Mannum Adelaide Pumping Station No 3 - MAPL3 (Tungkillo) — unit zero

SA · Unit Zero · S-MAPS3-PV_0
Most frequent constraint: Discretionary upper limit for SA WATER Mannum Adelaide Pumping Station No 3 PV (Kanmantoo) generation of 0 MW
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
3
% of period
0.1%
Network as built share
0.0%
Equipment outage share
0.0%
Single-plant limit share
100%
Units in constraints
1
MW in constraints
16
Curtailed while constrained
0.0 GWh
Value of that curtailment
$0.0m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
S-MAPS3-PV_03Limit on a single plantUnit ZeroDiscretionary upper limit for SA WATER Mannum Adelaide Pumping Station No 3 PV (Kanmantoo) generation of 0 MW

Units behind it

UnitFuelMWWeightDirection
Mannum Adelaide Pumping Station No 3 - MAPL3 (Tungkillo)Solar161.00discharge

Associated outages

SubstationEquipmentStartEndStatusReasonBinding hours (whole outage)
ANG_CK, MANNUMCB CB6066, LINE N/A, TRANS T_2, TRANS 2, CB CB61632 Sep 2026 08:302 Sep 2026 17:30COMPLETEHV equipt maintenance3
Source: AEMO. Summary built 25 Nov 2026 02:56; data through 25 Nov 2026 01:55 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.