Most frequent constraint: Stubbo Solar Farm 1+2 inverter limit of 77. Constraint to violate if Stubbo Solar Farm has inverter availability greater than 77. Swamp out otherwise. DS only
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
5
% of period
0.2%
Network as built share
0.0%
Equipment outage share
7.8%
Single-plant limit share
92%
Units in constraints
2
MW in constraints
400
Curtailed while constrained
0.3 GWh
Value of that curtailment
$0.0m
Network as built: the limit binds with every line and transformer in service. AEMO marks these “Out = Nil”.
Equipment outage: the limit applies only while a named line or transformer is out of service.
Limit on a single plant: AEMO caps one wind or solar farm. Most are system strength limits, which depend on how many coal, gas or hydro units and synchronous condensers are running nearby.
Constraint-hours by cause, per month
Network as builtEquipment outageLimit on a single plant
Constraints that bound in the period
Constraint
Hours
Cause
Limit type
AEMO description
N_STUBSF_77INV
2
Limit on a single plant
System Strength
Stubbo Solar Farm 1+2 inverter limit of 77. Constraint to violate if Stubbo Solar Farm has inverter availability greater than 77. Swamp out otherwise. DS only
N_STUBSF_29INV
1
Limit on a single plant
System Strength
Stubbo Solar Farm 1+2 inverter limit of 29. Constraint to violate if Stubbo Solar Farm has inverter availability greater than 29. Swamp out otherwise. DS only
N_STUBSF_76INV
1
Limit on a single plant
System Strength
Stubbo Solar Farm 1+2 inverter limit of 76. Constraint to violate if Stubbo Solar Farm has inverter availability greater than 76. Swamp out otherwise. DS only
N_STUBSF_0INV
0
Equipment outage
Other
Stubbo Solar Farm 1+2 inverter limit of zero. Constraint to violate if Stubbo Solar Farm 1+2 inverter availability greater than zero. Swamp out otherwise. DS only
N_STUBSF_185INV
0
Limit on a single plant
System Strength
Stubbo Solar Farm 1+2 inverter limit of 185. Constraint to violate if Stubbo Solar Farm 1+2 inverter availability greater than 185. Swamp out otherwise. DS only
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.