NEM Dashboard

ITK
Period

Manage voltage collapse in northern SA for the trip of one 275kV line

SA · Voltage Stability · S^NIL_SA_NORTH
Most frequent constraint: Out = NIL, Manage voltage collapse in northern SA for the trip of one 275kV line between Davenport-Para or Davenport-Tungkillo.(Note: for both DV + RB Syn Cons are I/S, OR one DV Syn Con O/S, OR one RB Syn Con O/S, OR one DV +RB Syn Con O/S)
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
88
% of period
4.1%
Network as built share
45%
Equipment outage share
54%
Single-plant limit share
1.5%
Units in constraints
60
MW in constraints
5,498
Curtailed while constrained
11.6 GWh
Value of that curtailment
$0.8m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
S>>BWMP_TWPA_TPRS42Equipment outageThermalOut= Blyth West- Munno Para 275kV line with Blyth West CB8002 OPEN, avoid O/L Templers-Roseworthy 132kV line on trip of Templers West-Para 275kV line, Feedback
S^NIL_SA_NORTH24Network as builtVoltage StabilityOut = NIL, Manage voltage collapse in northern SA for the trip of one 275kV line between Davenport-Para or Davenport-Tungkillo.(Note: for both DV + RB Syn Cons are I/S, OR one DV Syn Con O/S, OR one RB Syn Con O/S, OR one DV +RB Syn Con O/S)
S>>NIL_TWPA_TPRS16Network as builtThermalOut= NIL, avoid O/L Templers-Roseworthy 132kV line on trip of Templers West-Para 275kV line, Feedback
S>>BWMP_DVBR_RHBG-T3Equipment outageThermalOut= Blyth West- Munno Para 275kV line with Blyth West CB8002 OPEN, avoid O/L Redhill- Brinkworth 132kV T line on trip of Davenport-Brinkworth 275kV line, Feedback
S>>BWMP_BRTW_WTTP3Equipment outageThermalOut= Blyth West- Munno Para 275kV line with Blyth West CB8002 OPEN, avoid O/L Waterloo-Templers 132kV line on trip of Brinkworth-Templers West 275kV line, Feedback
S>>BWMP_HUWT_RHBG-T3Equipment outageThermalOut= Blyth West- Munno Para 275kV line with Blyth West CB8002 OPEN, avoid O/L Redhill-Brinkworth 132kV T line on trip of Hummocks-Waterloo 132kV line, Feedback
S>>BRTW_BWPA_WTTP3Equipment outageThermalOut= Brinkworth- Templers West 275kV line, avoid O/L Waterloo-Templers 132kV on trip of Blyth West-Munno Para 275kV line, Feedback
S>>NIL_BWMP_WTTP2Network as builtThermalOut= Nil, avoid O/L Waterloo - Templers 132kV on trip of Blyth West- Munno Para 275kV line, Feedback
SA_ISLE_STRENGTH1Limit on a single plantSystem StrengthMaximum limit (1900 MW) for SA non-synchronous generation for system strength requirements when SA is at risk of separation or when islanded (NOTE: This limit applies when 2-4 syn cons are I/S at RB and DV).
S>>CNRB_TWPA_TPRS1Equipment outageThermalOut= Canowie-Robertstown 275kV line, avoid O/L Templers-Roseworthy 132kV line on trip of Templers West-Para 275kV line, Feedback
S>>CNRB_BWPA_RHBR-T1Equipment outageThermalOut= Canowie-Robertstown 275kV line, avoid O/L Redhill-Brinkworth T 132kV line on trip of Blyth West-Munno Para 275kV line, Feedback
S>>NIL_BRTW_WTTP0Network as builtThermalOut= Nil, avoid O/L Waterloo - Templers 132kV on trip of Brinkworth - Templers West 275kV line, Feedback
S>HUWT_BWPA_RHBR-T0Equipment outageThermalOut= Hummocks-Waterloo 132kV line, avoid O/L Redhill-Brinkworth T 132kV line on trip of Blyth West-Munno Para 275kV line, Feedback
S>>BWMP_RBTU_WTTP0Equipment outageThermalOut= Blyth West- Munno Para 275kV line with Blyth West CB8002 OPEN, avoid O/L Waterloo-Templers 132kV line on trip of Robertstown-Tungkillo 275kV line 1 or 2, Feedback
S>>PATW_RBTU_TPRS0Equipment outageThermalOut= Para-Templers West 275kV line, avoid O/L Templers-Roseworthy 132kV line on trip of Robertstown-Tungkillo 275kV line 1 or 2, Feedback
S>BRDV_BWPA_RHBR0Equipment outageThermalOut= Brinkworth - Davenport 275kV line, avoid O/L Redhill tee - Brinkworth 132kV on trip of Blyth West-Munno Para 275kV line, Feedback

