Commissioning / hold point constraint for Mortlake BESS of +300 MW

VIC · Other · C_V_MLB01_300_G
Most frequent constraint: Commissioning / hold point constraint for Mortlake BESS of +300 MW - HP3
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
0
% of period
0.0%
Network as built share
0.0%
Equipment outage share
50%
Single-plant limit share
50%
Units in constraints
1
MW in constraints
300
Curtailed while constrained
0.0 GWh
Value of that curtailment
$0.0m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
V_MLB01_G_0INV0Equipment outageOtherMortlake Battery inverter limit of zero. Constraint to violate if Mortlake Battery as a generator and inverter availability greater than zero. Swamp out otherwise. DS only
V_MLB01_LE_FLT_00Limit on a single plantSystem StrengthMortlake Battery Energy limit <= 0 MW for system strength requirement
V_MLB01_L_0INV0Equipment outageOtherMortlake Battery inverter limit of zero. Constraint to violate if Mortlake Battery as a load and inverter availability greater than zero. Swamp out otherwise. DS only

Units behind it

UnitFuelMWWeightDirection
Mortlake Battery Energy Storage SystemBattery3001.00charge
Mortlake Battery Energy Storage SystemBattery3001.00discharge

Associated outages

No associated outage overlapped this period.
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.