| Constraint | Hours | Cause | Limit type | AEMO description |
|---|---|---|---|---|
| N>>NIL_060_051 | 357 | Network as built | Thermal | Out= Nil, avoid O/L Jindera to Wodonga (60) 330kV line using 15 mins rating on trip of Wagga to Lower Tumut (051) 330kV line, Feedback |
| N>>6CGH_060_051 | 244 | Equipment outage | Thermal | Out= 6C, 6G, 6H 330kV lines, avoid O/L Jindera to Wodonga (60) 330kV line using 15 mins rating on trip of Wagga to Lower Tumut (051) 330kV line, Feedback |
| N^^N_6CGH_WGLT | 182 | Network as built | Voltage Stability | Out=Nil, limit Wagga to Lower Tumut (51) 330kV line flow to avoid voltage collapse post contingency trip of line 51, Feedback |
| N^^N_NIL_WGLT | 178 | Network as built | Voltage Stability | Out=Nil, limit Wagga to Lower Tumut (051) 330kV line flow to avoid voltage collapse post contingency trip of line 51, Feedback |
| N^^N_NIL_LTWG | 66 | Network as built | Voltage Stability | Out=Nil, limit Lower Tumut to Wagga 330kV line flow to avoid voltage collapse post contingency trip of line 51, Feedback |
| V>>N_NIL_65_051 | 34 | Network as built | Thermal | Out = NIL, avoid O/L Murray to Upper Tumut (65) on trip of Wagga to Lower Tumut (051) line, Feedback |
| V^^N_NIL_1 | 33 | Network as built | Voltage Stability | Out = Nil, avoid voltage collapse around Murray for loss of all APD potlines |
| N>>BDBU_060_051 | 18 | Equipment outage | Thermal | Out= Bundey to Buronga (6F) 330kV Line, avoid O/L Jindera to Wodonga (60) 330kV line on trip of Wagga to Lower Tumut (051) 330kV line, Feedback |
| V^^N_SDUT_1 | 11 | Equipment outage | Voltage Stability | Out = Stockdill to Upper Tumut (1) line, avoid voltage collapse around Murray for loss of all APD potlines |
| V^^N_BADP_1 | 10 | Equipment outage | Voltage Stability | Out = Balranald to Darlington Point (X5) 220kV line, avoid voltage collapse around Murray for loss of all APD potlines |
| N^^N_6CGH_X5_BESH | 8 | Network as built | Voltage Stability | Out= Nil, limit power flow on line X5 from Balranald to Darlington Point (X5) to avoid voltage collapse at Balranald for contingency trip of Bendigo to Shepparton 220kV line in NW Victoria |
| V^^N_GRYS_1 | 7 | Equipment outage | Voltage Stability | Out = Gullen Range to Yass (3J), avoid voltage collapse around Murray for loss of all APD potlines |
| CA_BRIS_59B1EA1C_1 | 5 | Equipment outage | Thermal | Constraint Automation, O/L 65:LSM1:I:330@MURRAY@VIC for CTG LHPA on trip of LTSS-MSS (66) 330KV LINE. Generated by STNET[NORCR1] Host BNEREGEEMP5(EMPBRI) |
| V>>N_051+X5_65_66 | 5 | Equipment outage | Thermal | Out = Lower Tumut to Wagga (051) 330kV line, avoid O/L Murray to Upper Tumut (65) 330kV line on trip of Murray to Lower Tumut (66) 330kV line, Wagga to Yass 132kV network split, X5 or 63 opened, 9R4 opened and 2 Yass transformers in service, Feedback |
| V^^N_BADP_DTKV_1 | 3 | Equipment outage | Voltage Stability | Out = Balranald to Darlington Point (X5) 220kV line and Dapto - Kangaroo Valley (18) 330kV line, avoid voltage collapse around Murray for loss of all APD potlines |
