NEM Dashboard

ITK
Period

Project EnergyConnect loop: N-3 outage constraint

NSW · Other · L_PEC_X_6C_6G_6H
Most frequent constraint: Out=PEC loop closed, N-3 outages around PEC loop, 6C or 6F line plus 330 kV connection between Wagga and Buronga open. Feedback.
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
396
% of period
18%
Network as built share
0.0%
Equipment outage share
100%
Single-plant limit share
0.0%
Units in constraints
0
MW in constraints
0
Curtailed while constrained
0.0 GWh
Value of that curtailment
$0.0m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
L_PEC_X_6C_6G_6H396Equipment outageOtherOut=PEC loop closed, N-3 outages around PEC loop, 6C or 6F line plus 330 kV connection between Wagga and Buronga open. Feedback.

Units behind it

No units recorded for this area.

Associated outages

SubstationEquipmentStartEndStatusReasonBinding hours (whole outage)
BURONGALINE 6C6 Oct 2026 14:004 Nov 2026 06:00COMPLETEHV equipt maintenance274
Source: AEMO. Summary built 25 Nov 2026 02:26; data through 25 Nov 2026 01:25 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.