Commissioning / hold point constraint for Golden Plains Wind Farm West

VIC · Other · C_V_GPWFWST_012
Most frequent constraint: Commissioning / hold point constraint for Golden Plains Wind Farm West of 12 MW - HP0B
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
4
% of period
0.2%
Network as built share
0.0%
Equipment outage share
0.0%
Single-plant limit share
100%
Units in constraints
2
MW in constraints
540
Curtailed while constrained
0.1 GWh
Value of that curtailment
$0.0m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
NC_V_GPWFWST12Limit on a single plantNon-ConformanceNon Conformance Constraint for GPWF WEST 1
V_GPWFWST1_FLT_01Limit on a single plantSystem StrengthLimit Golden Plains wind farm Stage 2 Central Collector Group upper limit to 0MW for system strength requirement
V_GPWFWST2_0WT1Limit on a single plantSystem StrengthGolden Plains wind farm Stage 2 West Collector Group turbine availability limit of 0. Constraint to violate if Golden Plains wind farm Stage 2 West Collector Group turbine availability greater than 0. Swamp out otherwise. DS only
V_GPWFWST2_FLT_01Limit on a single plantSystem StrengthLimit Golden Plains wind farm Stage 2 West Collector Group upper limit to 0MW for system strength requirement
V_GPWFWST1_0WT1Limit on a single plantSystem StrengthGolden Plains wind farm Stage 2 Central Collector Group turbine availability limit of 0. Constraint to violate if Golden Plains wind farm Stage 2 Central Collector Group turbine availability greater than 0. Swamp out otherwise. DS only
V_GPWFWST1_ZERO1Limit on a single plantUnit ZeroGolden Plains wind farm Stage 2 Central Collector Group upper limit of 0 MW
NC_V_GPWFWST21Limit on a single plantNon-ConformanceNon Conformance Constraint for GPWF WEST 2

Units behind it

UnitFuelMWWeightDirection
Golden Plains Wind Farm WestWind2701.00discharge
Golden Plains Wind Farm WestWind2701.00discharge

Associated outages

SubstationEquipmentStartEndStatusReasonBinding hours (whole outage)
GPTSCB GPCC_GPEC3, CB GPWC_1B3 Sep 2026 12:0011 Sep 2026 17:00COMPLETEHV equipt maintenance1
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.