| N^^N_6CGH_X5_BEKG | 3 | Equipment outage | Voltage Stability | Out= 6C, 6G, 6H 330kV lines, limit power flow on line X5 from Balranald to Darlington Point (X5) to avoid voltage collapse at Balranald for contingency trip of Bendigo to Kerang 220kV line and other nearby lines in NW Victoria |
| N^^N_NIL_X5_BESH | 1 | Network as built | Voltage Stability | Out= Nil, limit power flow on line X5 from Balranald to Darlington Point (X5) to avoid voltage collapse at Balranald for contingency trip of Bendigo to Shepparton 220kV line in NW Victoria |
| N::N_6CGH_63 | 1 | Equipment outage | Transient Stability | Out = 6C, 6G, 6H 330kV lines, limit Darlington Point to Wagga line (63) line flow to avoid voltage collapse at Darlington Point 132kV post contingency trip of line 63, Feedback |
| N>>NIL_996_62 | 1 | Network as built | Thermal | Out = Nil, avoid Wagga to ANM (996) 132kV line O/L on Walla Walla to Jindera (62) 330kV line trip; Feedback (Note: constraint swamped when 996 is O/S) |
| N^^N_NIL_X5_BEKG | 0 | Network as built | Voltage Stability | Out= Nil, limit power flow on line X5 from Balranald to Darlington Point (X5) to avoid voltage collapse at Balranald for contingency trip of Bendigo to Kerang 220kV line and other nearby lines in NW Victoria |
| V^^N_DTMN_1 | 0 | Equipment outage | Voltage Stability | Out = Dapto to Marulan (8) 330kV Line, avoid voltage collapse around Murray for loss of all APD potlines |
| N>>V_6CGH_65_66 | 0 | Equipment outage | Thermal | Out = 6C, 6G, 6H 330kV lines, avoid Upper Tumut to Murray(65) using 15 mins rating O/L on Lower Tumut to Murray(66) trip; (Note: constraint is swamped out if TL 64 is O/S) |
| N>>V_DDMS_051_67_N | 0 | Equipment outage | Thermal | Out= Dederang to Murray (67 or 68) 330 kV line, avoid O/L Wagga to Lower Tumut (051) 330kV line on trip of the remaining Dederang to Murray 330kV line, Feedback |
| V>>N_6CGH_65_66 | 0 | Equipment outage | Thermal | Out = 6C, 6G, 6H 330kV lines, avoid Murray to Upper Tumut(65) O/L on Murray to Lower Tumut(66) trip; Feedback |
| V^^N_DTSS_1 | 0 | Equipment outage | Voltage Stability | Out = Dapto-Sydney South(11), avoid voltage collapse around Murray for loss of all APD potlines |
| Unit | Fuel | MW | Weight | Direction |
|---|---|---|---|---|
| Murray 1 | Water | 1,550 | 1.00 | charge |
| Murray 1 | Water | 1,550 | 1.00 | discharge |
| Tumut 3 | Water | 1,500 | 0.24 | charge |
| Tumut 3 | Water | 1,500 | 1.00 | discharge |
| Upper Tumut | Water | 616 | 0.64 | charge |
| Upper Tumut | Water | 616 | 1.00 | discharge |
| Culcairn Solar Farm | Solar | 350 | 0.79 | charge |
| Culcairn Solar Farm | Solar | 350 | 1.00 | discharge |
| Bogong / Mackay | Water | 300 | 0.84 | charge |
| Bogong / Mackay | Water | 300 | 0.36 | discharge |
| Darlington Point Solar Farm | Solar | 275 | 1.00 | discharge |
| Darlington Point Solar Farm | Solar | 275 | 1.00 | charge |
| Avonlie Solar Farm | Solar | 254 | 0.97 | charge |
| Avonlie Solar Farm | Solar | 254 | 1.00 | discharge |
| Goorambat East Solar Farm (ENGIE) | Solar | 250 | 0.39 | discharge |
| Shoalhaven | Water | 247 | 1.00 | discharge |
| Shoalhaven Pump | – | 240 | 1.00 | charge |
| Ararat Wind Farm | Wind | 240 | 0.90 | charge |
