Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV

NSW · Thermal · N>>NIL_060_051
Most frequent constraint: Out= Nil, avoid O/L Jindera to Wodonga (60) 330kV line using 15 mins rating on trip of Wagga to Lower Tumut (051) 330kV line, Feedback
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
815
% of period
38%
Network as built share
69%
Equipment outage share
31%
Single-plant limit share
0.0%
Units in constraints
74
MW in constraints
11,954
Curtailed while constrained
447 GWh
Value of that curtailment
$22.4m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
N>>NIL_060_051357Network as builtThermalOut= Nil, avoid O/L Jindera to Wodonga (60) 330kV line using 15 mins rating on trip of Wagga to Lower Tumut (051) 330kV line, Feedback
N>>6CGH_060_051244Equipment outageThermalOut= 6C, 6G, 6H 330kV lines, avoid O/L Jindera to Wodonga (60) 330kV line using 15 mins rating on trip of Wagga to Lower Tumut (051) 330kV line, Feedback
N^^N_6CGH_WGLT182Network as builtVoltage StabilityOut=Nil, limit Wagga to Lower Tumut (51) 330kV line flow to avoid voltage collapse post contingency trip of line 51, Feedback
N^^N_NIL_WGLT178Network as builtVoltage StabilityOut=Nil, limit Wagga to Lower Tumut (051) 330kV line flow to avoid voltage collapse post contingency trip of line 51, Feedback
N^^N_NIL_LTWG66Network as builtVoltage StabilityOut=Nil, limit Lower Tumut to Wagga 330kV line flow to avoid voltage collapse post contingency trip of line 51, Feedback
V>>N_NIL_65_05134Network as builtThermalOut = NIL, avoid O/L Murray to Upper Tumut (65) on trip of Wagga to Lower Tumut (051) line, Feedback
V^^N_NIL_133Network as builtVoltage StabilityOut = Nil, avoid voltage collapse around Murray for loss of all APD potlines
N>>BDBU_060_05118Equipment outageThermalOut= Bundey to Buronga (6F) 330kV Line, avoid O/L Jindera to Wodonga (60) 330kV line on trip of Wagga to Lower Tumut (051) 330kV line, Feedback
V^^N_SDUT_111Equipment outageVoltage StabilityOut = Stockdill to Upper Tumut (1) line, avoid voltage collapse around Murray for loss of all APD potlines
V^^N_BADP_110Equipment outageVoltage StabilityOut = Balranald to Darlington Point (X5) 220kV line, avoid voltage collapse around Murray for loss of all APD potlines
N^^N_6CGH_X5_BESH8Network as builtVoltage StabilityOut= Nil, limit power flow on line X5 from Balranald to Darlington Point (X5) to avoid voltage collapse at Balranald for contingency trip of Bendigo to Shepparton 220kV line in NW Victoria
V^^N_GRYS_17Equipment outageVoltage StabilityOut = Gullen Range to Yass (3J), avoid voltage collapse around Murray for loss of all APD potlines
CA_BRIS_59B1EA1C_15Equipment outageThermalConstraint Automation, O/L 65:LSM1:I:330@MURRAY@VIC for CTG LHPA on trip of LTSS-MSS (66) 330KV LINE. Generated by STNET[NORCR1] Host BNEREGEEMP5(EMPBRI)
V>>N_051+X5_65_665Equipment outageThermalOut = Lower Tumut to Wagga (051) 330kV line, avoid O/L Murray to Upper Tumut (65) 330kV line on trip of Murray to Lower Tumut (66) 330kV line, Wagga to Yass 132kV network split, X5 or 63 opened, 9R4 opened and 2 Yass transformers in service, Feedback
V^^N_BADP_DTKV_13Equipment outageVoltage StabilityOut = Balranald to Darlington Point (X5) 220kV line and Dapto - Kangaroo Valley (18) 330kV line, avoid voltage collapse around Murray for loss of all APD potlines
