Cowra to Bango (999)

NSW · Thermal · N>NIL_999_9GL
Most frequent constraint: Out= Nil, avoid O/L Cowra to Bango (999) 132kV line on trip of Bango to Yass (9GL) 132kV line, Feedback
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
128
% of period
5.9%
Network as built share
100%
Equipment outage share
0.0%
Single-plant limit share
0.0%
Units in constraints
9
MW in constraints
660
Curtailed while constrained
6.1 GWh
Value of that curtailment
$0.2m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
N>NIL_999_9GL128Network as builtThermalOut= Nil, avoid O/L Cowra to Bango (999) 132kV line on trip of Bango to Yass (9GL) 132kV line, Feedback
N>NIL_9GM4Network as builtThermalOut= Nil, avoid O/L Bango999 to Yass (9GM) on trip of Nil, Feedback

Units behind it

UnitFuelMWWeightDirection
Wellington Solar FarmSolar2160.07charge
Bango 973 Wind FarmWind1591.00discharge
Bango 973 Wind FarmWind1591.00charge
Suntop Solar FarmSolar1500.20charge
Flyers Creek Wind FarmWind1460.08charge
Nevertire Solar FarmSolar1050.07charge
Nyngan Solar PlantSolar1020.07charge
Quorn Park Solar HybridSolar970.38discharge
Bango 999 Wind FarmWind851.00discharge
Bango 999 Wind FarmWind850.28charge
BloweringWater800.28discharge
Goonumbla Solar FarmSolar700.38discharge
Goonumbla Solar FarmSolar700.71charge
Jemalong SolarSolar551.00charge
Jemalong SolarSolar550.54discharge
Manildra Solar FarmSolar500.19discharge
Manildra Solar FarmSolar500.35charge
Parkes Solar FarmSolar500.71charge
Parkes Solar FarmSolar500.38discharge
Gunning Wind FarmWind460.28discharge
Molong Solar FarmSolar360.23charge
Quorn Park Solar HybridBattery190.38discharge

Associated outages

No associated outage overlapped this period.
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.