Most frequent constraint: Out= Nil, avoid O/L Gunnedah to Tamworth (969) on trip of Nil, Feedback. Metering is used as specified in OM520 [Note: swamped with 96M or 9UJ or 9UH or 9U3/2 is O/S]
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
490
% of period
23%
Network as built share
100%
Equipment outage share
0.0%
Single-plant limit share
0.1%
Units in constraints
2
MW in constraints
166
Curtailed while constrained
16.4 GWh
Value of that curtailment
$0.9m
Network as built: the limit binds with every line and transformer in service. AEMO marks these “Out = Nil”.
Equipment outage: the limit applies only while a named line or transformer is out of service.
Limit on a single plant: AEMO caps one wind or solar farm. Most are system strength limits, which depend on how many coal, gas or hydro units and synchronous condensers are running nearby.
Constraint-hours by cause, per month
Network as builtEquipment outageLimit on a single plant
Constraints that bound in the period
Constraint
Hours
Cause
Limit type
AEMO description
N>NIL_969
412
Network as built
Thermal
Out= Nil, avoid O/L Gunnedah to Tamworth (969) on trip of Nil, Feedback. Metering is used as specified in OM520 [Note: swamped with 96M or 9UJ or 9UH or 9U3/2 is O/S]
N>NIL_MORTX_LV
161
Network as built
Thermal
NIL, avoid O/L Moree (1 or 2) 66/132kV TX on trip of Moree (2 or 1) 66/132kV TX, Feedback
N>96M_969_NIL
30
Network as built
Thermal
Out= Moree to Narrabri (96M) 132kV line
N>X-968+96M_969_NIL
8
Network as built
Thermal
Out= 968 (Tamworth to Narrabri) 132 kV Line and 96M(Narrabri to Moree), avoid O/L on 969 (Gunnedah to Tamworth) 132 kV on Nil trip, Feedback
N>9UH_969_NIL
8
Network as built
Thermal
Out= Any one 132kV feeder between Narrabri to Gunnedah Solar Farm (9UH, 9UJ, 9U3/2), avoid O/L Gunnedah to Tamworth (969) 132kV line on trip of Nil, Feedback
N>9U2_969_NIL
4
Network as built
Thermal
Out= 9U2 (Moree to Inverell ) 132kV line, avoid O/L on 969 (Gunnedah to Tamworth) 132 kV on Nil trip, Feedback
N_MOREESF1_38INV
0
Limit on a single plant
System Strength
Moree Solar Farm inverter limit of 38. Constraint to violate if Moree Solar Farm inverter availability greater than 38. Swamp out otherwise. DS only
N_MOREESF1_43INV
0
Limit on a single plant
System Strength
Moree Solar Farm inverter limit of 43. Constraint to violate if Moree Solar Farm inverter availability greater than 43. Swamp out otherwise. DS only
N_GNNDHSF1_0INV
0
Equipment outage
Other
Gunnedah Solar Farm inverter limit of zero. Constraint to violate if Gunnedah Solar Farm inverter availability greater than zero. Swamp out otherwise. DS only
Source: AEMO. Summary built 25 Nov 2026 02:26; data through 25 Nov 2026 01:25 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.