026 06:30
25 Nov 2026 16:00
PTP
HV equipt maintenance
N-ARKS_965
MWTS
CB Z1TR_2B_66
23 Nov 2026 05:00
13 Dec 2026 16:00
PTP
HV equipt maintenance
V-LVES1_BDU_ZERO
YADNAR, PT_L_T
LINE YADPLT_1
22 Nov 2026 11:30
27 Nov 2026 17:00
PTP
HV equipt maintenance
S-X_PLYD
WOLLAR, MT_PIPER
LINE 5A5
22 Nov 2026 05:00
30 Nov 2026 17:00
PTP
HV equipt commissioning
N-MPWO_5A5
PT_L_T, YADNAR
LINE YADPLT_1
20 Nov 2026 08:00
11 Dec 2026 17:00
PTP
HV equipt commissioning
S-X_PLYD
T_BEND
CB CB6124, CB CB6597, CB CB6594, BUS BE, CB CB8027, TRANS T_4, CB CB6122, BUS EB, CAP C_64, CB CB6535, CB 7053
17 Nov 2026 07:15
26 Nov 2026 16:30
PTP
HV equipt commissioning
S-TB275_E_BUS, S-TB132_E_BUS
BRINKW, DAVENP, TEMP_W
CB CB6093, LINE BRITEW_1, TRANS T_3, LINE DVPBRI_1, CB CB6710, CB CB6530, REACT R4, CB CB6591, BUS EB, CB CB6068, CB CB6528, CB CB6527, CB CB6593, CB CB6592
15 Nov 2026 07:00
7 Dec 2026 07:00
PTP
HV equipt commissioning
S-X_DVBR+BRTW
MLNK_B, MLRC
LINE DC_CONVERTER, LINE ML_1
5 Nov 2026 01:00
4 Dec 2026 16:00
PTP
HV equipt maintenance
I-MURRAYLINK
HWTS
TRANS A3TR_500
12 Oct 2026 06:30
26 Nov 2026 16:00
PTP
HV equipt maintenance
V-X_HWTS_A2_A3_R
MURRAY
TRANS GGA_TR2
7 Oct 2026 02:00
9 Mar 2027 07:00
PTP
HV equipt commissioning
V-MSSGG_TX
HWTS
TRANS A2TR_500
1 Aug 2026 15:33
31 Dec 2026 16:30
PTP
HV equipt maintenance
V-X_HWTS_A2_A3_R
BLGC
LINE GT_GC
2 Jul 2026 18:00
25 Nov 2026 10:00
PTP
HV equipt commissioning
I-TV_CLPS
Outages counted: start time before now, end time after now, status not WDRAWN, WD REQ, COMPLETE, RESUBMIT or UTP, and no actual end time before now. Outages with no equipment id are left out. Start and end are as submitted. Marginal values reflect the bids of constrained generators, often at the −$1,000 market floor, and are not a measure of economic cost. See also PASA transmission outages.
Source: AEMO. Summary built 25 Nov 2026 02:26; data through 25 Nov 2026 01:25 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.