Victoria: transient stability, Hazelwood–South Morang 500 kV

VIC · Transient Stability · V::N_NIL_V2
Most frequent constraint: Out = NIL, prevent transient instability for fault and trip of a HWTS-SMTS 500 kV line, VIC accelerates. Yallourn W G1 on 500kV.
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
235
% of period
11%
Network as built share
54%
Equipment outage share
46%
Single-plant limit share
0.0%
Units in constraints
64
MW in constraints
9,933
Curtailed while constrained
20.9 GWh
Value of that curtailment
$0.3m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
V::N_NIL_V295Network as builtTransient StabilityOut = NIL, prevent transient instability for fault and trip of a HWTS-SMTS 500 kV line, VIC accelerates. Yallourn W G1 on 500kV.
V::N_LTWG_S221Equipment outageTransient StabilityOut = Lower Tumut to Wagga 330kV line, prevent transient instability for fault and trip of a HWTS-SMTS 500 kV line, SA accelerates, Yallourn W G1 on 500 kV.
V::N_SETB_V217Equipment outageTransient StabilityOut = one South East - Tailembend 275kV line (Black Range series caps I/S), prevent transient instability for fault and trip of a HWTS-SMTS 500 kV line, VIC accelerates. Yallourn W G1 on 500kV.
V::N_NIL_V115Network as builtTransient StabilityOut = NIL, prevent transient instability for fault and trip of a HWTS-SMTS 500 kV line, VIC accelerates. Yallourn W G1 on 220kV.
V>>BELML_BAML1_BAML214Equipment outageThermalOut= Ballarat to Elaine to Moorabool 220kV line, avoid O/L Ballarat to Moorabool No.1 220kV line for trip of Ballarat to Moorabool No.2 220kV line, Feedback
V>>NIL_ELML_BAML212Network as builtThermalOut= Nil, avoid O/L Elaine to Moorabool 220kV line on trip of Ballarat to Moorabool No.2 220kV line, Feedback
V::N_KGRC_V111Equipment outageTransient StabilityOut = Kerang to Red Cliffs 220kV line (or any section in between), prevent transient instability for fault and trip of a HWTS-SMTS 500 kV line, VIC accelerates. Yallourn W G1 on 220kV.
V>>NIL_MLGT_MLGT8Network as builtThermalOut = NIL, avoid O/L Moorabool to Geelong #1 or #2 on trip of other Moorabool to Geelong line, Feedback
V::N_LTWG_V27Equipment outageTransient StabilityOut = Lower Tumut to Wagga 330kV line, prevent transient instability for fault and trip of a HWTS-SMTS 500 kV line, VIC accelerates, Yallourn W G1 on 500 kV.
V>>6CGH_BEBA_ARWBBA6Equipment outageThermalOut= 6C, 6G, 6H 330kV lines, avoid O/L Bendigo to Ballarat 220kV line on trip of Ararat to Waubra to Ballarat 220kV line, Feedback
V::N_SMSY_V26Equipment outageTransient StabilityOut = South Morang to Sydenham 500kV line, prevent transient instability for fault and trip of a HWTS-SMTS 500 kV line, VIC accelerates. Yallourn W G1 on 500kV.
V::N_SMSY_O25Equipment outageTransient StabilityOut = South Morang to Sydenham 500kV line, prevent transient instability for fault and trip of a HWTS-SMTS 500 kV line, Other than VIC accelerates. Yallourn W G1 on 500kV.
V::N_ROSM_V24Equipment outageTransient StabilityOut = Rowville to South Morang 500kV line, prevent transient instability for fault and trip of a HWTS-SMTS 500 kV line, VIC accelerates. Yallourn W G1 on 500kV.
V::N_NIL_O24Network as builtTransient StabilityOut = NIL, prevent transient instability for fault and trip of a HWTS-SMTS 500 kV line, Other than VIC accelerates. Yallourn W G1 on 500kV.