| Limondale Solar Farm 1 | Solar | 230 | 0.90 | charge |
| Limondale Solar Farm 1 | Solar | 230 | 1.00 | discharge |
| Sunraysia Solar Farm | Solar | 229 | 1.00 | discharge |
| Sunraysia Solar Farm | Solar | 229 | 0.90 | charge |
| Murra Warra Wind Farm - stage 1 | Wind | 226 | 0.29 | discharge |
| Murra Warra Wind Farm - stage 1 | Wind | 226 | 0.90 | charge |
| Murra Warra Wind Farm - stage 2 | Wind | 209 | 0.90 | charge |
| Murra Warra Wind Farm - stage 2 | Wind | 209 | 0.29 | discharge |
| Bulgana Green Power Hub - Wind Farm | Wind | 204 | 0.90 | charge |
| Bulgana Green Power Hub - Wind Farm | Wind | 204 | 0.17 | discharge |
| Glenellen Solar Farm | Solar | 200 | 1.00 | discharge |
| Glenellen Solar Farm | Solar | 200 | 0.88 | charge |
| Kiamal Solar Farm - Stage 1 | Solar | 200 | 0.90 | charge |
| Kiamal Solar Farm - Stage 1 | Solar | 200 | 0.47 | discharge |
| Silverton Wind Farm | Wind | 199 | 1.00 | charge |
| Silverton Wind Farm | Wind | 199 | 1.00 | discharge |
| Koorangie Energy Storage System | Battery | 185 | 0.90 | charge |
| Dartmouth | Water | 185 | 0.36 | discharge |
| Koorangie Energy Storage System | Battery | 185 | 0.36 | discharge |
| Dartmouth | Water | 185 | 0.84 | charge |
| Uranquinty | OCGT | 173 | 1.00 | discharge |
| Uranquinty | OCGT | 173 | 0.94 | charge |
| Uranquinty | OCGT | 173 | 0.94 | charge |
| Uranquinty | OCGT | 173 | 1.00 | discharge |
| Uranquinty | OCGT | 173 | 0.94 | charge |
| Uranquinty | OCGT | 173 | 1.00 | discharge |
| Uranquinty | OCGT | 173 | 0.94 | charge |
| Uranquinty | OCGT | 173 | 1.00 | discharge |
| Finley Solar Farm | Solar | 162 | 1.00 | discharge |
| Finley Solar Farm | Solar | 162 | 0.88 | charge |
| Bango 973 Wind Farm | Wind | 159 | 0.93 | discharge |
| Bango 973 Wind Farm | Wind | 159 | 0.66 | charge |
| Walla Walla Solar Farm | Solar | 152 | 1.00 | discharge |
| Walla Walla Solar Farm | Solar | 152 | 1.00 | discharge |
| Walla Walla Solar Farm | Solar | 152 | 0.78 | charge |
| Walla Walla Solar Farm | Solar | 152 | 0.78 | charge |
| Coleambally Solar Farm | Solar | 150 | 0.99 | charge |
| Coleambally Solar Farm | Solar | 150 | 1.00 | discharge |
| Suntop Solar Farm | Solar | 150 | 0.08 | discharge |
| Carwarp Solar Farm | Solar | 150 | 0.49 | discharge |
| Glenrowan West Solar Farm | Solar | 132 | 0.39 | discharge |
| Glenrowan Solar Farm | Solar | 126 | 0.39 | discharge |
| Bomen Solar Farm | Solar | 121 | 0.91 | charge |
| Bomen Solar Farm | Solar | 121 | 1.00 | discharge |
| Boco Rock Wind Farm | Wind | 113 | 0.99 | discharge |
| Boco Rock Wind Farm | Wind | 113 | 0.14 | charge |
| Hillston Sun Farm | Solar | 110 | 1.00 | discharge |
| Hillston Sun Farm | Solar | 110 | 1.00 | charge |
| West Wyalong Solar Farm | Solar | 105 | 0.91 | charge |
| West Wyalong Solar Farm | Solar | 105 | 1.00 | discharge |
| Karadoc Solar Farm | Solar | 104 | 0.56 | discharge |
| Karadoc Solar Farm | Solar | 104 | 0.90 | charge |
| Numurkah Solar Farm | Solar | 101 | 0.38 | discharge |
| Capital Battery | Battery | 100 | 0.16 | charge |
| Capital Battery | Battery | 100 | 0.99 | discharge |
| Bannerton Solar Park | Solar | 100 | 0.90 | charge |
| Bannerton Solar Park | Solar | 100 | 0.48 | discharge |
