NEM Dashboard

ITK
Period

OL on 7490 or 7491 (T280 Drillham to T194 Columboola) 132kV feeder

QLD · Thermal · Q>NIL_DRLCLB_NIL
Most frequent constraint: Out= Nil, avoid OL on 7490 or 7491 (T280 Drillham to T194 Columboola) 132kV feeder, NIL trip. Feedback
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
1
% of period
0.0%
Network as built share
100%
Equipment outage share
0.0%
Single-plant limit share
0.0%
Units in constraints
3
MW in constraints
253
Curtailed while constrained
0.0 GWh
Value of that curtailment
$0.0m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
Q>NIL_DRLCLB_NIL1Network as builtThermalOut= Nil, avoid OL on 7490 or 7491 (T280 Drillham to T194 Columboola) 132kV feeder, NIL trip. Feedback

Units behind it

UnitFuelMWWeightDirection
Dulacca Wind FarmWind1731.00discharge
RomaOCGT401.00discharge
RomaOCGT401.00discharge

Associated outages

No associated outage overlapped this period.
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.