V::N_SMSC_V24Equipment outageTransient StabilityOut = One South Morang 330 kV series capacitor bank, prevent transient instability for fault and trip of a HWTS-SMTS 500 kV line, VIC accelerates. Yallourn W G1 on 500kV.
V>>BAML1_ELML_BAML24Equipment outageThermalOut= Ballarat to Moorabool No.1 220kV line, avoid O/L Elaine to Moorabool 220kV line on trip of Ballarat to Moorabool No.2 220kV line, Feedback
V::N_HWSM_V23Equipment outageTransient StabilityOut = Hazelwood to South Morang OR Hazelwood to Rowville 500kV line, prevent transient instability for fault and trip of a HWTS-SMTS 500 kV line, VIC accelerates, Yallourn W G1 on 500 kV.
V::N_KGRC_O13Equipment outageTransient StabilityOut = Kerang to Red Cliffs 220kV line (or any section in between), prevent transient instability for fault and trip of a HWTS-SMTS 500 kV line, Other than VIC accelerates. Yallourn W G1 on 220kV.
V::N_HWCB4_V22Equipment outageTransient StabilityOut = Hazelwood to Cranbourne No.4 500kV line, prevent transient instability for fault and trip of a HWTS-SMTS 500 kV line, VIC accelerates. Yallourn W G1 on 500kV.
V>>NIL_BEBA_ARWBBA2Network as builtThermalOut= Nil, avoid O/L Bendigo to Ballarat 220kV line on trip of Ararat to Waubra to Ballarat 220kV line, Feedback
V::N_HYSE_V22Equipment outageTransient StabilityOut = Heywood to South East 275kV line, prevent transient instability for fault and trip of a HWTS-SMTS 500 kV line, VIC accelerates, Yallourn W G1 on 500 kV.
V::N_KGRC_V21Equipment outageTransient StabilityOut = Kerang to Red Cliffs 220kV line (or any section in between), prevent transient instability for fault and trip of a HWTS-SMTS 500 kV line, VIC accelerates. Yallourn W G1 on 500kV.
V>>6CGH_MLGT_MLGT1Network as builtThermalOut = NIL, avoid O/L Moorabool to Geelong #1 or #2 on trip of other Moorabool to Geelong line, Feedback
CA_SYDS_59A889E5_10Equipment outageThermalConstraint Automation, O/L BATS_MLTS2_220:LML2:I:220@BATS@VIC for CTG LVAK on trip of MLTS-TGTS 220KV LINE. Generated by STNET[NORCR4] Host NORREGEEMP8(EMPSYD)
V::N_SMSC_O20Equipment outageTransient StabilityOut = One South Morang 330 kV series capacitor bank, prevent transient instability for fault and trip of a HWTS-SMTS 500 kV line, Other than VIC accelerates. Yallourn W G1 on 500kV.
Showing the 25 constraints with the most hours; 9 others also bound.

Units behind it

UnitFuelMWWeightDirection
Murray 1Water1,5501.00charge
Murray 1Water1,5500.20discharge
Stockyard Hill Wind FarmWind5281.00discharge
NewportGas other5000.79charge
Macarthur Wind FarmWind4200.91charge
Macarthur Wind FarmWind4201.00discharge
Yallourn WCoal3750.66charge
Yallourn WCoal3750.66charge
Yallourn WCoal3500.66charge
Yallourn WCoal3500.40charge
Moorabool Wind FarmWind3121.00discharge
Moorabool Wind FarmWind3120.91charge
Bogong / MackayWater3001.00charge
Bogong / MackayWater3000.21discharge
Victorian Big Battery (load)Battery3000.10charge
