NEM Dashboard

ITK
Period

Out = Dederang to Murray 330 kV line, avoid voltage collapse at

VIC · Voltage Stability · N^^V_MSDD2
Most frequent constraint: Out = Dederang to Murray 330 kV line, avoid voltage collapse at Darlington Point for loss of the remaining Dederang to Murray 330 kV line
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
4
% of period
0.2%
Network as built share
0.0%
Equipment outage share
100%
Single-plant limit share
0.0%
Units in constraints
1
MW in constraints
1,550
Curtailed while constrained
0.0 GWh
Value of that curtailment
$0.0m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
N^^V_LTWG_14Equipment outageVoltage StabilityOut = Lower Tumut to Wagga 330 kV line, avoid voltage collapse at Darlington Point for loss of the largest Vic generating unit or Basslink
N^^V_MSDD20Equipment outageVoltage StabilityOut = Dederang to Murray 330 kV line, avoid voltage collapse at Darlington Point for loss of the remaining Dederang to Murray 330 kV line

Units behind it

UnitFuelMWWeightDirection
Murray 1Water1,5500.53discharge
Limondale Solar Farm 1Solar2300.73charge
Sunraysia Solar FarmSolar2290.73charge
Silverton Wind FarmWind1990.84charge
UranquintyOCGT1731.00charge
UranquintyOCGT1731.00charge
UranquintyOCGT1731.00charge
UranquintyOCGT1731.00charge
Broken Hill Solar PlantSolar530.84charge
Broken HillBattery500.84charge
Hume Dam VICWater291.00charge
Limondale Solar Farm 2Solar290.73charge

Associated outages

SubstationEquipmentStartEndStatusReasonBinding hours (whole outage)
TUMUT3, WAGGA330LINE 0515 Sep 2026 05:009 Sep 2026 18:00COMPLETEHV equipt commissioning4
MURRAY, DDTSLINE DDTS_MSS1_33011 Sep 2026 07:0011 Sep 2026 17:00SUBMITHV equipt maintenance0
DDTS, MURRAYLINE DDTS_MSS2_33011 Sep 2026 07:0011 Sep 2026 18:00COMPLETEHV equipt maintenance0
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.