NEM Dashboard

ITK
Period

Snowy to NSW: transient stability limits (Yass–Bannaby–Marulan)

NSW · Transient Stability · N::N_SDUT_2
Most frequent constraint: Out = Upper Tumut-Stockdill (1) 330kV line, stability limit (Snowy-NSW) for fault of various location between Yass-South Morang area
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
287
% of period
13%
Network as built share
14%
Equipment outage share
86%
Single-plant limit share
0.0%
Units in constraints
101
MW in constraints
23,129
Curtailed while constrained
60.6 GWh
Value of that curtailment
$20.2m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
N::N_CNCW_2145Equipment outageTransient StabilityOut = Canberra-Capital (6) line, stability limit (Snowy-NSW) for critical fault of one 330kV line between Yass and Bannaby/Marulan
N::N_SDUT_2111Equipment outageTransient StabilityOut = Upper Tumut-Stockdill (1) 330kV line, stability limit (Snowy-NSW) for fault of various location between Yass-South Morang area
N>YSTX_TX_NIL_LV36Network as builtThermalOut= One Yass 330/132kV TX, avoid O/L other Yass 132/330kV transformer on trip of Nil, Feedback
N>NIL_YSTX_LV5Network as builtThermalOut= Nil, avoid O/L Either of Yass 132/330 Transformers on trip of Nil, Feedback
N::N_GRRP_24Equipment outageTransient StabilityOut = Gullen Range to Rye Park (3P), stability limit (Snowy-NSW) for loss of Yass-Marulan (4/5) 330kV line
N::N_DTKV_22Equipment outageTransient StabilityOut = Dapto - Kangaroo Valley (18) 330kV line, transient stability limit (Snowy-NSW) for loss of one 330kV line between Yass and Bannaby/Marulan with summated flow on 4+5+61 <=1500

