Remaining Davenport 132/ TX on NIL trip

SA · Thermal · S>DVTX_NIL_DVTX
Most frequent constraint: Out= One Davenport 275/132kV TX O/S, avoid O/L of remaining Davenport 132/275kV TX on NIL trip.
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
63
% of period
2.9%
Network as built share
99%
Equipment outage share
0.0%
Single-plant limit share
1.2%
Units in constraints
2
MW in constraints
270
Curtailed while constrained
1.8 GWh
Value of that curtailment
$0.1m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
S>DVTX_NIL_DVTX62Network as builtThermalOut= One Davenport 275/132kV TX O/S, avoid O/L of remaining Davenport 132/275kV TX on NIL trip.
S-BUPV2_00Limit on a single plantUnit ZeroDiscretionary upper limit for Bungala Stage 2 PV generation of 0 MW
NC_S_BNGSF20Limit on a single plantNon-ConformanceNon Conformance Constraint for Bungala #2 Solar Farm

Units behind it

UnitFuelMWWeightDirection
Bungala One Solar FarmSolar1351.00discharge
Bungala Two Solar FarmSolar1351.00discharge

Associated outages

SubstationEquipmentStartEndStatusReasonBinding hours (whole outage)
DAVENPCB CB6549, CB CB6254, TRANS T_1, CB CB625722 Sep 2026 08:0029 Sep 2026 07:00COMPLETEHV equipt maintenance45
DAVENPCB CB6258, CB CB6548, TRANS T_2, CB CB62558 Sep 2026 07:4515 Sep 2026 07:00COMPLETEHV equipt maintenance17
DAVENPCB CB6565, CB CB6549, CB CB6257, CB 8070, TRANS T_1, CB CB6567, CB CB8008, CB CB6562, CB CB6254, BUS WB, CB CB6614, CB CB659329 Sep 2026 07:0029 Sep 2026 15:30COMPLETEHV equipt maintenance0
EMEROO, DAVENPLINE N/A, LINE EMEDVP_!, TRANS T_222 Sep 2026 13:2922 Sep 2026 17:00COMPLETEHV equipt maintenance0
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.