NEM Dashboard

ITK
Period

Parkes / Transformer on NIL trip

NSW · Thermal · N>NIL_PKTX_LV
Most frequent constraint: Out= Nil, avoid O/L either Parkes 132kV/66kV Transformer on NIL trip, Feedback.
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
83
% of period
3.8%
Network as built share
97%
Equipment outage share
0.0%
Single-plant limit share
2.9%
Units in constraints
2
MW in constraints
119
Curtailed while constrained
0.1 GWh
Value of that curtailment
$0.0m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
N>NIL_PKTX_LV80Network as builtThermalOut= Nil, avoid O/L either Parkes 132kV/66kV Transformer on NIL trip, Feedback.
N_PARSF1_4INV2Limit on a single plantSystem StrengthParkes Solar Farm inverter limit of 4. Constraint to violate if Parkes Solar Farm inverter availability greater than 4. Swamp out otherwise. DS only
N_GOONSF1_19INV0Limit on a single plantSystem StrengthGoonumbla Solar Farm inverter limit of 19. Constraint to violate if Goonumbla Solar Farm inverter availability greater than 19. Swamp out otherwise. DS only

Units behind it

UnitFuelMWWeightDirection
Goonumbla Solar FarmSolar701.00discharge
Parkes Solar FarmSolar501.00discharge

Associated outages

SubstationEquipmentStartEndStatusReasonBinding hours (whole outage)
UUNG_SSLINE 79_NEW4 Oct 2026 07:0011 Oct 2026 16:00COMPLETEHV equipt commissioning2
STUBO_SFLINE 7M13 Oct 2026 05:0013 Oct 2026 17:00COMPLETEHV equipt commissioning0
WELLNGTN, MT_PIPERLINE 7221 Sep 2026 07:0021 Sep 2026 17:00COMPLETEHV equipt commissioning0
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.