Central Queensland: Gladstone corridor (Calliope River, Larcom Creek, Wurdong 275 kV)

QLD · Thermal · Q>NIL_LCCP_BCCP
Most frequent constraint: Out= Nil, avoid O/L Larcom Creek to Calliope River (8859) 275kV line on trip of Bouldercombe to Calliope River (812) 275kV line, Feedback
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
794
% of period
37%
Network as built share
59%
Equipment outage share
39%
Single-plant limit share
2.8%
Units in constraints
111
MW in constraints
22,138
Curtailed while constrained
232 GWh
Value of that curtailment
$15.5m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
Q>NIL_CPWU_CLWU168Network as builtThermalOut= Nil, avoid O/L Calliope River to Wurdong (818) 275kV line on trip of Calvale to Wurdong (871) 275kV line, Feedback. [DS RHS to swamp if 8810+8811 lines O/S]
Q>NIL_CPWU_CLWU_RAD154Network as builtThermalOut= NIL, Boyne Island Potlines radialised, avoid O/L Calliope River to Wurdong (818) 275kV line on trip of Calvale to Wurdong (871) 275kV line, Feedback.
Q>LCCP_BCCP_CLWU110Equipment outageThermalOut= Larcom Creek to Calliope River (8859), avoid O/L Bouldercombe to Calliope River (812) on trip of Calvale to Wurdong (871) line, Feedback
Q>NIL_LCCP_BCCP92Network as builtThermalOut= Nil, avoid O/L Larcom Creek to Calliope River (8859) 275kV line on trip of Bouldercombe to Calliope River (812) 275kV line, Feedback
Q:NIL_CS64Network as builtTransient StabilityOut = Nil, CQ-SQ transient stability limit (upper limit of 2100MW)
Q>PWSP_PWSP_WOSP63Equipment outageThermalOut= Palmwoods to South Pine (808) line, avoid O/L on parallel 110kV lines between Palmwoods and South Pine (745/746) on trip of Woolooga to South Pine (807) 275kV line, Feedback
Q>LCCP_CLWU_BCCP50Equipment outageThermalOut= Larcom Creek to Calliope River (8859), avoid O/L Calvale to Wurdong (871) on trip of Bouldercombe to Calliope River (812) line, Feedback
Q>NIL_RGLC_BCCP30Network as builtThermalOut= Nil, avoid O/L Raglan to Larcom Creek (8875) on trip of Bouldercombe to Calliope River (812) line, Feedback
Q>CPWO2_CPWU_CPWO129Equipment outageThermalOut= Calliope River to Woolooga (814) 275kV line Tee Gin Gin, avoid O/L Calliope River to Wurdong (818) 275kV on trip of Calliope River to Woolooga (813) 275kV line, Feedback
Q>X_LCWO_BCCP_CLWU23Equipment outageThermalOut= 8859 (Larcom Creek - Calliope River) + 814 (Calliope River - Gin Gin - Woolooga) 275kV lines, avoid O/L Bouldercombe to Calliope River (812) on trip of Calvale to Wurdong (871) line, Feedback
Q>NIL_CLWU_CPWU_RAD21Network as builtThermalOut= NIL, Boyne Island Potlines radialised, avoid O/L Calvale to Wurdong (871) 275kV line on trip of Calliope River to Wurdong (818) 275kV line, Feedback
