Most frequent constraint: Out = Mt Piper to Wellington line (72), avoid O/L Molong to Orange North (94T) on trip of Wollar West to Wollar (75) line, Feedback
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
8
% of period
0.4%
Network as built share
0.0%
Equipment outage share
100%
Single-plant limit share
0.0%
Units in constraints
19
MW in constraints
3,212
Curtailed while constrained
1.0 GWh
Value of that curtailment
$0.1m
Network as built: the limit binds with every line and transformer in service. AEMO marks these “Out = Nil”.
Equipment outage: the limit applies only while a named line or transformer is out of service.
Limit on a single plant: AEMO caps one wind or solar farm. Most are system strength limits, which depend on how many coal, gas or hydro units and synchronous condensers are running nearby.
Constraint-hours by cause, per month
Network as builtEquipment outageLimit on a single plant
Constraints that bound in the period
Constraint
Hours
Cause
Limit type
AEMO description
N>72_94T_75
5
Equipment outage
Thermal
Out = Mt Piper to Wellington line (72), avoid O/L Molong to Orange North (94T) on trip of Wollar West to Wollar (75) line, Feedback
N>945+94M_947_72
1
Equipment outage
Thermal
Out= Beryl to Crudine Ridge 132kV line (94M) and Molong to Wellington 132kV line (945) , avoid O/L Wellington to Orange North (947) 132kV line on trip of Mt Piper to Wellington (72) 330kV line, Feedback
CA_BRIS_59CD80D1_1
1
Equipment outage
Thermal
Constraint Automation, O/L 947:L947:I:132@WELLNGTN@NSW for CTG LNQR on trip of WELLNGTN-MT_PIPER 72 330KV LN. Generated by STNET[NORCR1] Host BNEREGEEMP5(EMPBRI)
N>>945_947_72
1
Equipment outage
Thermal
Out= Wellington to Molong 132kV line (945), avoid O/L Wellington to Orange North (947) 132kV line on trip of Wellington to Mt Piper (72) 330kV line, Feedback
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.