Mannum Adelaide Pumping Station No 2 - MAPL2 (Palmer) — unit zero
SA · Unit Zero · S-MAPS2-PV_0
Most frequent constraint: Discretionary upper limit for SA WATER Mannum Adelaide Pumping Station No 2 PV (Palmer) generation of 0 MW
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
3
% of period
0.1%
Network as built share
0.0%
Equipment outage share
0.0%
Single-plant limit share
100%
Units in constraints
1
MW in constraints
16
Curtailed while constrained
0.0 GWh
Value of that curtailment
$0.0m
Network as built: the limit binds with every line and transformer in service. AEMO marks these “Out = Nil”.
Equipment outage: the limit applies only while a named line or transformer is out of service.
Limit on a single plant: AEMO caps one wind or solar farm. Most are system strength limits, which depend on how many coal, gas or hydro units and synchronous condensers are running nearby.
Constraint-hours by cause, per month
Network as builtEquipment outageLimit on a single plant
Constraints that bound in the period
Constraint
Hours
Cause
Limit type
AEMO description
S-MAPS2-PV_0
3
Limit on a single plant
Unit Zero
Discretionary upper limit for SA WATER Mannum Adelaide Pumping Station No 2 PV (Palmer) generation of 0 MW
CB CB6066, CB CB6163, TRANS T_2, TRANS 2, LINE N/A
2 Sep 2026 08:30
2 Sep 2026 17:30
COMPLETE
HV equipt maintenance
3
Source: AEMO. Summary built 25 Nov 2026 02:56; data through 25 Nov 2026 01:55 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.