Commissioning / hold point constraint for Clements Gap BESS of -20 MW
SA · Other · C_S_CGBESS01_020_L
Most frequent constraint: Commissioning / hold point constraint for Clements Gap BESS of -20 MW - HP1
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
4
% of period
0.2%
Network as built share
0.0%
Equipment outage share
100%
Single-plant limit share
0.0%
Units in constraints
1
MW in constraints
60
Curtailed while constrained
0.0 GWh
Value of that curtailment
$0.0m
Network as built: the limit binds with every line and transformer in service. AEMO marks these “Out = Nil”.
Equipment outage: the limit applies only while a named line or transformer is out of service.
Limit on a single plant: AEMO caps one wind or solar farm. Most are system strength limits, which depend on how many coal, gas or hydro units and synchronous condensers are running nearby.
Constraint-hours by cause, per month
Network as builtEquipment outageLimit on a single plant
Constraints that bound in the period
Constraint
Hours
Cause
Limit type
AEMO description
S^CGBESS01_40
3
Equipment outage
Voltage Stability
Out = Bungama 275/132kV TX or Hummocks-Waterloo 132kV line; limit generation on Clements Gap BESS to 40 MW to avoid voltage collapse on trip of Hummocks-Waterloo line or Bungama 275/132 kV TX
C_S_CGBESS01_060_G
0
Equipment outage
Other
Commissioning / hold point constraint for Clements Gap BESS of +60 MW - HP2
C_S_CGBESS01_060_L
0
Equipment outage
Other
Commissioning / hold point constraint for Clements Gap BESS of -60 MW - HP2
S^CGBESS01_60
0
Equipment outage
Voltage Stability
Limit Clements Gap BESS upper limit to 60 MW to avoid voltage instability for various outages in Mid-north area
Source: AEMO. Summary built 25 Nov 2026 02:56; data through 25 Nov 2026 01:55 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.