Most frequent constraint: Out= Morgan Whyalla Pump 2 - Morgan Whyalla Pump 3 132 kV line avoid O/L Robertstown to North West Bend #1 132kV line on trip of Nil, Feedback
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
126
% of period
5.8%
Network as built share
1.8%
Equipment outage share
98%
Single-plant limit share
0.5%
Units in constraints
3
MW in constraints
18
Curtailed while constrained
0.1 GWh
Value of that curtailment
$0.0m
Network as built: the limit binds with every line and transformer in service. AEMO marks these “Out = Nil”.
Equipment outage: the limit applies only while a named line or transformer is out of service.
Limit on a single plant: AEMO caps one wind or solar farm. Most are system strength limits, which depend on how many coal, gas or hydro units and synchronous condensers are running nearby.
Constraint-hours by cause, per month
Network as builtEquipment outageLimit on a single plant
Constraints that bound in the period
Constraint
Hours
Cause
Limit type
AEMO description
S>>MW2MW3_RBNW1
72
Equipment outage
Thermal
Out= Morgan Whyalla Pump 2 - Morgan Whyalla Pump 3 132 kV line avoid O/L Robertstown to North West Bend #1 132kV line on trip of Nil, Feedback
S>>MW2MW3_NWRB1
45
Equipment outage
Thermal
Out= Morgan Whyalla Pump 2 - Morgan Whyalla Pump 3 132 kV line avoid O/L North West Bend to Robertstown #1 132kV line on trip of Nil, Feedback
S>>V_MWP3RB_RBNW1
6
Equipment outage
Thermal
Out= Morgan Whyalla Pump3 - Robertstown 132kV line, avoid O/L Roberstown-North West Bend 132kV line on trip of Nil trip, Feedback
S>>V_NIL_NIL_RBNW1
2
Network as built
Thermal
Out = Nil, avoid overloading Robertstown-North West Bend #1 132kV lines for no contingencies, feedback
S-MWPS1-PV_0
1
Limit on a single plant
Unit Zero
Discretionary upper limit for SA WATER Morgan Whyalla Pump Station 1 PV generation of 0 MW
S-MWPS2-PV_0
1
Limit on a single plant
Unit Zero
Discretionary upper limit for SA WATER Morgan Whyalla Pump Station 2 PV generation of 0 MW
S>>V_NWRB2_RBNW1
0
Equipment outage
Thermal
Out = North West Bend-Robertstown 132kV No2 line, limit SA-V on ML to avoid O/L of Robertstown-NWB1 132kV line
CB CB6149, CB CB6023, CB CB6185, LINE 2, CB CB6024
15 Sep 2026 09:30
15 Sep 2026 09:45
COMPLETE
HV equipt maintenance
0
N_W_B, R_TOWN, MW_2, MW_3
LINE MW2MW3_1, CB CB6149, CB CB6023, LINE 2, CB CB6185, CB CB6024
13 Sep 2026 17:15
13 Sep 2026 17:30
COMPLETE
HV equipt maintenance
0
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.