Commissioning / hold point constraint for Summerfield BESS 2 of -80 MW

SA · Other · C_S_SMFBESS2_080_L
Most frequent constraint: Commissioning / hold point constraint for Summerfield BESS 2 of -80 MW - CP1
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
1
% of period
0.0%
Network as built share
0.0%
Equipment outage share
100%
Single-plant limit share
0.0%
Units in constraints
0
MW in constraints
0
Curtailed while constrained
0.0 GWh
Value of that curtailment
$0.0m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
C_S_SMFBESS2_080_L1Equipment outageOtherCommissioning / hold point constraint for Summerfield BESS 2 of -80 MW - CP1

Units behind it

UnitFuelMWWeightDirection
Summerfield BESS 2Battery1201.00charge

Associated outages

No associated outage overlapped this period.
Source: AEMO. Summary built 25 Nov 2026 02:56; data through 25 Nov 2026 01:55 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.