NEM Dashboard

ITK
Period

Commissioning / hold point constraint for Pine Lodge BESS of 61 MW

VIC · Other · C_V_PLBESS1_061_G
Most frequent constraint: Commissioning / hold point constraint for Pine Lodge BESS of 61 MW - HP1
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
2
% of period
0.1%
Network as built share
0.0%
Equipment outage share
100%
Single-plant limit share
0.0%
Units in constraints
1
MW in constraints
250
Curtailed while constrained
0.0 GWh
Value of that curtailment
$0.0m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
C_V_PLBESS1_061_G2Equipment outageOtherCommissioning / hold point constraint for Pine Lodge BESS of 61 MW - HP1

Units behind it

UnitFuelMWWeightDirection
Pine Lodge BESSBattery2501.00charge
Pine Lodge BESSBattery2501.00discharge

Associated outages

No associated outage overlapped this period.
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.