Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage

VIC · Transient Stability · V::S_SETB_TBSE_2
Most frequent constraint: Out= one South East to Tailem Bend 275kV line (Both Black Range series capacitors O/S or I/S); Vic to SA Transient Stability limit for loss of one of the Tailem Bend-South East 275kV lines.
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
40
% of period
1.8%
Network as built share
33%
Equipment outage share
67%
Single-plant limit share
0.0%
Units in constraints
16
MW in constraints
924
Curtailed while constrained
1.1 GWh
Value of that curtailment
$0.0m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
V::S_SETB_TBSE_29Equipment outageTransient StabilityOut= one South East to Tailem Bend 275kV line (Both Black Range series capacitors O/S or I/S); Vic to SA Transient Stability limit for loss of one of the Tailem Bend-South East 275kV lines.
S>V_NIL_SETX_SETX17Network as builtThermalOut= Nil, avoid overloading a South East 132/275 kV transformer on trip of the remaining South East 132/275 kV transformer(for Transformer component SECS O/S), Feedback
V::S_BLKRG_MAXG_35Equipment outageTransient StabilityOut = only one Black Range series capacitor I/S; Vic to SA Transient Stability limit for loss of the largest generation block in SA.
SV_HEY_600_TEST4Network as builtOtherOut = Nil, SA to Vic on Heywood limit of 600 MW, limit for testing of Heywood interconnection upgrade
V::S_BDBU_MAXG_13Equipment outageTransient StabilityOut = Bundey to Buronga 330kV(Both Black Range series capacitors I/S); Vic to SA Transient Stability limit for loss of the largest generation block in SA (Both South East Capacitor Available).
S::V_NIL_TBSE_23Network as builtTransient StabilityOut = Nil(Note: with both Black Range series capacitors O/S); SA to VIC Transient Stability limit for loss of one of the Tailembend-South East 275kV lines.
S>KHKN_SETX_SETX12Equipment outageThermalOut= Keith-Kincraig 132kV line, avoid overloading a South East 132/275 kV transformer on trip of the remaining South East 132/275 kV transformer(for Transformer component SECS O/S), Feedback
S::V_TBSE_TBSE2Equipment outageTransient StabilityOut = one Tailem Bend-South East 275kV line (Note: with one Black Range series caps I/S); SA to VIC Transient Stability limit for loss of other Tailem Bend-South East 275kV lines.
S:V_BLKRG_5502Equipment outageOscillatory StabilityOut = both or one Black Range series capacitors O/S, SA to VIC on Heywood upper transfer limit of 550 MW based on oscillatory stability.
SA_SETB_B1Equipment outageRegion SeparationOut = South East to Tailem Bend 275 kV line, SA Islanded for loss of parallel line by SAIT RAS scheme, limit contingency at VIC-SA separation point to < 250 MW in SA to VIC direction
V::S_PWSE_MAXG1Equipment outageTransient StabilityOut= Penola West - South East 132 kV line (Both Black Range series caps I/S); Vic to SA Transient Stability limit for loss of the largest generator in SA.
V::S_BLKRG_TBSE_21Equipment outageTransient StabilityOut = both or one Black Range series capacitors O/S; Vic to SA Transient Stability limit for loss of one of the Tailembend-South East 275kV lines.
S>>BDBU_TBTU_TBTU_11Equipment outageThermalOut= Bundey to Buronga 330kV, avoid O/L Tailem Bend-Tungkillo 275kV line 1 or 2 on trip of parallel Tailem Bend-Tungkillo 275 kV line 2 or 1, Feedback
V::S_KHKN_MAXG_20Equipment outageTransient StabilityOut= Keith - Kincraig 132 kV line(Both Black Range series caps O/S); Vic to SA Transient Stability limit for loss of the largest generator in SA
V::S_NIL_MAXG_10Network as builtTransient StabilityOut = Nil(Both Black Range series capacitors I/S); Vic to SA Transient Stability limit for loss of the largest generation block in SA (Both South East Capacitor Available)
V::S_PAVC1_MAXG0Equipment outageTransient StabilityOut= Para one SVC (Both Black Range series caps I/S); Vic to SA Transient Stability limit for loss of the largest generator in SA.
V::S_HYSE_MAXG0Equipment outageTransient StabilityOut =One Heywood-South East 275kV line O/S (Note: with both Black Range series caps I/S); Vic to SA Transient Stability limit for loss of the largest generation block in SA.

Units behind it

UnitFuelMWWeightDirection
Lake Bonney 2 Wind FarmWind1591.00charge
Lake Bonney 2 Wind FarmWind1591.00discharge
Tailem Bend - SolarSolar1081.00discharge
Tailem Bend - SolarSolar1081.00charge
Tailem Bend Stage 2 Solar ProjectSolar1051.00discharge
Tailem Bend Stage 2 Solar ProjectSolar1051.00charge
Mannum BESSBattery1000.37discharge
Mannum BESSBattery1000.83charge
Lake Bonney 1 Wind FarmWind801.00charge
Lake Bonney 1 Wind FarmWind801.00discharge
SnuggeryOCGT631.00charge
SnuggeryOCGT631.00discharge
CanundaWind461.00charge
CanundaWind461.00discharge
Tailem Bend Battery Project (gen)Battery420.20charge
Tailem Bend Battery Project (load)Battery420.20discharge
Tailem Bend Battery ProjectBattery421.00discharge
Tailem Bend Battery ProjectBattery421.00charge
Ladbroke GroveOCGT401.00discharge
Ladbroke GroveOCGT401.00discharge
Ladbroke GroveOCGT401.00charge
Ladbroke GroveOCGT401.00charge
Lake Bonney 3 Wind FarmWind391.00charge
Lake Bonney 3 Wind FarmWind391.00discharge
Mannum Solar Farm 2Solar300.83charge
Mannum Solar Farm 2Solar300.37discharge
Lake Bonney Battery Energy StorageBattery251.00discharge
Lake Bonney Battery Energy StorageBattery251.00charge
Mannum Adelaide Pumping Station No 2 - MAPL2 (Palmer)Solar160.71charge
Mannum Adelaide Pumping Station No 2 - MAPL2 (Palmer)Solar160.32discharge
Mannum Adelaide Pumping Station No 3 - MAPL3 (Tungkillo)Solar160.30discharge
Mannum Adelaide Pumping Station No 3 - MAPL3 (Tungkillo)Solar160.68charge
Murray Bridge - Onkaparinga Pipeline Pump 2Solar140.40discharge
Murray Bridge - Onkaparinga Pipeline Pump 2Solar140.91charge

