NEM Dashboard

ITK
Period

Wandoan South BESS — non-conformance

QLD · Non-Conformance · NC_Q_WANDB1
Most frequent constraint: Non Conformance Constraint for WANDOAN BESS
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
4
% of period
0.2%
Network as built share
0.0%
Equipment outage share
0.0%
Single-plant limit share
100%
Units in constraints
1
MW in constraints
100
Curtailed while constrained
0.0 GWh
Value of that curtailment
$0.0m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
NC_Q_WANDB14Limit on a single plantNon-ConformanceNon Conformance Constraint for WANDOAN BESS

Units behind it

UnitFuelMWWeightDirection
Wandoan South BESSBattery1001.00charge
Wandoan South BESSBattery1001.00discharge

Associated outages

No associated outage overlapped this period.
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.