NEM Dashboard

ITK
Period

Limit output of Wattle Pt WF based on Wattle Pt statcom status & the

SA · Other · S-NIL_WTPT_SC+INV_1
Most frequent constraint: Out=NIL, limit output of Wattle Pt WF based on Wattle Pt statcom status & the number of Dalrymble battery inverters I/S (Note: constraint is swamped when the number of Dalrymple battery inverters is less than 10)
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
24
% of period
1.1%
Network as built share
67%
Equipment outage share
26%
Single-plant limit share
6.9%
Units in constraints
1
MW in constraints
91
Curtailed while constrained
0.1 GWh
Value of that curtailment
$0.0m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
S-NIL_WTPT_SC+INV_19Network as builtOtherOut=NIL, limit output of Wattle Pt WF based on Wattle Pt statcom status & the number of Dalrymble battery inverters I/S (Note: constraint is swamped when the number of Dalrymple battery inverters is less than 10)
S-NIL_WTPT_SC+INV_28Network as builtOtherOut=NIL, limit output of Wattle Pt WF based on Wattle Pt statcom status & the number of Dalrymble battery inverters I/S (Note: constraint is swamped when the number of Dalrymple battery inverters is >= 10)
S^WPWF_606Equipment outageVoltage StabilityOut = Brinkworth-Redhill 132kV line (Redhill-Bungama section in service), Brinkworth-Redhill-Bungama line, Hummocks-Waterloo line or Bungama 275/132kV TX; limit Wattle Pt WF to 60MW to avoid voltage collapse on trip of Bungama TX or Hummocks-Waterloo line
S_WP_ISL2Limit on a single plantIslanding - UnitOut= Yorke Peninsula 132kV network islanded (i.e. island formed between Hummocks-Androssan West- Dalrymple 132kV network), Wattle Pt WF islanded

Units behind it

UnitFuelMWWeightDirection
Wattle PointWind911.00discharge

Associated outages

SubstationEquipmentStartEndStatusReasonBinding hours (whole outage)
W_LOO, HUMMOCLINE HUMWAT_1, TRANS 1, CB CB6133, CB CB6135, TRANS T_131 Aug 2026 08:001 Sep 2026 18:30COMPLETEHV equipt commissioning6
ARDN_W, DALRYMLINE ARWDLR_1, CB CB6166, CB N/A24 Oct 2026 10:3224 Oct 2026 14:00COMPLETEHV equipt maintenance2
BRINKW, CLEM_G, REDHIL, BUNGAM, CLEM_G_NCB CB6071, CB CB6030, CB CB6244, CB CB6243, CB CLNCLB_BKR, LINE REDCLM_1, CB CLNCLW_BKR, CB CB6006, CB CB607012 Oct 2026 07:3013 Oct 2026 15:30COMPLETEHV equipt maintenance0
Source: AEMO. Summary built 25 Nov 2026 02:56; data through 25 Nov 2026 01:55 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.