NEM Dashboard

ITK
Period

Force Blyth BESS to charge if SOC below minimum required. Swamped

SA · Other · S_BLYTH_CHARGE
Most frequent constraint: Force Blyth BESS to charge if SOC below minimum required. Swamped otherwise. SOC limits for network intact, or SA risk-of-island conditions
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
0
% of period
0.0%
Network as built share
0.0%
Equipment outage share
0.0%
Single-plant limit share
100%
Units in constraints
1
MW in constraints
200
Curtailed while constrained
0.0 GWh
Value of that curtailment
$0.0m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
S_BLYTHB1_GE_ZERO0Limit on a single plantUnit ZeroBlyth BESS (BDU registration) Energy limit >= 0 MW
S_BLYTHB1_LE_ZERO0Limit on a single plantUnit ZeroBlyth BESS (BDU registration) Energy limit <= 0 MW

Units behind it

UnitFuelMWWeightDirection
Blyth BESSBattery2001.00charge
Blyth BESSBattery2001.00discharge

Associated outages

SubstationEquipmentStartEndStatusReasonBinding hours (whole outage)
BLYT_WCB 800115 Oct 2026 12:3015 Oct 2026 17:30COMPLETEHV equipt maintenance0
Source: AEMO. Summary built 25 Nov 2026 02:56; data through 25 Nov 2026 01:55 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.