Cathedral Rocks + Mt Millar Wind Farm + Port Lincoln GT — discretionary cap
SA · Discretionary · S_ISLE_CRK_60
Most frequent constraint: Discretionary upper limit on Cathedral Rocks windfarm <=60 MW when 4 syn cons I/S for SA is at risk of islanding - otherwise limited to 10 MW
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
30
% of period
1.4%
Network as built share
0.0%
Equipment outage share
0.8%
Single-plant limit share
99%
Units in constraints
3
MW in constraints
158
Curtailed while constrained
0.5 GWh
Value of that curtailment
$0.0m
Network as built: the limit binds with every line and transformer in service. AEMO marks these “Out = Nil”.
Equipment outage: the limit applies only while a named line or transformer is out of service.
Limit on a single plant: AEMO caps one wind or solar farm. Most are system strength limits, which depend on how many coal, gas or hydro units and synchronous condensers are running nearby.
Constraint-hours by cause, per month
Network as builtEquipment outageLimit on a single plant
Constraints that bound in the period
Constraint
Hours
Cause
Limit type
AEMO description
S_CRK+POR03_25
30
Limit on a single plant
Discretionary
Discretionary upper limit for Cathedral Rocks WF + Port Lincoln GT3 generation <= 25 MW
S^DVPPL_CRK+MTM_109
0
Equipment outage
Voltage Stability
Out= Any line between Davenport, Cultana and Port Lincoln, Upper limit for Cathedral Rocks WF + Mt Millar WF <= 109 MW to maintain voltage stability limits
Source: AEMO. Summary built 25 Nov 2026 02:56; data through 25 Nov 2026 01:55 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.