NEM Dashboard

ITK
Period

Metz Tee to Armidale (966/1)

NSW · Thermal · N>NIL_966/1
Most frequent constraint: Out= Nil, avoid O/L Metz Tee to Armidale (966/1) 132 kV line on trip of Nil, Feedback
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
114
% of period
5.3%
Network as built share
100%
Equipment outage share
0.0%
Single-plant limit share
0.1%
Units in constraints
1
MW in constraints
135
Curtailed while constrained
0.8 GWh
Value of that curtailment
$0.0m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
N>NIL_966/1111Network as builtThermalOut= Nil, avoid O/L Metz Tee to Armidale (966/1) 132 kV line on trip of Nil, Feedback
N>>NIL_966/1_87_S6Network as builtThermalOut=Nil, avoid O/L Metz Tee to Armidale (966/1) kV line on trip of Coffs Harbour to Armidale (87) 330kV line, Feedback
N>966+KK_966/1_NIL3Network as builtThermalOut= 966 (Armidale to Koolkhan) 132kV line [NOTE: Open at Koolkan end ONLY, Armidale end remains closed] O/S , avoid O/L Metz Tee to Armidale (966/1) kV line on trip of Nil, Feedback
N_METZSF_20INV0Limit on a single plantSystem StrengthMetz Solar Farm inverter limit of 20. Constraint to violate if Metz Solar Farm inverter availability greater than 20. Swamp out otherwise. DS only

Units behind it

UnitFuelMWWeightDirection
Metz Solar FarmSolar1351.00charge
Metz Solar FarmSolar1351.00discharge

Associated outages

SubstationEquipmentStartEndStatusReasonBinding hours (whole outage)
KOOLKHANBUS 39 Sep 2026 08:009 Sep 2026 17:30COMPLETEHV equipt maintenance3
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.