NEM Dashboard

ITK
Period

West Wyalong–Temora 132 kV

NSW · Thermal · N>NIL_901
Most frequent constraint: Out= Nil, avoid O/L West Wyalong to Temora 132kV (901) line on trip of Nil, Feedback
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
45
% of period
2.1%
Network as built share
97%
Equipment outage share
2.4%
Single-plant limit share
0.2%
Units in constraints
2
MW in constraints
168
Curtailed while constrained
0.1 GWh
Value of that curtailment
$0.0m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
N>NIL_90144Network as builtThermalOut= Nil, avoid O/L West Wyalong to Temora 132kV (901) line on trip of Nil, Feedback
N_WSTWYSF1_0INV1Equipment outageOtherWest Wyalong Solar Farm inverter limit of zero. Constraint to violate if West Wyalong Solar Farm inverter availability greater than zero. Swamp out otherwise. DS only
N_WYASF1_0INV0Equipment outageOtherWyalong Solar Farm inverter limit of zero. Constraint to violate if Wyalong Solar Farm inverter availability greater than zero. Swamp out otherwise. DS only
N_WSTWYSF_ZERO0Limit on a single plantUnit ZeroWest Wyalong SF upper limit of 0 MW
N_WYASF1_ZERO0Limit on a single plantUnit ZeroWyalong Solar Farm upper limit of 0 MW

Units behind it

UnitFuelMWWeightDirection
West Wyalong Solar FarmSolar1051.00discharge
Wyalong Solar FarmSolar621.00discharge

Associated outages

SubstationEquipmentStartEndStatusReasonBinding hours (whole outage)
WAGGA330, TUMUT3LINE 0515 Sep 2026 05:009 Sep 2026 18:00COMPLETEHV equipt commissioning1
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.