Mulwala to Corowa (996/2)

NSW · Thermal · N>NIL_997/2_99A
Most frequent constraint: Out= NIL, avoid O/L Mulwala to Corowa (996/2) 132kV line on trip of Finley to Uranquinty (99A) 132kV line, Feedback
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
36
% of period
1.7%
Network as built share
100%
Equipment outage share
0.0%
Single-plant limit share
0.0%
Units in constraints
2
MW in constraints
194
Curtailed while constrained
0.0 GWh
Value of that curtailment
$0.0m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
N>NIL_997/2_99A32Network as builtThermalOut= NIL, avoid O/L Mulwala to Corowa (996/2) 132kV line on trip of Finley to Uranquinty (99A) 132kV line, Feedback
N>NIL_997/2_3G4Network as builtThermalOut= Nil, avoid O/L Mulwala to Corowa (997/2) 132kV line on trip of Wagga to Culcairn (3G) 330kV line, Feedback
N>NIL_9R4_621Network as builtThermalOut= NIL, avoid O/L Finley to Mulwala (9R4) 132kV line on trip of Walla Walla to Jindera (62) 330kV line, Feedback

Units behind it

UnitFuelMWWeightDirection
Glenellen Solar FarmSolar2000.17charge
Finley Solar FarmSolar1621.00discharge
Coleambally Solar FarmSolar1500.17discharge
Corowa Solar FarmSolar360.70charge
Mulwala Solar FarmSolar311.00charge
Mulwala Solar FarmSolar311.00discharge
Hume Dam NSWWater290.23charge

Associated outages

No associated outage overlapped this period.
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.