Associated outages

SubstationEquipmentStartEndStatusReasonBinding hours (whole outage)
S_EAST, T_BENDREAC R2, CAP 2, CB CB6596, LINE TABSES_2, CB CB659513 Sep 2026 18:3014 Sep 2026 06:30COMPLETEHV equipt commissioning8
BURONGALINE 6F29 Sep 2026 07:001 Oct 2026 12:00COMPLETEHV equipt commissioning4
–CB 8032, CAP 210 Nov 2026 05:3010 Nov 2026 15:30STLTPHV equipt commissioning3
T_BEND, S_EASTLINE TABSES_2, CB CB6595, CAP 2, CB CB6596, REAC R215 Sep 2026 18:3016 Sep 2026 06:30COMPLETEHV equipt commissioning2
–CAP 1, CB 803120 Oct 2026 07:3020 Oct 2026 16:30COMPLETEHV equipt maintenance2
BUNDEY, 6FCB CB9054, REACT REACT_BUR1, CB CB9052, LINE 6F, CB CB905729 Sep 2026 09:3029 Sep 2026 16:30COMPLETEHV equipt maintenance2
KINCRA, KEITHLINE KEIKIN_1, CB CB6140, CB CB6113, CB CB6143, CAP CAP1, CB CB61114 Sep 2026 21:356 Sep 2026 18:00COMPLETEHV equipt maintenance2
–CAP 1, CB 803118 Oct 2026 06:0018 Oct 2026 13:30COMPLETEHV equipt maintenance2
–CAP 2, CB 803218 Oct 2026 07:3018 Oct 2026 17:00COMPLETEHV equipt maintenance2
S_EAST, PENO_WCB CB6187, CB CB6186, LINE PEWSES_1, CB CB6157, TRANS TF1, CB CB615626 Oct 2026 07:3027 Oct 2026 15:30COMPLETEHV equipt maintenance1
–CAP 1, CB 803117 Oct 2026 06:0017 Oct 2026 13:30COMPLETEHV equipt maintenance1
–CB 8031, CAP 124 Oct 2026 05:3024 Oct 2026 17:00COMPLETEHV equipt maintenance1
–CB 8032, CAP 224 Oct 2026 11:3024 Oct 2026 17:00COMPLETEHV equipt commissioning1
T_BEND, S_EASTCB CB6606, CB CB6604, CB CB8027, CB CB8026, CAP 1, LINE TABSES_130 Aug 2026 16:3030 Aug 2026 17:30COMPLETEHV equipt commissioning0
T_BEND, S_EASTLINE TABSES_1, REAC R18 Sep 2026 08:308 Sep 2026 09:00COMPLETEHV equipt maintenance0
S_EAST, T_BENDCB CB6596, REAC R2, CAP 2, CB CB6607, LINE TABSES_2, CB CB6595, CB CB660512 Sep 2026 09:3012 Sep 2026 10:00COMPLETEHV equipt maintenance0
–CAP 1, CB 803119 Oct 2026 06:0019 Oct 2026 13:30COMPLETEHV equipt maintenance0
S_EAST, T_BENDCB CB6596, REAC R2, CAP 2, LINE TABSES_2, CB CB659514 Sep 2026 18:3015 Sep 2026 06:30COMPLETEHV equipt commissioning0
T_BEND, S_EASTCB CB6596, CAP 2, SVC SVC2, CB CB6607, LINE TABSES_2, CB CB6595, CB CB660521 Sep 2026 16:3021 Sep 2026 17:30COMPLETEHV equipt commissioning0
–CB 8032, CAP 221 Oct 2026 07:3021 Oct 2026 16:30COMPLETEHV equipt maintenance0
PARASVC SVC2, CB CB6600, CB N/A6 Oct 2026 08:158 Oct 2026 14:30COMPLETEHV equipt maintenance0
–CB 8032, CAP 212 Nov 2026 05:3012 Nov 2026 15:30STLTPHV equipt commissioning0
S_EAST, HYTSLINE HYTS_SESS2_27515 Oct 2026 07:0015 Oct 2026 16:00COMPLETEHV equipt maintenance0
RCTSLINE CPTS_RCTS_220, BUS 7MN2, LINE X9, CAP 2CAP_22015 Oct 2026 06:3015 Oct 2026 19:30COMPLETEHV equipt maintenance0
S_EASTCB CB6609, CB CB802815 Oct 2026 07:0015 Oct 2026 16:00COMPLETEHV equipt maintenance0
–CAP 1, CB 803123 Oct 2026 05:3023 Oct 2026 17:00COMPLETEHV equipt maintenance0
Source: AEMO. Summary built 25 Nov 2026 02:56; data through 25 Nov 2026 01:55 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.