N^^N_6CGH_X5_BEKG3Equipment outageVoltage StabilityOut= 6C, 6G, 6H 330kV lines, limit power flow on line X5 from Balranald to Darlington Point (X5) to avoid voltage collapse at Balranald for contingency trip of Bendigo to Kerang 220kV line and other nearby lines in NW Victoria
N^^N_NIL_X5_BESH1Network as builtVoltage StabilityOut= Nil, limit power flow on line X5 from Balranald to Darlington Point (X5) to avoid voltage collapse at Balranald for contingency trip of Bendigo to Shepparton 220kV line in NW Victoria
N::N_6CGH_631Equipment outageTransient StabilityOut = 6C, 6G, 6H 330kV lines, limit Darlington Point to Wagga line (63) line flow to avoid voltage collapse at Darlington Point 132kV post contingency trip of line 63, Feedback
N>>NIL_996_621Network as builtThermalOut = Nil, avoid Wagga to ANM (996) 132kV line O/L on Walla Walla to Jindera (62) 330kV line trip; Feedback (Note: constraint swamped when 996 is O/S)
N^^N_NIL_X5_BEKG0Network as builtVoltage StabilityOut= Nil, limit power flow on line X5 from Balranald to Darlington Point (X5) to avoid voltage collapse at Balranald for contingency trip of Bendigo to Kerang 220kV line and other nearby lines in NW Victoria
V^^N_DTMN_10Equipment outageVoltage StabilityOut = Dapto to Marulan (8) 330kV Line, avoid voltage collapse around Murray for loss of all APD potlines
N>>V_6CGH_65_660Equipment outageThermalOut = 6C, 6G, 6H 330kV lines, avoid Upper Tumut to Murray(65) using 15 mins rating O/L on Lower Tumut to Murray(66) trip; (Note: constraint is swamped out if TL 64 is O/S)
N>>V_DDMS_051_67_N0Equipment outageThermalOut= Dederang to Murray (67 or 68) 330 kV line, avoid O/L Wagga to Lower Tumut (051) 330kV line on trip of the remaining Dederang to Murray 330kV line, Feedback
V>>N_6CGH_65_660Equipment outageThermalOut = 6C, 6G, 6H 330kV lines, avoid Murray to Upper Tumut(65) O/L on Murray to Lower Tumut(66) trip; Feedback
V^^N_DTSS_10Equipment outageVoltage StabilityOut = Dapto-Sydney South(11), avoid voltage collapse around Murray for loss of all APD potlines

Units behind it

UnitFuelMWWeightDirection
Murray 1Water1,5501.00charge
Murray 1Water1,5501.00discharge
Tumut 3Water1,5000.24charge
Tumut 3Water1,5001.00discharge
Upper TumutWater6160.64charge
Upper TumutWater6161.00discharge
Culcairn Solar FarmSolar3500.79charge
Culcairn Solar FarmSolar3501.00discharge
Bogong / MackayWater3000.84charge
Bogong / MackayWater3000.36discharge
Darlington Point Solar FarmSolar2751.00discharge
Darlington Point Solar FarmSolar2751.00charge
Avonlie Solar FarmSolar2540.97charge
Avonlie Solar FarmSolar2541.00discharge
Goorambat East Solar Farm (ENGIE)Solar2500.39discharge
ShoalhavenWater2471.00discharge
Shoalhaven Pump–2401.00charge
Ararat Wind FarmWind2400.90charge
Limondale Solar Farm 1Solar2300.90charge
Limondale Solar Farm 1Solar2301.00discharge
Sunraysia Solar FarmSolar2291.00discharge
Sunraysia Solar FarmSolar2290.90charge
Murra Warra Wind Farm - stage 1Wind2260.29discharge
Murra Warra Wind Farm - stage 1Wind2260.90charge
Murra Warra Wind Farm - stage 2Wind2090.90charge
Murra Warra Wind Farm - stage 2Wind2090.29discharge
Bulgana Green Power Hub - Wind FarmWind2040.90charge
Bulgana Green Power Hub - Wind FarmWind2040.17discharge
