NEM Dashboard

ITK
Period

Snowtown - Bungama on loss of Hummocks - Waterloo

SA · Thermal · S>NIL_HUWT_STBG
Most frequent constraint: Out = Nil; avoid O/L on Snowtown - Bungama line 132kV on loss of Hummocks - Waterloo 132kV line, Feedback
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
40
% of period
1.9%
Network as built share
100%
Equipment outage share
0.0%
Single-plant limit share
0.0%
Units in constraints
7
MW in constraints
502
Curtailed while constrained
0.3 GWh
Value of that curtailment
$0.0m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
S>NIL_HUWT_STBG40Network as builtThermalOut = Nil; avoid O/L on Snowtown - Bungama line 132kV on loss of Hummocks - Waterloo 132kV line, Feedback

Units behind it

UnitFuelMWWeightDirection
Blyth BESSBattery2000.17discharge
Snowtown S2 Wind FarmWind1440.17discharge
Waterloo Wind FarmWind1310.93discharge
Snowtown S2 Wind FarmWind1260.17discharge
Snowtown Wind FarmWind991.00discharge
Wattle PointWind911.00discharge
Mintaro GTOCGT901.00discharge
Clements Gap Wind FarmWind571.00discharge
Dalrymple BESSBattery301.00discharge
Morgan To Whyalla Pipeline No 4 PSSolar60.38discharge

Associated outages

No associated outage overlapped this period.
Source: AEMO. Summary built 25 Nov 2026 02:56; data through 25 Nov 2026 01:55 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.