Q>CPSP_WOSP_PWSP20Equipment outageThermalOut= H9 Palmwoods - H2 South Pine (808) + H67 Calliope River - H6 Gin Gin (813/1) 275kV feeders, avoid O/L on Palmwood - Beerwah (745/4 or 746/4) 110kV feeders on trip of H5 Woolooga - H2 South Pine (807) 275kV line, Feedback
Q>NIL_WOPW_WOSP16Network as builtThermalOut= Nil, avoid O/L H5 Woolooga to H9_Palmwoods (810) on trip of H5 Woolooga to H2 South Pine (807) line, Feedback
Q_CS_185015Limit on a single plantDiscretionaryQld Central to Qld South upper transfer limit of 1850MW (discretionary)
Q>X_LCWO_CLWU_BCCP13Equipment outageThermalOut= 8859 (Larcom Creek - Calliope River) + 814 (Calliope River - Gin Gin - Woolooga) 275kV lines, avoid O/L Calvale to Wurdong (871) on trip of Bouldercombe to Calliope River (812) line, Feedback
Q>NIL_BCCP_LCCP11Network as builtThermalOut= Nil, avoid O/L Bouldercombe to Calliope River (812) 275kV line on trip of Larcom Creek to Calliope River (8859) 275kV line, Feedback
Q>NIL_LCCP_CLWU9Network as builtThermalOut= Nil, avoid O/L Larcom Creek to Calliope River (8859) 275kV line on trip of Calvale to Wurdong (871) 275kV line, Feedback
Q_CS_11008Limit on a single plantDiscretionaryQld Central to Qld South upper transfer limit of 1100MW (discretionary)
CA_SYDS_59C65E31_17Equipment outageThermalConstraint Automation, O/L 275KV_871:5:I:275@H24_CALV@QLD for CTG LQIC on trip of 812 H67_CALR-H10_BCMB 275kV LINE. Generated by STNET[BNECR4] Host NORREGEEMP7(EMPSYD)
CA_BRIS_59E2FBCC_17Equipment outageThermalConstraint Automation, O/L 275KV_871:5:I:275@H24_CALV@QLD for CTG LQIF on trip of 818 H67_CALR-H40_WURD 275KV LINE. Generated by STNET[BNECR5] Host BNEREGEEMP6(EMPBRI) [NOTE: DS ONLY]
Q>CLWU_BCCP_BCRG7Equipment outageThermalOut= Calvale to Wurdong (871), avoid O/L Bouldercombe to Calliope River (812) on trip of Bouldercombe to Raglan (811) line, Feedback
Q>CLWU_LCCP_BCCP6Equipment outageThermalOut= Calvale to Wurdong (871), avoid O/L Larcom Creek to Calliope River (8859) on trip of Bouldercombe to Calliope River (812) line, Feedback
CA_BRIS_59E3F2B6_15Equipment outageThermalConstraint Automation, O/L 275KV_818:818:I:275@H67_CALR@QLD for CTG LQIV on trip of 871 H24_CALV - H40_WURD 275KV. Generated by STNET[BNECR3] Host BNEREGEEMP6(EMPBRI). (NOTE: DS Only)
Q>NIL_RGLC_CLWU4Network as builtThermalOut= Nil, avoid O/L Raglan to Larcom Creek (8875) 275kV line on trip of Calvale to Wurdong (871) 275kV line, Feedback
Q>NIL_WOSP_PWSP4Network as builtThermalOut= NIL, avoid O/L Woolooga to South Pine (807) 275kV line on trip of Palmwoods to South Pine (808) 275kV line, Feedback
Showing the 25 constraints with the most hours; 16 others also bound.