Mortlake Battery Energy Storage SystemBattery3001.00discharge
Victorian Big BatteryBattery3000.91charge
Victorian Big Battery (gen)Battery3000.10discharge
Victorian Big BatteryBattery3001.00discharge
MortlakeOCGT2921.00discharge
MortlakeOCGT2921.00discharge
Darlington Point Solar FarmSolar2750.25discharge
Golden Plains Wind Farm WestWind2701.00discharge
Golden Plains Wind Farm WestWind2701.00discharge
Golden Plains Wind Farm EastWind2601.00discharge
Goorambat East Solar Farm (ENGIE)Solar2500.41charge
Goorambat East Solar Farm (ENGIE)Solar2500.41discharge
Pine Lodge BESSBattery2500.48charge
Pine Lodge BESSBattery2500.48discharge
Golden Plains Wind Farm EastWind2481.00discharge
Golden Plains Wind Farm EastWind2481.00discharge
Mornington BESSBattery2400.91charge
Ararat Wind FarmWind2400.91charge
Ararat Wind FarmWind2401.00discharge
Limondale Solar Farm 1Solar2300.41charge
Limondale Solar Farm 1Solar2300.38discharge
Sunraysia Solar FarmSolar2290.38discharge
Sunraysia Solar FarmSolar2290.41charge
Murra Warra Wind Farm - stage 1Wind2261.00discharge
Murra Warra Wind Farm - stage 1Wind2260.91charge
Ryan Corner Wind FarmWind2181.00discharge
Ryan Corner Wind FarmWind2180.91charge
Murra Warra Wind Farm - stage 2Wind2091.00discharge
Murra Warra Wind Farm - stage 2Wind2090.91charge
Bulgana Green Power Hub - Wind FarmWind2040.91charge
Bulgana Green Power Hub - Wind FarmWind2041.00discharge
Hazelwood Battery Energy Storage System (HBESS)Battery2000.91charge
Rangebank BESSBattery2000.91charge
Melbourne Renewable Energy Hub Connection A2Battery2000.15discharge
Melbourne Renewable Energy Hub Connection A1Battery2000.15discharge
Melbourne Renewable Energy Hub Connection A3Battery2000.15discharge
Kiamal Solar Farm - Stage 1Solar2000.91charge
Kiamal Solar Farm - Stage 1Solar2001.00discharge
Silverton Wind FarmWind1990.58charge
Silverton Wind FarmWind1990.53discharge
Koorangie Energy Storage SystemBattery1850.98discharge
Koorangie Energy Storage SystemBattery1850.98charge
DartmouthWater1851.00charge
DartmouthWater1850.21discharge
Berrybank Wind FarmWind1811.00discharge
Berrybank Wind FarmWind1810.91charge
SomertonOCGT1700.79charge
Dundonnell Wind FarmWind1681.00discharge
Finley Solar FarmSolar1620.25discharge
Mortlake South Wind FarmWind1580.91charge
Mortlake South Wind FarmWind1580.97discharge
Laverton NorthOCGT1560.79charge
Laverton NorthOCGT1560.79charge
[auto-classified 2026-11-10]Solar1510.53discharge
Coleambally Solar FarmSolar1500.25discharge
Carwarp Solar FarmSolar1500.69discharge
Carwarp Solar FarmSolar1500.53charge
Yendon Wind FarmWind1441.00discharge
Yendon Wind FarmWind1440.91charge
Mt Gellibrand Wind FarmWind1390.99discharge
Mt Gellibrand Wind FarmWind1390.91charge
Glenrowan West Solar FarmSolar1320.91charge
Glenrowan West Solar FarmSolar1320.37discharge
Mt Mercer Wind FarmWind1311.00discharge
Mt Mercer Wind FarmWind1310.91charge
Winton North Solar FarmSolar1300.48charge
