SA Pelican Point + Snapper Point generation +Bolivar PS<= 220 MW
SA · Discretionary · S_PPT+SNPT+BLVR_220
Most frequent constraint: SA Pelican Point + Snapper Point generation +Bolivar PS<= 220 MW (Note: Constraint swamps out if Bolivar PS is at 0MW)
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
8
% of period
0.3%
Network as built share
0.0%
Equipment outage share
3.3%
Single-plant limit share
97%
Units in constraints
5
MW in constraints
823
Curtailed while constrained
0.0 GWh
Value of that curtailment
$0.0m
Network as built: the limit binds with every line and transformer in service. AEMO marks these “Out = Nil”.
Equipment outage: the limit applies only while a named line or transformer is out of service.
Limit on a single plant: AEMO caps one wind or solar farm. Most are system strength limits, which depend on how many coal, gas or hydro units and synchronous condensers are running nearby.
Constraint-hours by cause, per month
Network as builtEquipment outageLimit on a single plant
Constraints that bound in the period
Constraint
Hours
Cause
Limit type
AEMO description
S_PPT+SNPT+BLVR_220
7
Limit on a single plant
Discretionary
SA Pelican Point + Snapper Point generation +Bolivar PS<= 220 MW (Note: Constraint swamps out if Bolivar PS is at 0MW)
S>>PAPG_PPLF_PGPS
0
Equipment outage
Thermal
Out= Para to Parafield Gardens West 275kV, avoid O/L Parafield gardens west-Parafield Gardens 66kV on trip of Pelican Pt-Lefever 275kV line, Feedback
Source: AEMO. Summary built 25 Nov 2026 02:56; data through 25 Nov 2026 01:55 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.