Southern NSW: voltage stability for loss of the largest Victorian unit or Basslink

NSW · Voltage Stability · N^^V_NIL_1
Most frequent constraint: Out = Nil, avoid voltage collapse at Southern NSW for loss of the largest Vic generating unit or Basslink
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
138
% of period
6.4%
Network as built share
34%
Equipment outage share
66%
Single-plant limit share
0.0%
Units in constraints
49
MW in constraints
11,063
Curtailed while constrained
0.3 GWh
Value of that curtailment
$0.0m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
N^^V_CNCW_149Equipment outageVoltage StabilityOut = Canberra-Capital (6) or Kangaroo Valley to Capital (3W) or Dapto-Kangaroo Valley (18), avoid voltage collapse at Darlington Point for loss of the largest Vic generating unit or Basslink
N^^V_NIL_141Network as builtVoltage StabilityOut = Nil, avoid voltage collapse at Southern NSW for loss of the largest Vic generating unit or Basslink
N^^V_MLNK_119Equipment outageVoltage StabilityOut = Murraylink, avoid voltage collapse at Southern NSW for loss of the largest Vic generating unit or Basslink
N^^V_BADP_110Equipment outageVoltage StabilityOut = Balranald to Darlington Point (X5) 220kV line, avoid voltage collapse at Darlington Point for loss of the largest Vic generating unit or Basslink
N^^V_MLNK_ARWBBA7Equipment outageVoltage StabilityOut = Murraylink, avoid voltage collapse in southern NSW for loss of Ballarat to Waubra to Ararat 220kV lines (this also trips Waubra, Ararat and Crowlands, Bulgana and Murra Warra WFs)
N^^V_NIL_ARWBBA5Network as builtVoltage StabilityOut = Nil, avoid voltage collapse in southern NSW for loss of Ballarat to Waubra to Ararat 220kV lines (this also trips Waubra, Ararat and Crowlands, Bulgana and Murra Warra WFs)
N^^V_JNWG_63_X5_14Equipment outageVoltage StabilityOut = Jindera to Wagga(62) 330kV line, 63 + X5 open, avoid voltage collapse at Southern NSW for loss of the largest Vic generating unit or Basslink
N^^V_DDSM11Equipment outageVoltage StabilityOut = Dederang to South Morang 330 kV line, avoid voltage collapse at Southern NSW for loss of the largest Vic generating unit or Basslink or the parallel Dederang to South Morang 330kV line
N^^V_6+DDSM_11Equipment outageVoltage StabilityOut = Canberra - Capital (6) 330kV line and Dederang - South Morang 330kV line, avoid voltage collapse at Southern NSW for loss of the largest Vic generating unit or Basslink
N^^V_DPWG_X5_10Equipment outageVoltage StabilityOut = Darlington Point to Wagga(63) and Darlington Point to Balranald (X5) off loaded, avoid voltage collapse at Southern NSW for loss of the largest Vic generating unit or Basslink
N^^V_MSDD10Equipment outageVoltage StabilityOut = Dederang to Murray 330 kV line, avoid voltage collapse at Darlington Point for loss of the largest Vic generating unit or Basslink

Units behind it

UnitFuelMWWeightDirection
Murray 1Water1,5500.97discharge
Tumut 3Water1,5000.55charge
Tumut 3Water1,5001.00discharge
Upper TumutWater6160.84charge
Upper TumutWater6160.97discharge
Stockyard Hill Wind FarmWind5280.68discharge
Macarthur Wind FarmWind4200.68discharge
Bogong / MackayWater3000.34discharge
MortlakeOCGT2920.68discharge
MortlakeOCGT2920.68discharge
Darlington Point Solar FarmSolar2750.53charge
Darlington Point Solar FarmSolar2751.00discharge
Golden Plains Wind Farm EastWind2600.68discharge
Avonlie Solar FarmSolar2541.00discharge
Golden Plains Wind Farm EastWind2480.68discharge
Golden Plains Wind Farm EastWind2480.68discharge
Ararat Wind FarmWind2400.87discharge
Limondale Solar Farm 1Solar2300.86charge
Limondale Solar Farm 1Solar2300.79discharge
Sunraysia Solar FarmSolar2290.79discharge
Sunraysia Solar FarmSolar2290.86charge
Murra Warra Wind Farm - stage 1Wind2260.87discharge
Ryan Corner Wind FarmWind2180.68discharge
Murra Warra Wind Farm - stage 2Wind2090.87discharge
Bulgana Green Power Hub - Wind FarmWind2040.87discharge
Silverton Wind FarmWind1991.00charge
Silverton Wind FarmWind1990.79discharge
UranquintyOCGT1730.69charge
UranquintyOCGT1731.00discharge
UranquintyOCGT1731.00discharge
UranquintyOCGT1730.69charge
UranquintyOCGT1731.00discharge
UranquintyOCGT1731.00discharge
UranquintyOCGT1730.69charge
UranquintyOCGT1730.69charge
Dundonnell Wind FarmWind1680.68discharge
Gullen Range Wind FarmWind1660.17charge
Finley Solar FarmSolar1620.53charge
Finley Solar FarmSolar1621.00discharge
Walla Walla Solar FarmSolar1520.17charge
Walla Walla Solar FarmSolar1520.17charge
Coleambally Solar FarmSolar1501.00discharge
Coleambally Solar FarmSolar1500.53charge
Dundonnell Wind FarmWind1220.68discharge
Bomen Solar FarmSolar1211.00discharge
Boco Rock Wind FarmWind1130.11charge
Hillston Sun FarmSolar1101.00discharge
Taralga Wind FarmWind1070.17charge
West Wyalong Solar FarmSolar1051.00discharge
Capital BatteryBattery1000.17charge
Hawkesdale Wind FarmWind970.68discharge
Crookwell 2 Wind FarmWind960.17charge
Sebastopol Solar FarmSolar901.00discharge
BloweringWater800.97discharge
Crowlands Wind FarmWind800.87discharge
Riverina Energy Storage System 2Battery651.00discharge
Riverina Energy Storage System 2Battery650.53charge
Wyalong Solar FarmSolar621.00discharge
GuthegaWater600.97discharge
Riverina Energy Storage System 1Battery600.53charge
Wagga North Solar FarmSolar561.00discharge
Broken Hill Solar PlantSolar530.79discharge
Broken Hill Solar PlantSolar531.00charge
Broken HillBattery501.00charge
Broken HillBattery500.79discharge
Limondale BESSBattery500.86charge
Woodlawn Wind FarmWind480.17charge
Gunning Wind FarmWind460.17charge
Dundonnell Wind FarmWind460.68discharge
Junee Solar FarmSolar361.00discharge
Corowa Solar FarmSolar360.79discharge
Hume Dam NSWWater290.97discharge
Limondale Solar Farm 2Solar290.79discharge
Limondale Solar Farm 2Solar290.86charge
Darlington Point Energy Storage SystemBattery251.00discharge
Darlington Point Energy Storage SystemBattery250.53charge
ACT BESSBattery100.17charge
Gullen Range Solar FarmSolar100.17charge
Snowy Pumping–00.55discharge
Snowy Pumping–01.00charge