Units behind it

UnitFuelMWWeightDirection
Murray 1Water1,5500.18charge
Tumut 3Water1,5000.99discharge
Waratah Super BatteryBattery8500.82charge
Waratah Super BatteryBattery8500.15discharge
Mt PiperCoal7301.00discharge
EraringCoal7200.30charge
EraringCoal7200.17charge
EraringCoal7200.30charge
EraringCoal7200.17charge
EraringCoal7200.76discharge
EraringCoal7200.76discharge
EraringCoal7201.00discharge
EraringCoal7201.00discharge
BayswaterCoal6850.60discharge
BayswaterCoal6850.60discharge
BayswaterCoal6850.74discharge
Vales Point BCoal6601.00discharge
Vales Point BCoal6601.00discharge
Vales Point BCoal6600.25charge
Vales Point BCoal6600.25charge
Mt PiperCoal6601.00discharge
BayswaterCoal6600.74discharge
Upper TumutWater6161.00discharge
Liddell BESSBattery5001.00charge
Liddell BESSBattery5000.31discharge
Eraring Big BatteryBattery4600.30charge
Eraring Big BatteryBattery4600.76discharge
Wellington North Solar Farm (Lightsource)Solar4370.08charge
Wellington North Solar Farm (Lightsource)Solar4370.65discharge
Orana BESSBattery4150.65discharge
TallawarraCCGT4000.89charge
TallawarraCCGT4001.00discharge
Rye Park Wind FarmWind3961.00discharge
Hunter Power StationOCGT3750.20discharge
Hunter Power StationOCGT3750.20discharge
Hunter Power StationOCGT3750.38charge
Hunter Power StationOCGT3750.38charge
Culcairn Solar FarmSolar3500.98discharge
Tallawarra BOCGT3200.89charge
Tallawarra BOCGT3201.00discharge
Wollar Solar FarmSolar2800.59discharge
Darlington Point Solar FarmSolar2750.99discharge
Sapphire Wind FarmWind2700.96charge
Sapphire Wind FarmWind2700.41discharge
Avonlie Solar FarmSolar2540.99discharge
Williamsdale BESSBattery2500.99discharge
ShoalhavenWater2470.26charge
ShoalhavenWater2471.00discharge
Shoalhaven Pump–2400.26discharge
Shoalhaven Pump–2401.00charge
Limondale Solar Farm 1Solar2300.99discharge
Sunraysia Solar FarmSolar2290.99discharge
CollectorWind2271.00charge
CollectorWind2271.00discharge
Wellington Solar FarmSolar2160.56discharge
Wellington Solar FarmSolar2160.14charge
Stubbo Solar FarmSolar2020.62discharge
New England Solar FarmSolar2000.41discharge
New England Solar FarmSolar2000.96charge
New England Solar FarmSolar2000.96charge
New England Solar FarmSolar2000.41discharge
Glenellen Solar FarmSolar2000.98discharge
Kiamal Solar Farm - Stage 1Solar2000.09discharge
Silverton Wind FarmWind1990.99discharge
Stubbo Solar FarmSolar1980.62discharge
ColongraOCGT1810.82charge
ColongraOCGT1810.15discharge
ColongraOCGT1810.82charge
ColongraOCGT1810.15discharge
ColongraOCGT1810.15discharge
ColongraOCGT1810.15discharge
ColongraOCGT1810.82charge
ColongraOCGT1810.82charge
White Rock Wind Farm - Stage 1Wind1750.41discharge
White Rock Wind Farm - Stage 1Wind1750.95charge
UranquintyOCGT1730.99discharge
UranquintyOCGT1730.99discharge
UranquintyOCGT1730.99discharge
UranquintyOCGT1730.99discharge
Gullen Range Wind FarmWind1661.00discharge
Finley Solar FarmSolar1620.99discharge
Bango 973 Wind FarmWind1590.35charge
Bango 973 Wind FarmWind1590.94discharge
Walla Walla Solar FarmSolar1520.99discharge
Walla Walla Solar FarmSolar1520.99discharge
Coleambally Solar FarmSolar1500.99discharge
Suntop Solar FarmSolar1500.20charge
Suntop Solar FarmSolar1500.57discharge
Flyers Creek Wind FarmWind1460.57discharge
Flyers Creek Wind FarmWind1460.14charge
Crudine Ridge Wind FarmWind1420.72discharge
Crudine Ridge Wind FarmWind1420.08charge
Metz Solar FarmSolar1350.95charge
Metz Solar FarmSolar1350.41discharge
Smithfield Energy FacilityOCGT1260.55charge
Bomen Solar FarmSolar1210.99discharge
Bodangora Wind FarmWind1130.13charge
Bodangora Wind FarmWind1130.57discharge
Boco Rock Wind FarmWind1130.99discharge
Boco Rock Wind FarmWind1130.44charge
Gullen Range Wind Farm 2Wind1111.00discharge
Gunnedah Solar FarmSolar1100.97charge
Gunnedah Solar FarmSolar1100.40discharge
Hillston Sun FarmSolar1100.99discharge
Taralga Wind FarmWind1071.00discharge
West Wyalong Solar FarmSolar1051.00discharge
Nevertire Solar FarmSolar1050.14charge
Nevertire Solar FarmSolar1050.56discharge
Karadoc Solar FarmSolar1040.11discharge
Nyngan Solar PlantSolar1020.56discharge
Nyngan Solar PlantSolar1020.14charge
Capital BatteryBattery1000.42charge
Capital BatteryBattery1000.99discharge
New England BESSBattery1000.41discharge
New England BESSBattery1000.41discharge
Bannerton Solar ParkSolar1000.09discharge
New England BESSBattery1000.96charge
New England BESSBattery1000.96charge
Beryl Solar FarmSolar980.11charge
Beryl Solar FarmSolar980.61discharge
Wemen Solar FarmSolar980.09discharge
Quorn Park Solar HybridSolar970.65discharge
Crookwell 2 Wind FarmWind961.00discharge
Yatpool Solar FarmSolar940.11discharge
Sebastopol Solar FarmSolar901.00discharge
Smithfield BESSBattery860.55charge
Bango 999 Wind FarmWind850.94discharge
Bango 999 Wind FarmWind850.35charge
BloweringWater800.98discharge
Goonumbla Solar FarmSolar700.71charge
Goonumbla Solar FarmSolar700.66discharge
Riverina Energy Storage System 2Battery650.99discharge
Wyalong Solar FarmSolar621.00discharge
Riverina Energy Storage System 1Battery600.99discharge
GuthegaWater600.99discharge
Crookwell 3 Wind FarmWind581.00discharge
Moree Solar FarmSolar560.96charge
Moree Solar FarmSolar560.41discharge
Wagga North Solar FarmSolar560.99discharge
Jemalong SolarSolar551.00charge
Jemalong SolarSolar550.93discharge
Broken Hill Solar PlantSolar530.99discharge
Limondale BESSBattery500.99discharge
Broken HillBattery500.99discharge
Manildra Solar FarmSolar500.60discharge
Wallgrove Grid Battery projectBattery500.59charge
Manildra Solar FarmSolar500.35charge
Parkes Solar FarmSolar500.66discharge
Parkes Solar FarmSolar500.71charge
Woodlawn Wind FarmWind481.00discharge
Woodlawn Wind FarmWind480.31charge
Gunning Wind FarmWind461.00discharge
Gunning Wind FarmWind460.38charge
Molong Solar FarmSolar360.23charge
Molong Solar FarmSolar360.58discharge
Junee Solar FarmSolar361.00discharge
Corowa Solar FarmSolar360.99discharge
Mulwala Solar FarmSolar310.98discharge
Hume Dam NSWWater290.99discharge
Hume Dam VICWater290.09discharge
Limondale Solar Farm 2Solar290.99discharge
Darlington Point Energy Storage SystemBattery250.99discharge
Hunter EconomicZoneOther210.73discharge
Hunter EconomicZoneOther210.38charge
White Rock Solar FarmSolar200.95charge
White Rock Solar FarmSolar200.41discharge
Quorn Park Solar HybridBattery190.65discharge
ACT BESSBattery100.42charge
Gullen Range Solar FarmSolar101.00discharge
ACT BESSBattery100.99discharge
Snowy Pumping–00.99charge

