| S>>BWMP_TWPA_TPRS | 42 | Equipment outage | Thermal | Out= Blyth West- Munno Para 275kV line with Blyth West CB8002 OPEN, avoid O/L Templers-Roseworthy 132kV line on trip of Templers West-Para 275kV line, Feedback |
| S^NIL_SA_NORTH | 24 | Network as built | Voltage Stability | Out = NIL, Manage voltage collapse in northern SA for the trip of one 275kV line between Davenport-Para or Davenport-Tungkillo.(Note: for both DV + RB Syn Cons are I/S, OR one DV Syn Con O/S, OR one RB Syn Con O/S, OR one DV +RB Syn Con O/S) |
| S>>NIL_TWPA_TPRS | 16 | Network as built | Thermal | Out= NIL, avoid O/L Templers-Roseworthy 132kV line on trip of Templers West-Para 275kV line, Feedback |
| S>>BWMP_DVBR_RHBG-T | 3 | Equipment outage | Thermal | Out= Blyth West- Munno Para 275kV line with Blyth West CB8002 OPEN, avoid O/L Redhill- Brinkworth 132kV T line on trip of Davenport-Brinkworth 275kV line, Feedback |
| S>>BWMP_BRTW_WTTP | 3 | Equipment outage | Thermal | Out= Blyth West- Munno Para 275kV line with Blyth West CB8002 OPEN, avoid O/L Waterloo-Templers 132kV line on trip of Brinkworth-Templers West 275kV line, Feedback |
| S>>BWMP_HUWT_RHBG-T | 3 | Equipment outage | Thermal | Out= Blyth West- Munno Para 275kV line with Blyth West CB8002 OPEN, avoid O/L Redhill-Brinkworth 132kV T line on trip of Hummocks-Waterloo 132kV line, Feedback |
| S>>BRTW_BWPA_WTTP | 3 | Equipment outage | Thermal | Out= Brinkworth- Templers West 275kV line, avoid O/L Waterloo-Templers 132kV on trip of Blyth West-Munno Para 275kV line, Feedback |
| S>>NIL_BWMP_WTTP | 2 | Network as built | Thermal | Out= Nil, avoid O/L Waterloo - Templers 132kV on trip of Blyth West- Munno Para 275kV line, Feedback |
| SA_ISLE_STRENGTH | 1 | Limit on a single plant | System Strength | Maximum limit (1900 MW) for SA non-synchronous generation for system strength requirements when SA is at risk of separation or when islanded (NOTE: This limit applies when 2-4 syn cons are I/S at RB and DV). |
| S>>CNRB_TWPA_TPRS | 1 | Equipment outage | Thermal | Out= Canowie-Robertstown 275kV line, avoid O/L Templers-Roseworthy 132kV line on trip of Templers West-Para 275kV line, Feedback |
| S>>CNRB_BWPA_RHBR-T | 1 | Equipment outage | Thermal | Out= Canowie-Robertstown 275kV line, avoid O/L Redhill-Brinkworth T 132kV line on trip of Blyth West-Munno Para 275kV line, Feedback |
| S>>NIL_BRTW_WTTP | 0 | Network as built | Thermal | Out= Nil, avoid O/L Waterloo - Templers 132kV on trip of Brinkworth - Templers West 275kV line, Feedback |
| S>HUWT_BWPA_RHBR-T | 0 | Equipment outage | Thermal | Out= Hummocks-Waterloo 132kV line, avoid O/L Redhill-Brinkworth T 132kV line on trip of Blyth West-Munno Para 275kV line, Feedback |
| S>>BWMP_RBTU_WTTP | 0 | Equipment outage | Thermal | Out= Blyth West- Munno Para 275kV line with Blyth West CB8002 OPEN, avoid O/L Waterloo-Templers 132kV line on trip of Robertstown-Tungkillo 275kV line 1 or 2, Feedback |
| S>>PATW_RBTU_TPRS | 0 | Equipment outage | Thermal | Out= Para-Templers West 275kV line, avoid O/L Templers-Roseworthy 132kV line on trip of Robertstown-Tungkillo 275kV line 1 or 2, Feedback |
| S>BRDV_BWPA_RHBR | 0 | Equipment outage | Thermal | Out= Brinkworth - Davenport 275kV line, avoid O/L Redhill tee - Brinkworth 132kV on trip of Blyth West-Munno Para 275kV line, Feedback |