Commissioning / hold point constraint for Golden Plains Wind Farm West
VIC · Other · C_V_GPWFWST_012
Most frequent constraint: Commissioning / hold point constraint for Golden Plains Wind Farm West of 12 MW - HP0B
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
4
% of period
0.2%
Network as built share
0.0%
Equipment outage share
0.0%
Single-plant limit share
100%
Units in constraints
2
MW in constraints
540
Curtailed while constrained
0.1 GWh
Value of that curtailment
$0.0m
Network as built: the limit binds with every line and transformer in service. AEMO marks these “Out = Nil”.
Equipment outage: the limit applies only while a named line or transformer is out of service.
Limit on a single plant: AEMO caps one wind or solar farm. Most are system strength limits, which depend on how many coal, gas or hydro units and synchronous condensers are running nearby.
Constraint-hours by cause, per month
Network as builtEquipment outageLimit on a single plant
Constraints that bound in the period
Constraint
Hours
Cause
Limit type
AEMO description
NC_V_GPWFWST1
2
Limit on a single plant
Non-Conformance
Non Conformance Constraint for GPWF WEST 1
V_GPWFWST1_FLT_0
1
Limit on a single plant
System Strength
Limit Golden Plains wind farm Stage 2 Central Collector Group upper limit to 0MW for system strength requirement
V_GPWFWST2_0WT
1
Limit on a single plant
System Strength
Golden Plains wind farm Stage 2 West Collector Group turbine availability limit of 0. Constraint to violate if Golden Plains wind farm Stage 2 West Collector Group turbine availability greater than 0. Swamp out otherwise. DS only
V_GPWFWST2_FLT_0
1
Limit on a single plant
System Strength
Limit Golden Plains wind farm Stage 2 West Collector Group upper limit to 0MW for system strength requirement
V_GPWFWST1_0WT
1
Limit on a single plant
System Strength
Golden Plains wind farm Stage 2 Central Collector Group turbine availability limit of 0. Constraint to violate if Golden Plains wind farm Stage 2 Central Collector Group turbine availability greater than 0. Swamp out otherwise. DS only
V_GPWFWST1_ZERO
1
Limit on a single plant
Unit Zero
Golden Plains wind farm Stage 2 Central Collector Group upper limit of 0 MW
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.