NEM Dashboard

ITK
Period

Stubbo Solar Farm — system strength

NSW · System Strength · N_STUBSF_77INV
Most frequent constraint: Stubbo Solar Farm 1+2 inverter limit of 77. Constraint to violate if Stubbo Solar Farm has inverter availability greater than 77. Swamp out otherwise. DS only
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
5
% of period
0.2%
Network as built share
0.0%
Equipment outage share
7.8%
Single-plant limit share
92%
Units in constraints
2
MW in constraints
400
Curtailed while constrained
0.3 GWh
Value of that curtailment
$0.0m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
N_STUBSF_77INV2Limit on a single plantSystem StrengthStubbo Solar Farm 1+2 inverter limit of 77. Constraint to violate if Stubbo Solar Farm has inverter availability greater than 77. Swamp out otherwise. DS only
N_STUBSF_29INV1Limit on a single plantSystem StrengthStubbo Solar Farm 1+2 inverter limit of 29. Constraint to violate if Stubbo Solar Farm has inverter availability greater than 29. Swamp out otherwise. DS only
N_STUBSF_76INV1Limit on a single plantSystem StrengthStubbo Solar Farm 1+2 inverter limit of 76. Constraint to violate if Stubbo Solar Farm has inverter availability greater than 76. Swamp out otherwise. DS only
N_STUBSF_0INV0Equipment outageOtherStubbo Solar Farm 1+2 inverter limit of zero. Constraint to violate if Stubbo Solar Farm 1+2 inverter availability greater than zero. Swamp out otherwise. DS only
N_STUBSF_185INV0Limit on a single plantSystem StrengthStubbo Solar Farm 1+2 inverter limit of 185. Constraint to violate if Stubbo Solar Farm 1+2 inverter availability greater than 185. Swamp out otherwise. DS only

Units behind it

UnitFuelMWWeightDirection
Stubbo Solar FarmSolar2021.00discharge
Stubbo Solar FarmSolar1981.00discharge

Associated outages

SubstationEquipmentStartEndStatusReasonBinding hours (whole outage)
MT_PIPER, WELLNGTNLINE 7221 Sep 2026 07:0021 Sep 2026 17:00COMPLETEHV equipt commissioning1
STUBO_SFLINE 7M12 Oct 2026 05:0012 Oct 2026 17:00COMPLETEHV equipt commissioning1
STUBO_SFLINE 7M13 Oct 2026 05:0013 Oct 2026 17:00COMPLETEHV equipt commissioning0
STUBO_SFLINE 7M14 Oct 2026 05:0014 Oct 2026 17:00COMPLETEHV equipt commissioning0
–N/A N/A28 Oct 2026 19:0029 Oct 2026 04:45COMPLETESecondary equipt maintenance0
–N/A N/A27 Oct 2026 19:0028 Oct 2026 04:45COMPLETESecondary equipt maintenance0
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.