Units behind it

UnitFuelMWWeightDirection
Hallett GTOCGT2771.00discharge
Torrens Island BESSBattery2511.00discharge
Goyder South Wind Farm 1AWind2091.00discharge
Tailem Bend 3 BESSBattery2041.00discharge
Goyder South Wind Farm 1BWind2041.00discharge
Port Augusta Renewable Energy Park - WindWind2011.00discharge
Blyth BESSBattery2001.00discharge
Lake Bonney 2 Wind FarmWind1591.00discharge
Bungama SolarBattery1501.00discharge
Hornsdale Power Reserve Unit 1Battery1501.00discharge
Snowtown S2 Wind FarmWind1441.00discharge
Bungala One Solar FarmSolar1351.00discharge
Bungala Two Solar FarmSolar1351.00discharge
Hallett 4 North Brown HillWind1321.00discharge
Waterloo Wind FarmWind1310.21charge
Waterloo Wind FarmWind1311.00discharge
Lincoln Gap Wind Farm - stage 1Wind1261.00discharge
Snowtown S2 Wind FarmWind1261.00discharge
Summerfield BESS 2Battery1201.00discharge
Summerfield BESS 1Battery1201.00discharge
Willogoleche Wind FarmWind1201.00discharge
Hornsdale Wind Farm Stage 3Wind1121.00discharge
Templers BESSBattery1110.51charge
Templers BESSBattery1111.00discharge
Tailem Bend - SolarSolar1081.00discharge
Tailem Bend Stage 2 Solar ProjectSolar1051.00discharge
Hornsdale Wind Farm Stage 1Wind1021.00discharge
Hornsdale Wind Farm Stage 2Wind1021.00discharge
Mannum BESSBattery1001.00discharge
Mannum BESSBattery1000.17charge
Port Augusta Renewable Energy Park - SolarSolar991.00discharge
Snowtown Wind FarmWind991.00discharge
Snowtown Wind FarmWind991.00charge
Hallett Stage 1 Brown HillWind941.00discharge
Wattle PointWind911.00discharge
Wattle PointWind910.74charge
Mintaro GTOCGT900.75charge
Mintaro GTOCGT901.00discharge
Lincoln Gap Wind Farm - Stage 2Wind861.00discharge
Lake Bonney 1 Wind FarmWind801.00discharge
Mt Millar Wind FarmWind721.00discharge
Hallett Stage 2 Hallett HillWind711.00discharge
Cathedral RocksWind621.00discharge
Clements Gap BESSBattery600.78charge
Clements Gap BESSBattery601.00discharge
Clements Gap Wind FarmWind570.78charge
Clements Gap Wind FarmWind571.00discharge
Hallett 5 The Bluff WFWind521.00discharge
Port Lincoln GTOCGT500.75discharge
AngastonOther460.79charge
AngastonOther461.00discharge
CanundaWind461.00discharge
Tailem Bend Battery ProjectBattery421.00discharge
Lake Bonney 3 Wind FarmWind391.00discharge
Starfish HillWind331.00discharge
Dalrymple BESSBattery300.92discharge
Dalrymple BESSBattery300.74charge
Mannum Solar Farm 2Solar300.17charge
Mannum Solar Farm 2Solar301.00discharge
Port Lincoln GTOCGT240.75discharge
Mannum Adelaide Pumping Station No 2 - MAPL2 (Palmer)Solar161.00discharge
Mannum Adelaide Pumping Station No 3 - MAPL3 (Tungkillo)Solar161.00discharge
Mannum Adelaide Pumping Station No 2 - MAPL2 (Palmer)Solar160.22charge
Mannum Adelaide Pumping Station No 3 - MAPL3 (Tungkillo)Solar160.24charge
Murray Bridge - Onkaparinga Pipeline Pump 2Solar141.00discharge
Adelaide Desalination PlantSolar111.00discharge
Happy Valley ReservoirSolar111.00discharge
Lincoln Gap Wind Farm BatteryBattery91.00discharge
Bolivar Waste Water TreatmentSolar81.00discharge
Morgan To Whyalla Pipeline No 3 PSSolar81.00discharge
Morgan To Whyalla Pipeline No 1 PS And Water Filtration PlantSolar61.00discharge
Morgan To Whyalla Pipeline No 4 PSSolar61.00discharge
Morgan To Whyalla Pipeline No 2 PSSolar61.00discharge

Associated outages

SubstationEquipmentStartEndStatusReasonBinding hours (whole outage)
MUNN_P, BLYT_WLINE BHWPAR_1, LINE BHWMUN_1, CB 80026 Nov 2026 08:0013 Nov 2026 16:00PTPHV equipt maintenance43
T_BEND, S_EASTCB CB6595, LINE TABSES_2, CB CB6596, CAP 2, REAC R215 Sep 2026 18:3016 Sep 2026 06:30COMPLETEHV equipt commissioning1
MT_LOC, HALLET, R_TOWN, CANOWILINE MLOCAN_1, CB N/A, LINE CANROB_1, LINE CANHAL_1, LINE N/A29 Oct 2026 07:0031 Oct 2026 16:00COMPLETEHV equipt maintenance1
HUMMOC, W_LOOCB CB6135, TRANS T_1, TRANS 1, CB CB6133, LINE HUMWAT_131 Aug 2026 08:001 Sep 2026 18:30COMPLETEHV equipt commissioning0
TEMP_W, PARALINE N/A, LINE TEWPAR_123 Sep 2026 08:0023 Sep 2026 17:00COMPLETEHV equipt maintenance0
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.