| Wemen Solar Farm | Solar | 98 | 0.90 | charge |
| Wemen Solar Farm | Solar | 98 | 0.48 | discharge |
| Lancaster Solar Farm | Solar | 95 | 0.38 | discharge |
| Yatpool Solar Farm | Solar | 94 | 0.56 | discharge |
| Yatpool Solar Farm | Solar | 94 | 0.90 | charge |
| Wunghnu Solar Farm | Solar | 94 | 0.38 | discharge |
| Girgarre Solar Farm | Solar | 93 | 0.38 | discharge |
| Sebastopol Solar Farm | Solar | 90 | 0.91 | charge |
| Sebastopol Solar Farm | Solar | 90 | 1.00 | discharge |
| Winton Solar Farm | Solar | 85 | 0.39 | discharge |
| Bango 999 Wind Farm | Wind | 85 | 0.66 | charge |
| Bango 999 Wind Farm | Wind | 85 | 0.93 | discharge |
| Blowering | Water | 80 | 1.00 | discharge |
| Blowering | Water | 80 | 0.58 | charge |
| Crowlands Wind Farm | Wind | 80 | 0.90 | charge |
| Crowlands Wind Farm | Wind | 80 | 0.16 | discharge |
| Goonumbla Solar Farm | Solar | 70 | 0.29 | discharge |
| Goonumbla Solar Farm | Solar | 70 | 0.21 | charge |
| West Kiewa | Water | 68 | 0.36 | discharge |
| West Kiewa | Water | 68 | 0.84 | charge |
| Eildon | Water | 68 | 0.84 | charge |
| Eildon | Water | 68 | 0.84 | charge |
| Eildon | Water | 68 | 0.16 | discharge |
| Eildon | Water | 68 | 0.16 | discharge |
| Riverina Energy Storage System 2 | Battery | 65 | 1.00 | charge |
| Riverina Energy Storage System 2 | Battery | 65 | 1.00 | discharge |
| Wyalong Solar Farm | Solar | 62 | 0.91 | charge |
| Wyalong Solar Farm | Solar | 62 | 1.00 | discharge |
| Guthega | Water | 60 | 1.00 | charge |
| Riverina Energy Storage System 1 | Battery | 60 | 1.00 | discharge |
| Guthega | Water | 60 | 1.00 | discharge |
| Riverina Energy Storage System 1 | Battery | 60 | 1.00 | charge |
| Wagga North Solar Farm | Solar | 56 | 0.91 | charge |
| Wagga North Solar Farm | Solar | 56 | 1.00 | discharge |
| Jemalong Solar | Solar | 55 | 0.29 | charge |
| Gannawarra Solar Farm | Solar | 55 | 0.35 | discharge |
| Jemalong Solar | Solar | 55 | 0.98 | discharge |
| Gannawarra Solar Farm | Solar | 55 | 0.90 | charge |
| Broken Hill Solar Plant | Solar | 53 | 1.00 | charge |
| Broken Hill Solar Plant | Solar | 53 | 1.00 | discharge |
| Broken Hill | Battery | 50 | 1.00 | charge |
| Manildra Solar Farm | Solar | 50 | 0.14 | discharge |
| Broken Hill | Battery | 50 | 1.00 | discharge |
| Limondale BESS | Battery | 50 | 1.00 | discharge |
| Limondale BESS | Battery | 50 | 0.90 | charge |
| Parkes Solar Farm | Solar | 50 | 0.21 | charge |
| Parkes Solar Farm | Solar | 50 | 0.29 | discharge |
| Woodlawn Wind Farm | Wind | 48 | 0.09 | charge |
| Woodlawn Wind Farm | Wind | 48 | 1.00 | discharge |
| Gunning Wind Farm | Wind | 46 | 0.71 | charge |
| Gunning Wind Farm | Wind | 46 | 1.00 | discharge |
| Mokoan Solar Farm (1999) | Solar | 46 | 0.39 | discharge |
| Molong Solar Farm | Solar | 36 | 0.10 | discharge |
| Corowa Solar Farm | Solar | 36 | 1.00 | discharge |
| Junee Solar Farm | Solar | 36 | 1.00 | discharge |
| Corowa Solar Farm | Solar | 36 | 0.80 | charge |
| Junee Solar Farm | Solar | 36 | 0.91 | charge |
| West Kiewa | Water | 34 | 0.84 | charge |
| Mulwala Solar Farm | Solar | 31 | 1.00 | discharge |