Units behind it

UnitFuelMWWeightDirection
MacIntyre Wind FarmWind9230.10charge
MacIntyre Wind FarmWind9230.96discharge
Kogan CreekCoal7440.95discharge
Kogan CreekCoal7440.10charge
Darling DownsCCGT6440.95discharge
Darling DownsCCGT6440.10charge
Coopers Gap Wind FarmWind4530.94discharge
Coopers Gap Wind FarmWind4530.10charge
Tarong NorthCoal4500.10charge
Tarong NorthCoal4500.95discharge
Millmerran Power PlantCoal4260.10charge
Millmerran Power PlantCoal4260.96discharge
Millmerran Power PlantCoal4260.96discharge
Millmerran Power PlantCoal4260.10charge
Callide CCoal4241.00discharge
Callide CCoal4201.00discharge
Western Downs Green Power Hub P/LSolar4000.10charge
Western Downs Green Power Hub P/LSolar4000.95discharge
Aldoga Solar FarmSolar3871.00discharge
Aldoga Solar FarmSolar3871.00charge
Swanbank E GTCCGT3850.10charge
Swanbank E GTCCGT3850.99discharge
Broadsound Energy ParkSolar3681.00discharge
StanwellCoal3651.00discharge
StanwellCoal3651.00discharge
StanwellCoal3651.00discharge
StanwellCoal3651.00discharge
TarongCoal3500.95discharge
Callide BCoal3501.00discharge
TarongCoal3500.10charge
TarongCoal3500.10charge
TarongCoal3500.10charge
TarongCoal3500.10charge
TarongCoal3500.95discharge
TarongCoal3500.95discharge
Callide BCoal3501.00discharge
TarongCoal3500.95discharge
Clarke Creek Wind FarmWind3461.00discharge
Tarong BESS - StanwellBattery3000.95discharge
Stanwell Battery Energy Storage SystemBattery3001.00discharge
WivenhoeWater2851.00discharge
WivenhoeWater2851.00discharge
WivenhoeWater2850.10charge
WivenhoeWater2850.10charge
GladstoneCoal2801.00charge
GladstoneCoal2801.00charge
GladstoneCoal2801.00discharge
GladstoneCoal2801.00discharge
GladstoneCoal2801.00discharge
GladstoneCoal2801.00discharge
GladstoneCoal2801.00discharge
GladstoneCoal2801.00discharge
GladstoneCoal2801.00charge
GladstoneCoal2801.00charge
GladstoneCoal2801.00charge
GladstoneCoal2801.00charge
Western Downs Battery - Stage 1 And 2Battery2550.10charge
Western Downs Battery - Stage 1 And 2Battery2550.95discharge
Western Downs Battery - Stage 1 And 2Battery2550.95discharge
Wambo Wind Farm Stage 2Wind2520.23discharge
Wambo Wind FarmWind2520.94discharge
Swanbank Battery FarmBattery2500.99discharge
Wandoan Solar FarmSolar2400.18discharge
Woolooga Solar FarmSolar2221.00discharge
Woolooga Solar FarmSolar2220.47charge
Woolooga BESSBattery2220.40charge
Woolooga BESSBattery2221.00discharge
Columboola Solar FarmSolar2170.10charge
Columboola Solar FarmSolar2170.95discharge
Greenbank BESSBattery2000.99discharge
BraemarOCGT1880.10charge
BraemarOCGT1880.95discharge
BraemarOCGT1880.10charge
BraemarOCGT1880.95discharge
BraemarOCGT1880.95discharge
BraemarOCGT1880.10charge
Mount EmeraldWind1811.00discharge
Edenvale Solar ParkSolar1800.95discharge
Edenvale Solar ParkSolar1800.10charge
Broadsound Energy ParkBattery1801.00discharge
Braemar 2 Power StationOCGT1730.10charge
Braemar 2 Power StationOCGT1730.95discharge
Braemar 2 Power StationOCGT1730.95discharge
