Haughton Solar Farm — system strength

QLD · System Strength · Q_2+LCCP_HAUGHT11
Most frequent constraint: Limit Haughton SF to 100% dependent on status of Stanwell, Callide B+C, Gladstone, Kareeya, Haughton Syncon, NQLD demand, Ross+FNQ demand; Zero if it does not meet the condition
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
268
% of period
12%
Network as built share
0.0%
Equipment outage share
0.0%
Single-plant limit share
100%
Units in constraints
1
MW in constraints
133
Curtailed while constrained
3.4 GWh
Value of that curtailment
$0.1m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
Q_2+LCCP_HAUGHT11265Limit on a single plantSystem StrengthLimit Haughton SF to 100% dependent on status of Stanwell, Callide B+C, Gladstone, Kareeya, Haughton Syncon, NQLD demand, Ross+FNQ demand; Zero if it does not meet the condition
Q_A39B_HAUGHT11249Limit on a single plantSystem StrengthLimit Haughton SF to 100% dependent on status of Stanwell, Callide B+C, Gladstone, Kareeya, Haughton Syncon, NQLD demand, Ross+FNQ demand; Zero if it does not meet the condition
Q_2+RSVC_HAUGHT1123Limit on a single plantSystem StrengthLimit Haughton SF to 100% dependent on status of Stanwell, Callide B+C, Gladstone, Kareeya, Haughton Syncon, NQLD demand, Ross+FNQ demand; Zero if it does not meet the condition
Q_2+3+VC_HAUGHT1122Limit on a single plantSystem StrengthLimit Haughton SF to 100% dependent on status of Stanwell, Callide B+C, Gladstone, Kareeya, Haughton Syncon, NQLD demand, Ross+FNQ demand; Zero if it does not meet the condition
Q_STR_A19B_HASF10Limit on a single plantSystem StrengthNo limit to Haughton Solar Farm if Stan>=2+Cal>=1+Cal+Glad>=2+ (Stan+Cal+Glad) >=7, Kar>=2,NQLD>50&70(AVG,(Townsville GT>=1, if Kar,2) + Haughton syncon ON ,Zero otherwise.
Q_STR_NIL_HAUGHT112Limit on a single plantSystem StrengthLimit Haughton SF to 100%, 50%, 10% dependent on status of Stanwell, Callide B+C, Gladstone, Kareeya, Haughton/Townsville/Clarke Creek Syncon, NQLD demand, Ross+FNQ demand; Zero if it does not meet the condition
Q_2+1_R4_HAUGHT112Limit on a single plantSystem StrengthLimit Haughton SF to100% dependent on status of Stanwell, Callide B+C, Gladstone, Kareeya, Haughton Syncon, NQLD demand, Ross+FNQ demand; Zero if it does not meet the condition
Q_A19A_HAUGHT110Limit on a single plantSystem StrengthLimit Haughton SF to 100%, 0% dependent on status of Stanwell, Callide B+C, Gladstone, Kareeya, Haughton Syncon, NQLD demand, Ross+FNQ demand; Zero if it does not meet the condition

Units behind it

UnitFuelMWWeightDirection
Haughton Solar Farm Stage 1Solar1331.00discharge

Associated outages

SubstationEquipmentStartEndStatusReasonBinding hours (whole outage)
275KV_8859, H58_LARCLINE 275KV_885921 Sep 2026 07:002 Oct 2026 17:00COMPLETEHV equipt maintenance265
H29_STAN, H24_CALVCB 5012, CB FDR_8552, LINE 275KV_855, CB CPLR_505214 Sep 2026 08:301 Oct 2026 18:00COMPLETEHV equipt commissioning250
H13_ROSSSVC 1_H13, CB SVC_5812, CB CPLR_502223 Sep 2026 13:3224 Sep 2026 17:00COMPLETEHV equipt maintenance21
H13_ROSSSVC 1_H13, CB CPLR_5022, CB SVC_581223 Sep 2026 20:0024 Sep 2026 12:00COMPLETEHV equipt maintenance16
T34_MRNB, T110_PKD, H15_LILYCB TFMR_4412, LINE 132KV_7382, TRANS X1, LINE 132KV_7124/1, LINE N/A, LINE 132KV_7114/1, LINE 738226 Sep 2026 07:3026 Sep 2026 14:00COMPLETEHV equipt maintenance6
T34_MRNB, T110_PKD, H15_LILYCB TFMR_4422, TRANS X2, LINE 7382, LINE 132KV_7382, LINE 132KV_7114/1, LINE 132KV_7124/1, LINE N/A24 Sep 2026 17:0024 Sep 2026 23:59COMPLETEHV equipt maintenance4
H13_ROSSCB CPLR_5022, CB SVC_5812, SVC 1_H1321 Sep 2026 19:4222 Sep 2026 00:30COMPLETEHV equipt maintenance2
Source: AEMO. Summary built 25 Nov 2026 02:26; data through 25 Nov 2026 01:25 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.