| Mulwala Solar Farm | Solar | 31 | 0.83 | charge |
| Cohuna Solar Farm | Solar | 31 | 0.90 | charge |
| Cohuna Solar Farm | Solar | 31 | 0.35 | discharge |
| Kiata Wind Farm | Wind | 31 | 0.24 | discharge |
| Kiata Wind Farm | Wind | 31 | 0.90 | charge |
| Kerang Solar Plant | Solar | 30 | 0.90 | charge |
| Kerang Solar Plant | Solar | 30 | 0.35 | discharge |
| Hume Dam NSW | Water | 29 | 1.00 | discharge |
| Hume Dam VIC | Water | 29 | 0.84 | discharge |
| Hume Dam VIC | Water | 29 | 0.18 | charge |
| Hume Dam NSW | Water | 29 | 1.00 | charge |
| Limondale Solar Farm 2 | Solar | 29 | 1.00 | discharge |
| Limondale Solar Farm 2 | Solar | 29 | 0.90 | charge |
| Gannawarra Energy Storage System | Battery | 25 | 0.90 | charge |
| Gannawarra Energy Storage System | Battery | 25 | 0.35 | discharge |
| Darlington Point Energy Storage System | Battery | 25 | 1.00 | charge |
| Darlington Point Energy Storage System | Battery | 25 | 1.00 | discharge |
| Bulgana Green Power Hub - BESS | Battery | 20 | 0.90 | charge |
| Bulgana Green Power Hub - BESS | Battery | 20 | 0.17 | discharge |
| ACT BESS | Battery | 10 | 0.99 | discharge |
| ACT BESS | Battery | 10 | 0.16 | charge |
| Snowy Pumping | – | 0 | 1.00 | charge |
| Snowy Pumping | – | 0 | 0.24 | discharge |
| Substation | Equipment | Start | End | Status | Reason | Binding hours (whole outage) |
|---|---|---|---|---|---|---|
| BURONGA | LINE 6C | 6 Oct 2026 14:00 | 4 Nov 2026 06:00 | COMPLETE | HV equipt maintenance | 243 |
| BURONGA | LINE 6F | 29 Sep 2026 07:00 | 1 Oct 2026 12:00 | COMPLETE | HV equipt commissioning | 18 |
| STOCKDIL | LINE 1 | 15 Sep 2026 08:00 | 27 Sep 2026 16:00 | COMPLETE | HV equipt commissioning | 11 |
| WAGGA330, TUMUT3 | LINE 051 | 5 Sep 2026 05:00 | 9 Sep 2026 18:00 | COMPLETE | HV equipt commissioning | 10 |
| BUNDEY, 6F | CB CB9057, REACT REACT_BUR1, LINE 6F, CB CB9052, CB CB9054 | 29 Sep 2026 09:30 | 29 Sep 2026 16:30 | COMPLETE | HV equipt maintenance | 7 |
| RYE_PARK | LINE 330KV_3P | 17 Nov 2026 05:00 | 21 Nov 2026 16:00 | COMPLETE | HV equipt commissioning | 7 |
| MULWALA | CB 7B1, CB MWA7B1 | 5 Sep 2026 05:00 | 9 Sep 2026 18:00 | PTP | HV equipt maintenance | 5 |
| BURONGA, BALRANLD | LINE X5/3, LINE X3 | 13 Sep 2026 05:00 | 15 Sep 2026 19:00 | COMPLETE | HV equipt commissioning | 5 |
| DAPTO, KANGAROO | LINE 18 | 5 Sep 2026 08:00 | 6 Sep 2026 17:00 | COMPLETE | HV equipt maintenance | 3 |
| BURONGA | BUS B | 13 Sep 2026 05:00 | 13 Sep 2026 11:00 | COMPLETE | HV equipt commissioning | 1 |
| DAPTO | BUS 5B1 | 15 Sep 2026 07:00 | 18 Sep 2026 17:00 | COMPLETE | HV equipt commissioning | 0 |
| MARULAN, DAPTO | LINE 8 | 15 Sep 2026 07:00 | 18 Sep 2026 17:00 | COMPLETE | HV equipt commissioning | 0 |
| STOCKDIL | LINE 1 | 20 Oct 2026 07:00 | 27 Oct 2026 15:00 | COMPLETE | HV equipt commissioning | 0 |
| MURRAY, DDTS | LINE DDTS_MSS1_330 | 10 Sep 2026 07:00 | 10 Sep 2026 17:00 | SUBMIT | HV equipt maintenance | 0 |
| SYD_STH | BUS 5A1 | 19 Sep 2026 06:00 | 19 Sep 2026 18:00 | COMPLETE | HV equipt maintenance | 0 |
| MURRAY, DDTS | LINE DDTS_MSS2_330 | 10 Sep 2026 07:00 | 10 Sep 2026 18:00 | COMPLETE | HV equipt maintenance | 0 |