Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
636
% of period
29%
Network as built share
0.0%
Equipment outage share
100%
Single-plant limit share
0.0%
Units in constraints
0
MW in constraints
0
Curtailed while constrained
0.0 GWh
Value of that curtailment
$0.0m
Network as built: the limit binds with every line and transformer in service. AEMO marks these “Out = Nil”.
Equipment outage: the limit applies only while a named line or transformer is out of service.
Limit on a single plant: AEMO caps one wind or solar farm. Most are system strength limits, which depend on how many coal, gas or hydro units and synchronous condensers are running nearby.
Constraint-hours by cause, per month
Network as builtEquipment outageLimit on a single plant
Constraints that bound in the period
Constraint
Hours
Cause
Limit type
AEMO description
SVML_ZERO
636
Equipment outage
Not described
description pending
Units behind it
No units recorded for this area.
Associated outages
Substation
Equipment
Start
End
Status
Reason
Binding hours (whole outage)
MLNK_B, MLRC
LINE DC_CONVERTER, LINE ML_1
5 Nov 2026 01:00
4 Dec 2026 16:00
PTP
HV equipt maintenance
479
MLNK_B, MLRC
LINE DC_CONVERTER, LINE ML_1
2 Sep 2026 11:00
4 Sep 2026 13:00
COMPLETE
HV equipt commissioning
2
MLNK_B, MLRC
LINE DC_CONVERTER, LINE ML_1
19 Oct 2026 11:51
19 Oct 2026 13:00
COMPLETE
HV equipt commissioning
1
MW_2, R_TOWN, MW_3, N_W_B
CB CB6149, LINE 2, CB CB6185, LINE MW2MW3_1, CB CB6023, CB CB6024
30 Aug 2026 17:15
30 Aug 2026 17:30
COMPLETE
HV equipt commissioning
0
MLRC, MLNK_B
LINE ML_1, LINE DC_CONVERTER
24 Aug 2026 07:00
2 Sep 2026 11:00
COMPLETE
HV equipt maintenance
0
Source: AEMO. Summary built 25 Nov 2026 02:26; data through 25 Nov 2026 01:25 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.