NEM Dashboard

ITK
Period

For Hornsdale WF1+ Hornsdale WF2+Hornsdale WF3+Hallet Hill GT + Hornsdale battery (i.e.

SA · Discretionary · S_DVRB2_270
Most frequent constraint: Out = DV-LK 275kV line Or CN-RB 275kV line O/S, discretionary upper limit for Hornsdale WF1+ Hornsdale WF2+Hornsdale WF3+Hallet Hill GT + Hornsdale battery (i.e. generation + load component) <= 270 MW
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
1
% of period
0.0%
Network as built share
0.0%
Equipment outage share
0.0%
Single-plant limit share
100%
Units in constraints
6
MW in constraints
838
Curtailed while constrained
0.0 GWh
Value of that curtailment
$0.0m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
S_DVRB2_2701Limit on a single plantDiscretionaryOut = DV-LK 275kV line Or CN-RB 275kV line O/S, discretionary upper limit for Hornsdale WF1+ Hornsdale WF2+Hornsdale WF3+Hallet Hill GT + Hornsdale battery (i.e. generation + load component) <= 270 MW

Units behind it

UnitFuelMWWeightDirection
Hallett GTOCGT2771.00discharge
Hornsdale Power Reserve Unit 1Battery1501.00discharge
Hornsdale Wind Farm Stage 3Wind1121.00discharge
Hornsdale Wind Farm Stage 1Wind1021.00discharge
Hornsdale Wind Farm Stage 2Wind1021.00discharge
Hallett Stage 1 Brown HillWind941.00discharge

Associated outages

SubstationEquipmentStartEndStatusReasonBinding hours (whole outage)
CANOWI, MT_LOC, R_TOWN, HALLETLINE CANHAL_1, LINE N/A, LINE CANROB_1, LINE MLOCAN_1, CB N/A29 Oct 2026 07:0031 Oct 2026 16:00COMPLETEHV equipt maintenance1
Source: AEMO. Summary built 25 Nov 2026 02:56; data through 25 Nov 2026 01:55 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.