Crudine Ridge to Ilford Tee (9ML)

NSW · Thermal · N>NIL_9ML
Most frequent constraint: Out= Nil, avoid O/L Crudine Ridge to Ilford Tee (9ML) on trip of Nil, Feedback. Metering is used as specified in OM520
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
12
% of period
0.5%
Network as built share
100%
Equipment outage share
0.0%
Single-plant limit share
0.0%
Units in constraints
3
MW in constraints
353
Curtailed while constrained
0.1 GWh
Value of that curtailment
$0.0m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
N>NIL_9ML9Network as builtThermalOut= Nil, avoid O/L Crudine Ridge to Ilford Tee (9ML) on trip of Nil, Feedback. Metering is used as specified in OM520
N>94M_94B1_NIL2Network as builtThermalOut= Beryl to Crudine Ridge 132kV line (94M), avoid O/L Bodangora WF to Wellington (94B1) on trip of Nil,
N>NIL_94B2Network as builtThermalOut= Nil, avoid O/L Beryl to Wellington 132 kV (94B/1) on nil trip, Feedback. Metering at Wellington is used

Units behind it

UnitFuelMWWeightDirection
Crudine Ridge Wind FarmWind1421.00discharge
Bodangora Wind FarmWind1131.00discharge
Beryl Solar FarmSolar981.00discharge

Associated outages

SubstationEquipmentStartEndStatusReasonBinding hours (whole outage)
CRUDNEWFLINE 94M/2, LINE 94M24 Oct 2026 06:004 Nov 2026 16:00COMPLETEHV equipt commissioning1
CRUDNEWFLINE 94M/2, LINE 94M22 Sep 2026 07:003 Oct 2026 17:00COMPLETEHV equipt commissioning1
WELLNGTNBUS 4A228 Oct 2026 05:0028 Oct 2026 13:00COMPLETEHV equipt maintenance0
CRUDNEWFLINE 94M, LINE 94M/26 Nov 2026 06:0011 Nov 2026 16:00PTPHV equipt commissioning0
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.