Glenellen Solar FarmSolar2001.00discharge
Glenellen Solar FarmSolar2000.88charge
Kiamal Solar Farm - Stage 1Solar2000.90charge
Kiamal Solar Farm - Stage 1Solar2000.47discharge
Silverton Wind FarmWind1991.00charge
Silverton Wind FarmWind1991.00discharge
Koorangie Energy Storage SystemBattery1850.90charge
DartmouthWater1850.36discharge
Koorangie Energy Storage SystemBattery1850.36discharge
DartmouthWater1850.84charge
UranquintyOCGT1731.00discharge
UranquintyOCGT1730.94charge
UranquintyOCGT1730.94charge
UranquintyOCGT1731.00discharge
UranquintyOCGT1730.94charge
UranquintyOCGT1731.00discharge
UranquintyOCGT1730.94charge
UranquintyOCGT1731.00discharge
Finley Solar FarmSolar1621.00discharge
Finley Solar FarmSolar1620.88charge
Bango 973 Wind FarmWind1590.93discharge
Bango 973 Wind FarmWind1590.66charge
Walla Walla Solar FarmSolar1521.00discharge
Walla Walla Solar FarmSolar1521.00discharge
Walla Walla Solar FarmSolar1520.78charge
Walla Walla Solar FarmSolar1520.78charge
Coleambally Solar FarmSolar1500.99charge
Coleambally Solar FarmSolar1501.00discharge
Suntop Solar FarmSolar1500.08discharge
Carwarp Solar FarmSolar1500.49discharge
Glenrowan West Solar FarmSolar1320.39discharge
Glenrowan Solar FarmSolar1260.39discharge
Bomen Solar FarmSolar1210.91charge
Bomen Solar FarmSolar1211.00discharge
Boco Rock Wind FarmWind1130.99discharge
Boco Rock Wind FarmWind1130.14charge
Hillston Sun FarmSolar1101.00discharge
Hillston Sun FarmSolar1101.00charge
West Wyalong Solar FarmSolar1050.91charge
West Wyalong Solar FarmSolar1051.00discharge
Karadoc Solar FarmSolar1040.56discharge
Karadoc Solar FarmSolar1040.90charge
Numurkah Solar FarmSolar1010.38discharge
Capital BatteryBattery1000.16charge
Capital BatteryBattery1000.99discharge
Bannerton Solar ParkSolar1000.90charge
Bannerton Solar ParkSolar1000.48discharge
Wemen Solar FarmSolar980.90charge
Wemen Solar FarmSolar980.48discharge
Lancaster Solar FarmSolar950.38discharge
Yatpool Solar FarmSolar940.56discharge
Yatpool Solar FarmSolar940.90charge
Wunghnu Solar FarmSolar940.38discharge
Girgarre Solar FarmSolar930.38discharge
Sebastopol Solar FarmSolar900.91charge
Sebastopol Solar FarmSolar901.00discharge
Winton Solar FarmSolar850.39discharge
Bango 999 Wind FarmWind850.66charge
Bango 999 Wind FarmWind850.93discharge
BloweringWater801.00discharge
BloweringWater800.58charge
Crowlands Wind FarmWind800.90charge
Crowlands Wind FarmWind800.16discharge
Goonumbla Solar FarmSolar700.29discharge
Goonumbla Solar FarmSolar700.21charge
West KiewaWater680.36discharge
West KiewaWater680.84charge
EildonWater680.84charge
EildonWater680.84charge
EildonWater680.16discharge
EildonWater680.16discharge
Riverina Energy Storage System 2Battery651.00charge
Riverina Energy Storage System 2Battery651.00discharge
Wyalong Solar FarmSolar620.91charge
Wyalong Solar FarmSolar621.00discharge
GuthegaWater601.00charge
Riverina Energy Storage System 1Battery601.00discharge
GuthegaWater601.00discharge
Riverina Energy Storage System 1Battery601.00charge
Wagga North Solar FarmSolar560.91charge
Wagga North Solar FarmSolar561.00discharge
Jemalong SolarSolar550.29charge
Gannawarra Solar FarmSolar550.35discharge
Jemalong SolarSolar550.98discharge
Gannawarra Solar FarmSolar550.90charge
Broken Hill Solar PlantSolar531.00charge
