OL on 7490 or 7491 (T280 Drillham to T194 Columboola) 132kV feeder
QLD · Thermal · Q>NIL_DRLCLB_NIL
Most frequent constraint: Out= Nil, avoid OL on 7490 or 7491 (T280 Drillham to T194 Columboola) 132kV feeder, NIL trip. Feedback
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
1
% of period
0.0%
Network as built share
100%
Equipment outage share
0.0%
Single-plant limit share
0.0%
Units in constraints
3
MW in constraints
253
Curtailed while constrained
0.0 GWh
Value of that curtailment
$0.0m
Network as built: the limit binds with every line and transformer in service. AEMO marks these “Out = Nil”.
Equipment outage: the limit applies only while a named line or transformer is out of service.
Limit on a single plant: AEMO caps one wind or solar farm. Most are system strength limits, which depend on how many coal, gas or hydro units and synchronous condensers are running nearby.
Constraint-hours by cause, per month
Network as builtEquipment outageLimit on a single plant
Constraints that bound in the period
Constraint
Hours
Cause
Limit type
AEMO description
Q>NIL_DRLCLB_NIL
1
Network as built
Thermal
Out= Nil, avoid OL on 7490 or 7491 (T280 Drillham to T194 Columboola) 132kV feeder, NIL trip. Feedback
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.