| Constraint | Hours | Cause | Limit type | AEMO description |
|---|---|---|---|---|
| V::S_SETB_TBSE_2 | 9 | Equipment outage | Transient Stability | Out= one South East to Tailem Bend 275kV line (Both Black Range series capacitors O/S or I/S); Vic to SA Transient Stability limit for loss of one of the Tailem Bend-South East 275kV lines. |
| S>V_NIL_SETX_SETX1 | 7 | Network as built | Thermal | Out= Nil, avoid overloading a South East 132/275 kV transformer on trip of the remaining South East 132/275 kV transformer(for Transformer component SECS O/S), Feedback |
| V::S_BLKRG_MAXG_3 | 5 | Equipment outage | Transient Stability | Out = only one Black Range series capacitor I/S; Vic to SA Transient Stability limit for loss of the largest generation block in SA. |
| SV_HEY_600_TEST | 4 | Network as built | Other | Out = Nil, SA to Vic on Heywood limit of 600 MW, limit for testing of Heywood interconnection upgrade |
| V::S_BDBU_MAXG_1 | 3 | Equipment outage | Transient Stability | Out = Bundey to Buronga 330kV(Both Black Range series capacitors I/S); Vic to SA Transient Stability limit for loss of the largest generation block in SA (Both South East Capacitor Available). |
| S::V_NIL_TBSE_2 | 3 | Network as built | Transient Stability | Out = Nil(Note: with both Black Range series capacitors O/S); SA to VIC Transient Stability limit for loss of one of the Tailembend-South East 275kV lines. |
| S>KHKN_SETX_SETX1 | 2 | Equipment outage | Thermal | Out= Keith-Kincraig 132kV line, avoid overloading a South East 132/275 kV transformer on trip of the remaining South East 132/275 kV transformer(for Transformer component SECS O/S), Feedback |
| S::V_TBSE_TBSE | 2 | Equipment outage | Transient Stability | Out = one Tailem Bend-South East 275kV line (Note: with one Black Range series caps I/S); SA to VIC Transient Stability limit for loss of other Tailem Bend-South East 275kV lines. |
| S:V_BLKRG_550 | 2 | Equipment outage | Oscillatory Stability | Out = both or one Black Range series capacitors O/S, SA to VIC on Heywood upper transfer limit of 550 MW based on oscillatory stability. |
| SA_SETB_B | 1 | Equipment outage | Region Separation | Out = South East to Tailem Bend 275 kV line, SA Islanded for loss of parallel line by SAIT RAS scheme, limit contingency at VIC-SA separation point to < 250 MW in SA to VIC direction |
| V::S_PWSE_MAXG | 1 | Equipment outage | Transient Stability | Out= Penola West - South East 132 kV line (Both Black Range series caps I/S); Vic to SA Transient Stability limit for loss of the largest generator in SA. |
| V::S_BLKRG_TBSE_2 | 1 | Equipment outage | Transient Stability | Out = both or one Black Range series capacitors O/S; Vic to SA Transient Stability limit for loss of one of the Tailembend-South East 275kV lines. |
| S>>BDBU_TBTU_TBTU_1 | 1 | Equipment outage | Thermal | Out= Bundey to Buronga 330kV, avoid O/L Tailem Bend-Tungkillo 275kV line 1 or 2 on trip of parallel Tailem Bend-Tungkillo 275 kV line 2 or 1, Feedback |
| V::S_KHKN_MAXG_2 | 0 | Equipment outage | Transient Stability | Out= Keith - Kincraig 132 kV line(Both Black Range series caps O/S); Vic to SA Transient Stability limit for loss of the largest generator in SA |
| V::S_NIL_MAXG_1 | 0 | Network as built | Transient Stability | Out = Nil(Both Black Range series capacitors I/S); Vic to SA Transient Stability limit for loss of the largest generation block in SA (Both South East Capacitor Available) |
