NEM Dashboard

ITK
Period

Out=Davenport-Corraberra Hill 275kV line OR Davenport-Cultana 275 kV

SA · Discretionary · S_DVCL_270
Most frequent constraint: Out=Davenport-Corraberra Hill 275kV line OR Davenport-Cultana 275 kV line 2, discretionary upper limit for Cathedral Rocks WF + Mount Millar WF + Lincoln Gap WF+ Lincoln Gap Battery+ Pt Lincoln GTs <= 270 MW
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
1
% of period
0.1%
Network as built share
0.0%
Equipment outage share
0.0%
Single-plant limit share
100%
Units in constraints
7
MW in constraints
429
Curtailed while constrained
0.0 GWh
Value of that curtailment
$0.0m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
S_DVCL_2701Limit on a single plantDiscretionaryOut=Davenport-Corraberra Hill 275kV line OR Davenport-Cultana 275 kV line 2, discretionary upper limit for Cathedral Rocks WF + Mount Millar WF + Lincoln Gap WF+ Lincoln Gap Battery+ Pt Lincoln GTs <= 270 MW

Units behind it

UnitFuelMWWeightDirection
Lincoln Gap Wind Farm - stage 1Wind1261.00discharge
Lincoln Gap Wind Farm - Stage 2Wind861.00discharge
Mt Millar Wind FarmWind721.00discharge
Cathedral RocksWind621.00discharge
Port Lincoln GTOCGT501.00discharge
Port Lincoln GTOCGT241.00discharge
Lincoln Gap Wind Farm BatteryBattery91.00discharge

Associated outages

SubstationEquipmentStartEndStatusReasonBinding hours (whole outage)
CORR_H, DAVENPCB CB6614, LINE DVPCOH_1, CB N/A, CB CB80097 Nov 2026 07:008 Nov 2026 16:30COMPLETEHV equipt commissioning1
Source: AEMO. Summary built 25 Nov 2026 02:56; data through 25 Nov 2026 01:55 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.