NEM Dashboard

ITK
Period

North-west NSW: Gunnedah–Tamworth 132 kV

NSW · Thermal · N>NIL_969
Most frequent constraint: Out= Nil, avoid O/L Gunnedah to Tamworth (969) on trip of Nil, Feedback. Metering is used as specified in OM520 [Note: swamped with 96M or 9UJ or 9UH or 9U3/2 is O/S]
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
490
% of period
23%
Network as built share
100%
Equipment outage share
0.0%
Single-plant limit share
0.1%
Units in constraints
2
MW in constraints
166
Curtailed while constrained
16.4 GWh
Value of that curtailment
$0.9m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
N>NIL_969412Network as builtThermalOut= Nil, avoid O/L Gunnedah to Tamworth (969) on trip of Nil, Feedback. Metering is used as specified in OM520 [Note: swamped with 96M or 9UJ or 9UH or 9U3/2 is O/S]
N>NIL_MORTX_LV161Network as builtThermalNIL, avoid O/L Moree (1 or 2) 66/132kV TX on trip of Moree (2 or 1) 66/132kV TX, Feedback
N>96M_969_NIL30Network as builtThermalOut= Moree to Narrabri (96M) 132kV line
N>X-968+96M_969_NIL8Network as builtThermalOut= 968 (Tamworth to Narrabri) 132 kV Line and 96M(Narrabri to Moree), avoid O/L on 969 (Gunnedah to Tamworth) 132 kV on Nil trip, Feedback
N>9UH_969_NIL8Network as builtThermalOut= Any one 132kV feeder between Narrabri to Gunnedah Solar Farm (9UH, 9UJ, 9U3/2), avoid O/L Gunnedah to Tamworth (969) 132kV line on trip of Nil, Feedback
N>9U2_969_NIL4Network as builtThermalOut= 9U2 (Moree to Inverell ) 132kV line, avoid O/L on 969 (Gunnedah to Tamworth) 132 kV on Nil trip, Feedback
N_MOREESF1_38INV0Limit on a single plantSystem StrengthMoree Solar Farm inverter limit of 38. Constraint to violate if Moree Solar Farm inverter availability greater than 38. Swamp out otherwise. DS only
N_MOREESF1_43INV0Limit on a single plantSystem StrengthMoree Solar Farm inverter limit of 43. Constraint to violate if Moree Solar Farm inverter availability greater than 43. Swamp out otherwise. DS only
N_GNNDHSF1_0INV0Equipment outageOtherGunnedah Solar Farm inverter limit of zero. Constraint to violate if Gunnedah Solar Farm inverter availability greater than zero. Swamp out otherwise. DS only

Units behind it

UnitFuelMWWeightDirection
Gunnedah Solar FarmSolar1101.00discharge
Moree Solar FarmSolar561.00discharge

Associated outages

SubstationEquipmentStartEndStatusReasonBinding hours (whole outage)
NARRABRIBUS BS223 Sep 2026 07:0023 Sep 2026 17:00COMPLETEHV equipt maintenance8
TAMWORTH, ARMIDALELINE 8612 Oct 2026 06:3012 Oct 2026 16:00COMPLETEHV equipt maintenance6
BOGBRI_NLINE 9UH25 Aug 2026 07:0027 Aug 2026 16:30COMPLETEHV equipt maintenance5
MOREELINE 96M16 Sep 2026 07:3016 Sep 2026 17:00COMPLETEHV equipt maintenance5
ARMIDALE, TAMWORTHLINE 8614 Oct 2026 06:3014 Oct 2026 17:00COMPLETEHV equipt maintenance5
TAMWORTH, ARMIDALELINE 8615 Oct 2026 06:3015 Oct 2026 16:00COMPLETEHV equipt maintenance5
NARRABRIBUS BS424 Sep 2026 07:0024 Sep 2026 17:00COMPLETEHV equipt maintenance4
INVERELLBUS 321 Oct 2026 06:0021 Oct 2026 16:00COMPLETEHV equipt commissioning4
MOREELINE 96M9 Sep 2026 08:009 Sep 2026 16:00COMPLETEHV equipt maintenance4
ARMIDALE, TAMWORTHLINE 8616 Oct 2026 06:3016 Oct 2026 16:00COMPLETEHV equipt maintenance3
GUNNEDAHBUS L9U314 Sep 2026 09:0014 Sep 2026 17:00COMPLETEHV equipt maintenance0
Source: AEMO. Summary built 25 Nov 2026 02:26; data through 25 Nov 2026 01:25 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.