Most frequent constraint: Out= Nil, avoid O/L Metz Tee to Armidale (966/1) 132 kV line on trip of Nil, Feedback
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
114
% of period
5.3%
Network as built share
100%
Equipment outage share
0.0%
Single-plant limit share
0.1%
Units in constraints
1
MW in constraints
135
Curtailed while constrained
0.8 GWh
Value of that curtailment
$0.0m
Network as built: the limit binds with every line and transformer in service. AEMO marks these “Out = Nil”.
Equipment outage: the limit applies only while a named line or transformer is out of service.
Limit on a single plant: AEMO caps one wind or solar farm. Most are system strength limits, which depend on how many coal, gas or hydro units and synchronous condensers are running nearby.
Constraint-hours by cause, per month
Network as builtEquipment outageLimit on a single plant
Constraints that bound in the period
Constraint
Hours
Cause
Limit type
AEMO description
N>NIL_966/1
111
Network as built
Thermal
Out= Nil, avoid O/L Metz Tee to Armidale (966/1) 132 kV line on trip of Nil, Feedback
N>>NIL_966/1_87_S
6
Network as built
Thermal
Out=Nil, avoid O/L Metz Tee to Armidale (966/1) kV line on trip of Coffs Harbour to Armidale (87) 330kV line, Feedback
N>966+KK_966/1_NIL
3
Network as built
Thermal
Out= 966 (Armidale to Koolkhan) 132kV line [NOTE: Open at Koolkan end ONLY, Armidale end remains closed] O/S , avoid O/L Metz Tee to Armidale (966/1) kV line on trip of Nil, Feedback
N_METZSF_20INV
0
Limit on a single plant
System Strength
Metz Solar Farm inverter limit of 20. Constraint to violate if Metz Solar Farm inverter availability greater than 20. Swamp out otherwise. DS only
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.