NEM Dashboard

ITK
Period

Out = Armidale to Tamworth (85 or 86 or 8U), avoid Voltage Collapse on

QLD · Voltage Stability · N^^Q_ARTW_B1
Most frequent constraint: Out = Armidale to Tamworth (85 or 86 or 8U), avoid Voltage Collapse on loss of Kogan Creek generators
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
1
% of period
0.0%
Network as built share
0.0%
Equipment outage share
100%
Single-plant limit share
0.0%
Units in constraints
1
MW in constraints
744
Curtailed while constrained
0.0 GWh
Value of that curtailment
$0.0m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
N^^Q_ARTW_B11Equipment outageVoltage StabilityOut = Armidale to Tamworth (85 or 86 or 8U), avoid Voltage Collapse on loss of Kogan Creek generators

Units behind it

UnitFuelMWWeightDirection
Kogan CreekCoal7441.00discharge

Associated outages

SubstationEquipmentStartEndStatusReasonBinding hours (whole outage)
ARMIDALE, TAMWORTHLINE 865 Nov 2026 06:305 Nov 2026 15:00COMPLETEHV equipt maintenance0
ARMIDALE, TAMWORTHLINE 867 Nov 2026 06:307 Nov 2026 15:00COMPLETEHV equipt maintenance0
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.