Broken Hill Solar PlantSolar531.00discharge
Broken HillBattery501.00charge
Manildra Solar FarmSolar500.14discharge
Broken HillBattery501.00discharge
Limondale BESSBattery501.00discharge
Limondale BESSBattery500.90charge
Parkes Solar FarmSolar500.21charge
Parkes Solar FarmSolar500.29discharge
Woodlawn Wind FarmWind480.09charge
Woodlawn Wind FarmWind481.00discharge
Gunning Wind FarmWind460.71charge
Gunning Wind FarmWind461.00discharge
Mokoan Solar Farm (1999)Solar460.39discharge
Molong Solar FarmSolar360.10discharge
Corowa Solar FarmSolar361.00discharge
Junee Solar FarmSolar361.00discharge
Corowa Solar FarmSolar360.80charge
Junee Solar FarmSolar360.91charge
West KiewaWater340.84charge
Mulwala Solar FarmSolar311.00discharge
Mulwala Solar FarmSolar310.83charge
Cohuna Solar FarmSolar310.90charge
Cohuna Solar FarmSolar310.35discharge
Kiata Wind FarmWind310.24discharge
Kiata Wind FarmWind310.90charge
Kerang Solar PlantSolar300.90charge
Kerang Solar PlantSolar300.35discharge
Hume Dam NSWWater291.00discharge
Hume Dam VICWater290.84discharge
Hume Dam VICWater290.18charge
Hume Dam NSWWater291.00charge
Limondale Solar Farm 2Solar291.00discharge
Limondale Solar Farm 2Solar290.90charge
Gannawarra Energy Storage SystemBattery250.90charge
Gannawarra Energy Storage SystemBattery250.35discharge
Darlington Point Energy Storage SystemBattery251.00charge
Darlington Point Energy Storage SystemBattery251.00discharge
Bulgana Green Power Hub - BESSBattery200.90charge
Bulgana Green Power Hub - BESSBattery200.17discharge
ACT BESSBattery100.99discharge
ACT BESSBattery100.16charge
Snowy Pumping–01.00charge
Snowy Pumping–00.24discharge

Associated outages

SubstationEquipmentStartEndStatusReasonBinding hours (whole outage)
BURONGALINE 6C6 Oct 2026 14:004 Nov 2026 06:00COMPLETEHV equipt maintenance243
BURONGALINE 6F29 Sep 2026 07:001 Oct 2026 12:00COMPLETEHV equipt commissioning18
STOCKDILLINE 115 Sep 2026 08:0027 Sep 2026 16:00COMPLETEHV equipt commissioning11
WAGGA330, TUMUT3LINE 0515 Sep 2026 05:009 Sep 2026 18:00COMPLETEHV equipt commissioning10
BUNDEY, 6FCB CB9057, REACT REACT_BUR1, LINE 6F, CB CB9052, CB CB905429 Sep 2026 09:3029 Sep 2026 16:30COMPLETEHV equipt maintenance7
RYE_PARKLINE 330KV_3P17 Nov 2026 05:0021 Nov 2026 16:00COMPLETEHV equipt commissioning7
MULWALACB 7B1, CB MWA7B15 Sep 2026 05:009 Sep 2026 18:00PTPHV equipt maintenance5
BURONGA, BALRANLDLINE X5/3, LINE X313 Sep 2026 05:0015 Sep 2026 19:00COMPLETEHV equipt commissioning5
DAPTO, KANGAROOLINE 185 Sep 2026 08:006 Sep 2026 17:00COMPLETEHV equipt maintenance3
BURONGABUS B13 Sep 2026 05:0013 Sep 2026 11:00COMPLETEHV equipt commissioning1
DAPTOBUS 5B115 Sep 2026 07:0018 Sep 2026 17:00COMPLETEHV equipt commissioning0
MARULAN, DAPTOLINE 815 Sep 2026 07:0018 Sep 2026 17:00COMPLETEHV equipt commissioning0
STOCKDILLINE 120 Oct 2026 07:0027 Oct 2026 15:00COMPLETEHV equipt commissioning0
MURRAY, DDTSLINE DDTS_MSS1_33010 Sep 2026 07:0010 Sep 2026 17:00SUBMITHV equipt maintenance0
SYD_STHBUS 5A119 Sep 2026 06:0019 Sep 2026 18:00COMPLETEHV equipt maintenance0
MURRAY, DDTSLINE DDTS_MSS2_33010 Sep 2026 07:0010 Sep 2026 18:00COMPLETEHV equipt maintenance0
Source: AEMO. Summary built 25 Nov 2026 02:26; data through 25 Nov 2026 01:25 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.