NEM Dashboard

ITK
Period

Wagga North–Wagga 132 kV

NSW · Thermal · N>NIL_9R6_991
Most frequent constraint: Out= Nil, avoid O/L Wagga North to Wagga (9R6) 132kV line on trip of Wagga North to Murrumburrah (991) 132kV line, Feedback
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
385
% of period
18%
Network as built share
100%
Equipment outage share
0.5%
Single-plant limit share
0.0%
Units in constraints
12
MW in constraints
1,579
Curtailed while constrained
2.5 GWh
Value of that curtailment
$0.1m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
N>NIL_9R6_9R5224Network as builtThermalOut= Nil, avoid O/L Wagga North to Wagga132 (9R6) on trip of Wagga North to Wagga330 (9R5) line, Feedback
N>NIL_9R6_991217Network as builtThermalOut= Nil, avoid O/L Wagga North to Wagga (9R6) 132kV line on trip of Wagga North to Murrumburrah (991) 132kV line, Feedback
N>9R5_9R6_9912Equipment outageThermalOut= 9R5, avoid O/L Wagga North to Wagga (9R6) 132kV line on trip of Wagga North to Murrumburrah (991) 132kV line, Feedback
N>NIL_99U1Network as builtThermalOut= Nil avoid O/L Sebastopol to Wagga North (99U) 132kV line on trip of Nil, Feedback

Units behind it

UnitFuelMWWeightDirection
Avonlie Solar FarmSolar2541.00discharge
UranquintyOCGT1731.00discharge
UranquintyOCGT1731.00discharge
UranquintyOCGT1731.00discharge
UranquintyOCGT1731.00discharge
Finley Solar FarmSolar1621.00discharge
Bomen Solar FarmSolar1211.00charge
Bomen Solar FarmSolar1211.00discharge
West Wyalong Solar FarmSolar1051.00discharge
West Wyalong Solar FarmSolar1051.00charge
Sebastopol Solar FarmSolar901.00charge
Sebastopol Solar FarmSolar901.00discharge
Wyalong Solar FarmSolar621.00discharge
Wyalong Solar FarmSolar621.00charge
Wagga North Solar FarmSolar561.00discharge
Wagga North Solar FarmSolar561.00charge
Junee Solar FarmSolar361.00charge
Junee Solar FarmSolar361.00discharge

Associated outages

SubstationEquipmentStartEndStatusReasonBinding hours (whole outage)
WAGGA330BUS 4A17 Oct 2026 07:007 Oct 2026 16:00COMPLETEHV equipt maintenance2
Source: AEMO. Summary built 25 Nov 2026 02:26; data through 25 Nov 2026 01:25 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.