NEM Dashboard

ITK
Period

Bayswater to Liddell (33 or 34) O/L on loss of other Bayswater to

NSW · Thermal · N>>NIL_33_34
Most frequent constraint: Out= Nil, avoid Bayswater to Liddell (33 or 34) O/L on loss of other Bayswater to Liddell (34 or 33), Feedback
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
11
% of period
0.5%
Network as built share
55%
Equipment outage share
45%
Single-plant limit share
0.0%
Units in constraints
27
MW in constraints
7,499
Curtailed while constrained
0.0 GWh
Value of that curtailment
$0.0m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
N>>NIL_33_346Network as builtThermalOut= Nil, avoid Bayswater to Liddell (33 or 34) O/L on loss of other Bayswater to Liddell (34 or 33), Feedback
N>>33_34_QMAX_N3Equipment outageThermalOut = Bayswater to Liddell(33 or 34), avoid O/L Bayswater to Liddell(33 or 34) on trip of QLD largest generation, Feedback
N>>34+5A5_33_322Equipment outageThermalOut= Mt. Piper-Wollar (5A5) and Bayswater to Liddell (33 or 34) line, avoid O/L Bayswater to Liddell (33 or 34) 330kV line on trip of Bayswater to Sydney West (32) 330kV line, Feedback

Units behind it

UnitFuelMWWeightDirection
Waratah Super BatteryBattery8500.26charge
Mt PiperCoal7300.29discharge
EraringCoal7200.23charge
EraringCoal7200.34charge
EraringCoal7200.34charge
EraringCoal7200.23charge
BayswaterCoal6850.70discharge
BayswaterCoal6850.82discharge
BayswaterCoal6850.70discharge
Mt PiperCoal6600.29discharge
Vales Point BCoal6600.29charge
Vales Point BCoal6600.29charge
BayswaterCoal6600.82discharge
Liddell BESSBattery5001.00charge
Eraring Big BatteryBattery4600.34charge
Wellington North Solar Farm (Lightsource)Solar4370.43discharge
Orana BESSBattery4150.43discharge
Uungula Wind FarmWind4140.45discharge
Rye Park Wind FarmWind3960.15discharge
Hunter Power StationOCGT3750.39charge
Hunter Power StationOCGT3750.39charge
Culcairn Solar FarmSolar3500.15discharge
Wollar Solar FarmSolar2800.59discharge
Darlington Point Solar FarmSolar2750.15discharge
Sapphire Wind FarmWind2700.98charge
Avonlie Solar FarmSolar2540.15discharge
Eraring Battery Energy Storage System 2Battery2400.31charge
CollectorWind2270.15discharge
Wellington Solar FarmSolar2160.40discharge
Stubbo Solar FarmSolar2020.52discharge
New England Solar FarmSolar2000.99charge
New England Solar FarmSolar2000.99charge
Glenellen Solar FarmSolar2000.15discharge
Stubbo Solar FarmSolar1980.52discharge
ColongraOCGT1810.26charge
ColongraOCGT1810.26charge
ColongraOCGT1810.26charge
ColongraOCGT1810.26charge
White Rock Wind Farm - Stage 1Wind1750.97charge
UranquintyOCGT1730.15discharge
UranquintyOCGT1730.15discharge
UranquintyOCGT1730.15discharge
UranquintyOCGT1730.15discharge
Gullen Range Wind FarmWind1660.16discharge
Finley Solar FarmSolar1620.15discharge
Bango 973 Wind FarmWind1590.17discharge
Walla Walla Solar FarmSolar1520.15discharge
Walla Walla Solar FarmSolar1520.15discharge
Coleambally Solar FarmSolar1500.15discharge
Suntop Solar FarmSolar1500.39discharge
Flyers Creek Wind FarmWind1460.32discharge
Crudine Ridge Wind FarmWind1420.31discharge
Metz Solar FarmSolar1350.97charge
Bomen Solar FarmSolar1210.15discharge
Bodangora Wind FarmWind1130.39discharge
Gullen Range Wind Farm 2Wind1110.16discharge
Hillston Sun FarmSolar1100.15discharge
Gunnedah Solar FarmSolar1101.00charge
Taralga Wind FarmWind1070.15discharge
West Wyalong Solar FarmSolar1050.15discharge
Nevertire Solar FarmSolar1050.40discharge
Nyngan Solar PlantSolar1020.40discharge
New England BESSBattery1000.99charge
New England BESSBattery1000.99charge
Beryl Solar FarmSolar980.36discharge
Quorn Park Solar HybridSolar970.31discharge
Crookwell 2 Wind FarmWind960.16discharge
Sebastopol Solar FarmSolar900.15discharge
Bango 999 Wind FarmWind850.17discharge
BloweringWater800.16discharge
Goonumbla Solar FarmSolar700.31discharge
Riverina Energy Storage System 2Battery650.15discharge
Wyalong Solar FarmSolar620.15discharge
Riverina Energy Storage System 1Battery600.15discharge
Crookwell 3 Wind FarmWind580.16discharge
Moree Solar FarmSolar560.99charge
Wagga North Solar FarmSolar560.15discharge
Jemalong SolarSolar550.29discharge
Manildra Solar FarmSolar500.33discharge
Parkes Solar FarmSolar500.31discharge
Gunning Wind FarmWind460.16discharge
Molong Solar FarmSolar360.34discharge
Corowa Solar FarmSolar360.15discharge
Junee Solar FarmSolar360.15discharge
Mulwala Solar FarmSolar310.15discharge
Hume Dam NSWWater290.15discharge
Darlington Point Energy Storage SystemBattery250.15discharge
Hunter EconomicZoneOther210.42charge
White Rock Solar FarmSolar200.97charge
Quorn Park Solar HybridBattery190.31discharge
Gullen Range Solar FarmSolar100.16discharge

Associated outages

SubstationEquipmentStartEndStatusReasonBinding hours (whole outage)
WOLLAR, MT_PIPERLINE 5A525 Oct 2026 16:0010 Nov 2026 17:00PTPHV equipt commissioning3
BAYSWATR, LIDDELLLINE 343 Nov 2026 10:458 Nov 2026 16:00COMPLETEHV equipt commissioning2
BAYSWATR, LIDDELLLINE 3415 Sep 2026 07:0016 Sep 2026 17:00COMPLETEHV equipt maintenance1
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.