Commissioning / hold point constraint for Clements Gap BESS of -20 MW

SA · Other · C_S_CGBESS01_020_L
Most frequent constraint: Commissioning / hold point constraint for Clements Gap BESS of -20 MW - HP1
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
4
% of period
0.2%
Network as built share
0.0%
Equipment outage share
100%
Single-plant limit share
0.0%
Units in constraints
1
MW in constraints
60
Curtailed while constrained
0.0 GWh
Value of that curtailment
$0.0m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
S^CGBESS01_403Equipment outageVoltage StabilityOut = Bungama 275/132kV TX or Hummocks-Waterloo 132kV line; limit generation on Clements Gap BESS to 40 MW to avoid voltage collapse on trip of Hummocks-Waterloo line or Bungama 275/132 kV TX
C_S_CGBESS01_060_G0Equipment outageOtherCommissioning / hold point constraint for Clements Gap BESS of +60 MW - HP2
C_S_CGBESS01_060_L0Equipment outageOtherCommissioning / hold point constraint for Clements Gap BESS of -60 MW - HP2
S^CGBESS01_600Equipment outageVoltage StabilityLimit Clements Gap BESS upper limit to 60 MW to avoid voltage instability for various outages in Mid-north area

Units behind it

UnitFuelMWWeightDirection
Clements Gap BESSBattery601.00charge
Clements Gap BESSBattery601.00discharge

Associated outages

SubstationEquipmentStartEndStatusReasonBinding hours (whole outage)
HUMMOC, W_LOOTRANS 1, CB CB6133, TRANS T_1, CB CB6135, LINE HUMWAT_131 Aug 2026 08:001 Sep 2026 18:30COMPLETEHV equipt commissioning3
DAVENP, BUNGAM, BLYT_WN/A N/A, CB 8001, CB CB6562, CB CB6561, CB CB6560, LINE DVPBUN_126 Oct 2026 07:1527 Oct 2026 13:30COMPLETEHV equipt commissioning0
Source: AEMO. Summary built 25 Nov 2026 02:56; data through 25 Nov 2026 01:55 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.