NEM Dashboard

ITK
Period

Junee3 132/ transformer

NSW · Thermal · N>N-NIL_JUTX_LV
Most frequent constraint: Out= Nil, avoid O/L Junee#3 132/66kV transformer on trip of Nil, Feedback. 90% of Rating is used as operating margin.
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
22
% of period
1.0%
Network as built share
100%
Equipment outage share
0.0%
Single-plant limit share
0.0%
Units in constraints
1
MW in constraints
36
Curtailed while constrained
0.0 GWh
Value of that curtailment
$0.0m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
N>N-NIL_JUTX_LV22Network as builtThermalOut= Nil, avoid O/L Junee#3 132/66kV transformer on trip of Nil, Feedback. 90% of Rating is used as operating margin.

Units behind it

UnitFuelMWWeightDirection
Junee Solar FarmSolar361.00discharge

Associated outages

No associated outage overlapped this period.
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.