Winton North Solar FarmSolar1300.15discharge
Glenrowan Solar FarmSolar1260.91charge
Glenrowan Solar FarmSolar1260.38discharge
Dundonnell Wind FarmWind1221.00discharge
Hillston Sun FarmSolar1100.25discharge
Berrybank Wind FarmWind1090.91charge
Berrybank Wind FarmWind1091.00discharge
Bald Hills Wind FarmWind1070.91charge
Karadoc Solar FarmSolar1040.70discharge
Karadoc Solar FarmSolar1041.00charge
Numurkah Solar FarmSolar1010.50discharge
Numurkah Solar FarmSolar1010.91charge
Bannerton Solar ParkSolar1000.78discharge
Terang BESSBattery1000.91charge
Bannerton Solar ParkSolar1001.00charge
Terang BESSBattery1000.97discharge
Wemen Solar FarmSolar980.78discharge
Wemen Solar FarmSolar981.00charge
Hawkesdale Wind FarmWind971.00discharge
Hawkesdale Wind FarmWind970.91charge
Lancaster Solar FarmSolar950.50discharge
Lancaster Solar FarmSolar950.91charge
Yatpool Solar FarmSolar940.70discharge
Yatpool Solar FarmSolar941.00charge
Wunghnu Solar FarmSolar940.50discharge
Wunghnu Solar FarmSolar940.91charge
Girgarre Solar FarmSolar930.50discharge
Girgarre Solar FarmSolar930.91charge
Winton Solar FarmSolar850.91charge
Winton Solar FarmSolar850.37discharge
Elaine Wind FarmWind840.91charge
Elaine Wind FarmWind841.00discharge
Crowlands Wind FarmWind801.00discharge
Crowlands Wind FarmWind800.91charge
West KiewaWater680.21discharge
West KiewaWater681.00charge
Oaklands Hill Wind FarmWind670.91charge
Oaklands Hill Wind FarmWind670.96discharge
Cherry Tree Wind FarmWind580.91charge
Gannawarra Solar FarmSolar551.00charge
Gannawarra Solar FarmSolar551.00discharge
Salt Creek Wind FarmWind540.96discharge
Salt Creek Wind FarmWind540.91charge
Broken Hill Solar PlantSolar530.53discharge
Broken Hill Solar PlantSolar530.58charge
Limondale BESSBattery500.21charge
Broken HillBattery500.58charge
Limondale BESSBattery500.38discharge
Broken HillBattery500.53discharge
Dundonnell Wind FarmWind461.00discharge
Mokoan Solar Farm (1999)Solar460.91charge
Mokoan Solar Farm (1999)Solar460.37discharge
Corowa Solar FarmSolar360.25discharge
West KiewaWater340.80charge
Cohuna Solar FarmSolar311.00charge
Cohuna Solar FarmSolar311.00discharge
Kiata Wind FarmWind311.00discharge
Kiata Wind FarmWind310.91charge
Ballarat Energy Storage SystemBattery301.00discharge
Kerang Solar PlantSolar301.00discharge
Kerang Solar PlantSolar301.00charge
Ballarat Energy Storage SystemBattery300.91charge
Hume Dam VICWater290.19discharge
Hume Dam VICWater290.20charge
Limondale Solar Farm 2Solar290.38discharge
Limondale Solar Farm 2Solar290.41charge
Gannawarra Energy Storage SystemBattery251.00charge
Gannawarra Energy Storage SystemBattery251.00discharge
Bulgana Green Power Hub - BESSBattery201.00discharge
Bulgana Green Power Hub - BESS (gen)Battery200.18discharge
Bulgana Green Power Hub - BESSBattery200.91charge
Bulgana Green Power Hub - BESS (load)Battery200.18charge
Philip Island BESSBattery50.91charge

Associated outages

