Out=PEC loop closed, one Bundey to Buronga (6C or 6F) 330 kV line O/S.

NSW · Other · L_PEC_BDBU
Most frequent constraint: Out=PEC loop closed, one Bundey to Buronga (6C or 6F) 330 kV line O/S. Loop flow constraint. Feedback
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
78
% of period
3.6%
Network as built share
0.0%
Equipment outage share
100%
Single-plant limit share
0.0%
Units in constraints
0
MW in constraints
0
Curtailed while constrained
0.0 GWh
Value of that curtailment
$0.0m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
L_PEC_BDBU78Equipment outageOtherOut=PEC loop closed, one Bundey to Buronga (6C or 6F) 330 kV line O/S. Loop flow constraint. Feedback

Units behind it

No units recorded for this area.

Associated outages

SubstationEquipmentStartEndStatusReasonBinding hours (whole outage)
6FLINE 6F16 Nov 2026 07:0020 Nov 2026 16:30COMPLETEHV equipt maintenance77
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.