Oakey Power StationOCGT1730.96discharge
Oakey Power StationOCGT1730.96discharge
Braemar 2 Power StationOCGT1730.10charge
Oakey Power StationOCGT1730.10charge
Oakey Power StationOCGT1730.10charge
Braemar 2 Power StationOCGT1730.10charge
Braemar 2 Power StationOCGT1730.95discharge
Dulacca Wind FarmWind1730.10charge
Dulacca Wind FarmWind1730.95discharge
Daydream Solar FarmSolar1681.00discharge
Gangarri Solar FarmSolar1620.95discharge
Gangarri Solar FarmSolar1620.10charge
Townsville Power Staton - QPMCCGT1601.00discharge
Wandoan South Solar Stage 1Solar1600.10charge
Wandoan South Solar Stage 1Solar1600.95discharge
Kaban Wind FarmWind1571.00discharge
Ulinda Park BESSBattery1550.95discharge
Munna Creek Solar FarmSolar1541.00discharge
Munna Creek Solar FarmSolar1540.47charge
Bluegrass Solar FarmSolar1480.95discharge
Bluegrass Solar FarmSolar1480.10charge
Mt StuartOCGT1461.00discharge
Mt StuartOCGT1461.00discharge
Condamine ACCGT1440.10charge
Condamine ACCGT1440.95discharge
Sun Metals Corporation Solar FarmSolar1431.00discharge
Haughton Solar Farm Stage 1Solar1331.00discharge
Mt StuartOCGT1321.00discharge
Ross River Solar FarmSolar1281.00discharge
Kidston Pumped Hydro (load 2)–1251.00charge
Kidston Pumped Hydro (load 1)–1251.00charge
Kidston Pumped Hydro (gen 1)Water1251.00discharge
Kidston Pumped Hydro (gen 2)Water1251.00discharge
Gunsynd Solar FarmSolar1230.96discharge
Darling Downs Solar FarmSolar1210.10charge
Yarranlea Solar FarmSolar1210.96discharge
Darling Downs Solar FarmSolar1210.95discharge
Yarranlea Solar FarmSolar1210.10charge
Lilyvale Solar FarmSolar1181.00discharge
Clare Solar FarmSolar1101.00discharge
Clarke Creek Wind FarmWind1041.00discharge
Wandoan South BESSBattery1000.95discharge
Chinchilla BESSBattery1000.95discharge
Chinchilla BESSBattery1000.10charge
Wandoan South BESSBattery1000.10charge
Moura Solar FarmSolar991.00discharge
Clermont Solar FarmSolar921.00discharge
Susan River Solar FarmSolar851.00discharge
Susan River Solar FarmSolar851.00charge
Townsville Power Staton - QPMCCGT841.00discharge
Bundaberg Solar FarmSolar780.65charge
Bundaberg Solar FarmSolar781.00discharge
Emerald Solar ParkSolar721.00discharge
Rugby Run Solar FarmSolar651.00discharge
Childers Solar FarmSolar641.00discharge
Childers Solar FarmSolar641.00charge
Hayman Solar FarmSolar581.00discharge
Hamilton Solar FarmSolar581.00discharge
Whitsunday Solar FarmSolar581.00discharge
Oakey 2 Solar FarmSolar560.96discharge
Oakey 2 Solar FarmSolar560.10charge
Bouldercombe Battery projectBattery501.00charge
Bouldercombe Battery projectBattery501.00discharge
Kidston Solar Project Phase One 50MWSolar501.00discharge
Kennedy Energy Park - Phase 1 - WindWind431.00discharge
Collinsville PVSolar421.00discharge
RomaOCGT400.10charge
RomaOCGT400.95discharge
RomaOCGT400.10charge
Kingaroy Solar FarmSolar400.95discharge
Kingaroy Solar FarmSolar400.10charge
RomaOCGT400.95discharge
Barcaldine Power StationOCGT371.00discharge
Barron GorgeWater351.00discharge
Barron GorgeWater351.00discharge