SubstationEquipmentStartEndStatusReasonBinding hours (whole outage)
WAGGA330, TUMUT3LINE 0515 Sep 2026 05:009 Sep 2026 18:00COMPLETEHV equipt commissioning26
ELTS, BATS, MLTSLINE N/A, BUS 7MN1, LINE ELTS_MLTS_220, LINE BATS_ELTS_220, BUS No2, BUS 7MN231 Aug 2026 07:003 Sep 2026 17:00COMPLETEHV equipt maintenance14
KOTSLINE KOTS_WETS_22021 Nov 2026 07:3023 Nov 2026 21:00COMPLETEHV equipt maintenance13
SMTS, SYTSLINE SMTS_SYTS2_50018 Oct 2026 05:3021 Oct 2026 16:30COMPLETEHV equipt maintenance10
S_EAST, T_BENDLINE TABSES_2, CB CB6595, CB CB6596, REAC R2, CAP 214 Sep 2026 18:3015 Sep 2026 06:30COMPLETEHV equipt commissioning6
T_BEND, S_EASTCAP 2, CB CB6595, LINE TABSES_2, CB CB6596, REAC R215 Sep 2026 18:3016 Sep 2026 06:30COMPLETEHV equipt commissioning6
BURONGALINE 6C6 Oct 2026 14:004 Nov 2026 06:00COMPLETEHV equipt maintenance5
S_EAST, T_BENDREAC R2, CAP 2, CB CB6596, LINE TABSES_2, CB CB659513 Sep 2026 18:3014 Sep 2026 06:30COMPLETEHV equipt commissioning5
SMTSCAP 1CAP_BYP_330 19 Oct 2026 06:0023 Oct 2026 16:00COMPLETEHV equipt maintenance4
BATS, MLTSLINE BATS_MLTS1_2204 Nov 2026 06:004 Nov 2026 17:00COMPLETEHV equipt maintenance4
ROTS_500, SMTSLINE ROTS_SMTS3_50012 Oct 2026 06:3012 Oct 2026 18:00COMPLETEHV equipt maintenance3
ROTS, CBTS, HWTSCB HWTS4_ROTS4, TRANS A1TR, LINE CBTS_HWTS4_500, LINE CBTS_ROTS4_50025 Oct 2026 04:0025 Oct 2026 17:00COMPLETEHV equipt maintenance2
HYTS, S_EASTLINE HYTS_SESS2_275, CB CB8028, CB CB66098 Sep 2026 21:009 Sep 2026 06:00COMPLETEHV equipt commissioning2
HWTSBUS 6MN220 Oct 2026 06:0021 Oct 2026 15:30COMPLETEHV equipt maintenance2
SMTSCB HWTS2_2B18 Sep 2026 21:059 Nov 2026 17:00COMPLETEHV equipt maintenance2
SMTS, HWTSLINE HWTS_SMTS2_50018 Sep 2026 06:0018 Sep 2026 18:00COMPLETEHV equipt maintenance1
SMTS, ROTS_500LINE ROTS_SMTS3_50013 Oct 2026 06:3013 Oct 2026 18:00COMPLETEHV equipt maintenance1
WETS, RCTS, BURONGALINE 0X1, CAP 1CAP_220, TRANS 2ATR, TRANS 1ATR, BUS 7MN1, TRANS 2BTR, LINE RCTS_WETS_220, TRANS 1BTR12 Nov 2026 04:3012 Nov 2026 18:00MTLTPHV equipt maintenance1
MLTSBUS 7MN11 Sep 2026 07:001 Sep 2026 17:00COMPLETEHV equipt maintenance0
SMTS, ROTS_500LINE ROTS_SMTS3_5009 Oct 2026 06:009 Oct 2026 14:00COMPLETEHV equipt maintenance0
SMTS, HWTSLINE HWTS_SMTS2_500, BUS 6MN218 Sep 2026 20:5018 Sep 2026 23:00COMPLETEHV equipt maintenance0
HWTS, SMTSLINE HWTS_SMTS1_5002 Sep 2026 17:002 Sep 2026 18:00COMPLETEHV equipt maintenance0
S_EAST, HYTSLINE HYTS_SESS2_27515 Oct 2026 07:0015 Oct 2026 16:00COMPLETEHV equipt maintenance0
RCTSLINE CPTS_RCTS_220, BUS 7MN2, LINE X9, CAP 2CAP_22015 Oct 2026 06:3015 Oct 2026 19:30COMPLETEHV equipt maintenance0
SMTS, ROTS_500LINE ROTS_SMTS3_50011 Oct 2026 06:3011 Oct 2026 18:30COMPLETEHV equipt maintenance0
S_EASTCB CB6609, CB CB802815 Oct 2026 07:0015 Oct 2026 16:00COMPLETEHV equipt maintenance0
Source: AEMO. Summary built 25 Nov 2026 02:26; data through 25 Nov 2026 01:25 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.