Associated outages

SubstationEquipmentStartEndStatusReasonBinding hours (whole outage)
STOCKDILLINE 115 Sep 2026 08:0027 Sep 2026 16:00COMPLETEHV equipt commissioning85
CANBERRA, CAPITALLINE 628 Oct 2026 06:0016 Nov 2026 16:00COMPLETEHV equipt maintenance73
CAPITAL, CANBERRALINE 630 Sep 2026 07:0019 Oct 2026 16:00COMPLETEHV equipt maintenance69
STOCKDILLINE 120 Oct 2026 07:0027 Oct 2026 15:00COMPLETEHV equipt commissioning26
YASSTRANS 2H26 Oct 2026 07:001 Nov 2026 15:00COMPLETEHV equipt commissioning17
YASSTRANS 1H19 Oct 2026 07:0025 Oct 2026 15:00COMPLETEHV equipt commissioning11
YASSTRANS 1H24 Nov 2026 06:0027 Nov 2026 16:00PTPHV equipt maintenance8
RYE_PARKLINE 330KV_3P17 Nov 2026 05:0021 Nov 2026 16:00COMPLETEHV equipt commissioning4
CAPITAL, CANBERRALINE 610 Sep 2026 07:0014 Sep 2026 17:00COMPLETEHV equipt maintenance2
KANGAROOBUS 5428 Sep 2026 07:0028 Sep 2026 18:00COMPLETEHV equipt maintenance1
KANGAROO, CAPITALLINE 3W25 Aug 2026 07:3030 Aug 2026 18:00COMPLETEHV equipt commissioning1
CANBERRA, CAPITALLINE 62 Sep 2026 07:004 Sep 2026 17:00COMPLETEHV equipt maintenance1
DAPTO, KANGAROOLINE 185 Sep 2026 08:006 Sep 2026 17:00COMPLETEHV equipt maintenance1
WAGGA330, TUMUT3LINE 0515 Sep 2026 05:009 Sep 2026 18:00COMPLETEHV equipt commissioning1
STOCKDILLINE 119 Nov 2026 19:1223 Nov 2026 19:12COMPLETEHV equipt maintenance1
DDTS, SMTSLINE DDTS_SMTS2_33030 Sep 2026 07:0030 Sep 2026 18:00COMPLETEHV equipt maintenance0
Source: AEMO. Summary built 25 Nov 2026 02:26; data through 25 Nov 2026 01:25 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.