Maryrorough Solar FarmSolar340.96discharge
Maryrorough Solar FarmSolar340.10charge
Warwick Solar FarmSolar320.96discharge
Warwick Solar FarmSolar320.10charge
Warwick Solar FarmSolar320.96discharge
Warwick Solar FarmSolar320.10charge
Middlemount Solar FarmSolar261.00discharge
Oakey Solar FarmSolar250.96discharge
Oakey Solar FarmSolar250.10charge
KareeyaWater221.00discharge
KareeyaWater221.00discharge
KareeyaWater221.00discharge
KareeyaWater221.00discharge
Kennedy Energy Park - Phase 1 - SolarSolar151.00discharge
Wivenhoe Pump 2–01.00charge
Wivenhoe Pump 1–01.00charge

Associated outages

SubstationEquipmentStartEndStatusReasonBinding hours (whole outage)
H8_BOYNE, 132KV_7146LINE 132KV_714614 Oct 2026 23:3024 Oct 2026 12:00COMPLETEHV equipt maintenance162
275KV_8859, H58_LARCLINE 275KV_885921 Sep 2026 07:002 Oct 2026 17:00COMPLETEHV equipt maintenance149
H29_STAN, H24_CALVLINE 275KV_855, CB CPLR_5052, CB 5012, CB FDR_855214 Sep 2026 08:301 Oct 2026 18:00COMPLETEHV equipt commissioning138
H6_GNGN, 275KV_814/2CB FDR_8142, LINE 275KV_814/226 Oct 2026 10:0030 Oct 2026 17:00COMPLETEHV equipt maintenance37
H58_LARC, 275KV_8859LINE 275KV_885926 Oct 2026 09:0030 Oct 2026 17:00COMPLETEHV equipt maintenance37
H2_SPINE, H9_PLMWDLINE 275KV_80825 Aug 2026 07:002 Sep 2026 17:00COMPLETEHV equipt maintenance36
H6_GNGN, 275KV_814/2LINE 275KV_814/2, CB FDR_81427 Oct 2026 10:009 Oct 2026 17:00COMPLETEHV equipt maintenance30
H9_PLMWD, H2_SPINELINE 275KV_8089 Sep 2026 07:0016 Sep 2026 17:00COMPLETEHV equipt maintenance27
H5_WLGALINE 275KV_814/225 Aug 2026 10:0028 Aug 2026 17:00COMPLETEHV equipt commissioning20
H40_WURD, H24_CALVCB CPLR_5042, CB FDR_8712, LINE 275KV_87116 Nov 2026 05:0016 Nov 2026 16:00COMPLETEHV equipt maintenance9
H9_PLMWD, H2_SPINELINE 275KV_80822 Sep 2026 07:0025 Sep 2026 17:00COMPLETEHV equipt maintenance8
275KV_813/2LINE 275KV_813/222 Sep 2026 10:0030 Sep 2026 17:00COMPLETEHV equipt commissioning8
H24_CALV, S2_HALYSLINE 275KV_8811, CB CPLR_5072, CB FDR_88112, REAC 8811_H24, CB CPLR_506224 Nov 2026 10:0026 Nov 2026 17:00PTPHV equipt maintenance8
275KV_812, H10_BCMB, H24_CALV, H40_WURDLINE 275KV_871, LINE 275KV_81223 Sep 2026 21:2724 Sep 2026 12:00COMPLETESecondary equipt maintenance8
H20_BSNDCB FDR_8831226 Oct 2026 08:0026 Oct 2026 16:00COMPLETEHV equipt maintenance6
H24_CALVCB FDR_871216 Nov 2026 09:0016 Nov 2026 15:00COMPLETEHV equipt maintenance5
H6_GNGN, 275KV_814/2LINE 275KV_814/2, CB FDR_814214 Oct 2026 10:0016 Oct 2026 17:00COMPLETEHV equipt maintenance3
275KV_813/1LINE 275KV_813/110 Nov 2026 08:0013 Nov 2026 17:00RESUBMITHV equipt commissioning1
T8_GYMP, H5_WLGALINE 132KV_748/2, CB FDR_74824 Nov 2026 09:314 Nov 2026 12:00COMPLETEHV equipt maintenance1
T11_CBLT, H9_PLMWD, H2_SPINELINE 110KV_746/4, LINE 110KV_746/123 Sep 2026 16:0023 Sep 2026 20:00COMPLETEHV equipt maintenance0
Source: AEMO. Summary built 25 Nov 2026 02:26; data through 25 Nov 2026 01:25 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.