Upper limit on Tailem Solar Farm 1+ Tailem Solar farm 2 + Tailem Bend
SA · Discretionary · S_TBSF+BAT_120
Most frequent constraint: Upper limit on Tailem Solar Farm 1+ Tailem Solar farm 2 + Tailem Bend Battery<= 120 MW
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
2
% of period
0.1%
Network as built share
19%
Equipment outage share
81%
Single-plant limit share
0.0%
Units in constraints
6
MW in constraints
434
Curtailed while constrained
0.0 GWh
Value of that curtailment
$0.0m
Network as built: the limit binds with every line and transformer in service. AEMO marks these “Out = Nil”.
Equipment outage: the limit applies only while a named line or transformer is out of service.
Limit on a single plant: AEMO caps one wind or solar farm. Most are system strength limits, which depend on how many coal, gas or hydro units and synchronous condensers are running nearby.
Constraint-hours by cause, per month
Network as builtEquipment outageLimit on a single plant
Constraints that bound in the period
Constraint
Hours
Cause
Limit type
AEMO description
S>PWSE_TBTX4_TBMO
1
Equipment outage
Thermal
Out= Penola West - South East #1 132KV line (Both Black Range series caps I/S); avoid O/L Tailem Bend to Mobilong #1 132kV line on trip of Tailem Bend 275/132kV #4 transformer, Feedback
S>>CB6125_TBTX4_TBMO
1
Equipment outage
Thermal
Out= Tailem Bend 132 kV CB6125, avoid O/L Tailem Bend to Mobilong #1 132kV line on trip of Tailem Bend 132/275kV #4 transformer and Tailem Bend to Keith #2 132kV line, Feedback
S>>NIL_TBTX4_TBMO_1
0
Network as built
Thermal
Out= Nil, avoid O/L Tailem Bend to Mobilong #1 132kV line on trip of Tailem Bend 275/132kV (#4) transformer, Feedback
S^ACMA_TBTX
0
Equipment outage
Voltage Stability
Out= Angas Creek-Mannum 132 kV line, manage voltage collapse between Mobilong - Mt Barker for loss of Tailem Bend 275/132 kV 4 transformer.
CB CB6186, CB CB6187, LINE PEWSES_1, CB CB6157, CB CB6156, TRANS TF1
26 Oct 2026 07:30
27 Oct 2026 15:30
COMPLETE
HV equipt maintenance
1
T_BEND
CB CB6125, TRANS 1, CB CB6128
19 Oct 2026 08:30
26 Oct 2026 15:30
COMPLETE
HV equipt maintenance
1
MA_2, MANNUM
CB CB6301, LINE MA2ANC_T, CB CB6303, TRANS 1, CB CB6300
1 Nov 2026 07:00
3 Nov 2026 16:30
COMPLETE
HV equipt maintenance
0
Source: AEMO. Summary built 25 Nov 2026 02:56; data through 25 Nov 2026 01:55 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.