Associated outages

SubstationEquipmentStartEndStatusReasonBinding hours (whole outage)
CAPITAL, CANBERRALINE 630 Sep 2026 07:0019 Oct 2026 16:00COMPLETEHV equipt maintenance22
MLRC, MLNK_BLINE DC_CONVERTER, LINE ML_15 Nov 2026 01:004 Dec 2026 16:00PTPHV equipt maintenance18
CANBERRA, CAPITALLINE 62 Sep 2026 07:004 Sep 2026 17:00COMPLETEHV equipt maintenance12
CAPITAL, CANBERRALINE 628 Oct 2026 06:0016 Nov 2026 16:00COMPLETEHV equipt maintenance9
CAPITAL, KANGAROOLINE 3W25 Aug 2026 07:3030 Aug 2026 18:00COMPLETEHV equipt commissioning7
BURONGA, BALRANLDLINE X5/3, LINE X313 Sep 2026 05:0015 Sep 2026 19:00COMPLETEHV equipt commissioning5
WAGGA330LINE 3G2 Nov 2026 04:302 Nov 2026 17:30COMPLETEHV equipt commissioning4
BURONGALINE 6F2 Nov 2026 04:302 Nov 2026 17:30COMPLETEHV equipt commissioning4
KANGAROO, DAPTOLINE 185 Sep 2026 08:006 Sep 2026 17:00COMPLETEHV equipt maintenance3
TUMUT3, WAGGA330LINE 0515 Sep 2026 05:009 Sep 2026 18:00COMPLETEHV equipt commissioning3
CAPITAL, CANBERRALINE 610 Sep 2026 07:0014 Sep 2026 17:00COMPLETEHV equipt maintenance3
–N/A N/A27 Oct 2026 06:0029 Oct 2026 16:00COMPLETEHV equipt commissioning2
JINDERA, WOTSLINE 060, LINE N/A28 Oct 2026 06:0028 Oct 2026 17:00COMPLETEHV equipt maintenance2
JINDERA, WOTSLINE 06028 Oct 2026 06:0028 Oct 2026 17:00COMPLETEHV equipt maintenance2
BURONGALINE 6F28 Oct 2026 06:0028 Oct 2026 17:00COMPLETEHV equipt commissioning2
MULWALACB 7B128 Oct 2026 06:0028 Oct 2026 17:00COMPLETEHV equipt maintenance2
SMTS, DDTSLINE DDTS_SMTS1_33021 Oct 2026 05:3021 Oct 2026 16:30COMPLETEHV equipt maintenance1
BURONGABUS B15 Sep 2026 13:0015 Sep 2026 19:00COMPLETEHV equipt commissioning1
SMTS, DDTSLINE DDTS_SMTS2_33030 Sep 2026 07:0030 Sep 2026 18:00COMPLETEHV equipt maintenance1
MLNK_B, MLRCLINE DC_CONVERTER, LINE ML_12 Sep 2026 11:004 Sep 2026 13:00COMPLETEHV equipt commissioning1
WAGGA330, DARL_PTLINE 631 Nov 2026 04:301 Nov 2026 17:30COMPLETEHV equipt commissioning0
BURONGALINE 6F1 Nov 2026 04:301 Nov 2026 17:30COMPLETEHV equipt commissioning0
DDTS, MURRAYLINE DDTS_MSS1_33011 Sep 2026 07:0011 Sep 2026 17:00SUBMITHV equipt maintenance0
MURRAY, DDTSLINE DDTS_MSS2_33011 Sep 2026 07:0011 Sep 2026 18:00COMPLETEHV equipt maintenance0
BALRANLD, BURONGALINE X3, LINE X5/311 Oct 2026 17:3015 Oct 2026 01:30COMPLETEHV equipt commissioning0
BURONGABUS B11 Oct 2026 17:3015 Oct 2026 01:30COMPLETEHV equipt commissioning0
BURONGALINE 6F11 Oct 2026 17:3015 Oct 2026 19:30COMPLETEHV equipt commissioning0
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.