| V::S_PAVC1_MAXG | 0 | Equipment outage | Transient Stability | Out= Para one SVC (Both Black Range series caps I/S); Vic to SA Transient Stability limit for loss of the largest generator in SA. |
| V::S_HYSE_MAXG | 0 | Equipment outage | Transient Stability | Out =One Heywood-South East 275kV line O/S (Note: with both Black Range series caps I/S); Vic to SA Transient Stability limit for loss of the largest generation block in SA. |
| Substation | Equipment | Start | End | Status | Reason | Binding hours (whole outage) |
|---|---|---|---|---|---|---|
| S_EAST, T_BEND | REAC R2, CAP 2, CB CB6596, LINE TABSES_2, CB CB6595 | 13 Sep 2026 18:30 | 14 Sep 2026 06:30 | COMPLETE | HV equipt commissioning | 8 |
| BURONGA | LINE 6F | 29 Sep 2026 07:00 | 1 Oct 2026 12:00 | COMPLETE | HV equipt commissioning | 4 |
| – | CB 8032, CAP 2 | 10 Nov 2026 05:30 | 10 Nov 2026 15:30 | STLTP | HV equipt commissioning | 3 |
| T_BEND, S_EAST | LINE TABSES_2, CB CB6595, CAP 2, CB CB6596, REAC R2 | 15 Sep 2026 18:30 | 16 Sep 2026 06:30 | COMPLETE | HV equipt commissioning | 2 |
| – | CAP 1, CB 8031 | 20 Oct 2026 07:30 | 20 Oct 2026 16:30 | COMPLETE | HV equipt maintenance | 2 |
| BUNDEY, 6F | CB CB9054, REACT REACT_BUR1, CB CB9052, LINE 6F, CB CB9057 | 29 Sep 2026 09:30 | 29 Sep 2026 16:30 | COMPLETE | HV equipt maintenance | 2 |
| KINCRA, KEITH | LINE KEIKIN_1, CB CB6140, CB CB6113, CB CB6143, CAP CAP1, CB CB6111 | 4 Sep 2026 21:35 | 6 Sep 2026 18:00 | COMPLETE | HV equipt maintenance | 2 |
| – | CAP 1, CB 8031 | 18 Oct 2026 06:00 | 18 Oct 2026 13:30 | COMPLETE | HV equipt maintenance | 2 |
| – | CAP 2, CB 8032 | 18 Oct 2026 07:30 | 18 Oct 2026 17:00 | COMPLETE | HV equipt maintenance | 2 |
| S_EAST, PENO_W | CB CB6187, CB CB6186, LINE PEWSES_1, CB CB6157, TRANS TF1, CB CB6156 | 26 Oct 2026 07:30 | 27 Oct 2026 15:30 | COMPLETE | HV equipt maintenance | 1 |
| – | CAP 1, CB 8031 | 17 Oct 2026 06:00 | 17 Oct 2026 13:30 | COMPLETE | HV equipt maintenance | 1 |
| – | CB 8031, CAP 1 | 24 Oct 2026 05:30 | 24 Oct 2026 17:00 | COMPLETE | HV equipt maintenance | 1 |
| – | CB 8032, CAP 2 | 24 Oct 2026 11:30 | 24 Oct 2026 17:00 | COMPLETE | HV equipt commissioning | 1 |
| T_BEND, S_EAST | CB CB6606, CB CB6604, CB CB8027, CB CB8026, CAP 1, LINE TABSES_1 | 30 Aug 2026 16:30 | 30 Aug 2026 17:30 | COMPLETE | HV equipt commissioning | 0 |
| T_BEND, S_EAST | LINE TABSES_1, REAC R1 | 8 Sep 2026 08:30 | 8 Sep 2026 09:00 | COMPLETE | HV equipt maintenance | 0 |
| S_EAST, T_BEND | CB CB6596, REAC R2, CAP 2, CB CB6607, LINE TABSES_2, CB CB6595, CB CB6605 | 12 Sep 2026 09:30 | 12 Sep 2026 10:00 | COMPLETE | HV equipt maintenance | 0 |
| – | CAP 1, CB 8031 | 19 Oct 2026 06:00 | 19 Oct 2026 13:30 | COMPLETE | HV equipt maintenance | 0 |
| S_EAST, T_BEND | CB CB6596, REAC R2, CAP 2, LINE TABSES_2, CB CB6595 | 14 Sep 2026 18:30 | 15 Sep 2026 06:30 | COMPLETE | HV equipt commissioning | 0 |
| T_BEND, S_EAST | CB CB6596, CAP 2, SVC SVC2, CB CB6607, LINE TABSES_2, CB CB6595, CB CB6605 | 21 Sep 2026 16:30 | 21 Sep 2026 17:30 | COMPLETE | HV equipt commissioning | 0 |
| – | CB 8032, CAP 2 | 21 Oct 2026 07:30 | 21 Oct 2026 16:30 | COMPLETE | HV equipt maintenance | 0 |
| PARA | SVC SVC2, CB CB6600, CB N/A | 6 Oct 2026 08:15 | 8 Oct 2026 14:30 | COMPLETE | HV equipt maintenance | 0 |
| – | CB 8032, CAP 2 | 12 Nov 2026 05:30 | 12 Nov 2026 15:30 | STLTP | HV equipt commissioning | 0 |
| S_EAST, HYTS | LINE HYTS_SESS2_275 | 15 Oct 2026 07:00 | 15 Oct 2026 16:00 | COMPLETE | HV equipt maintenance | 0 |
| RCTS | LINE CPTS_RCTS_220, BUS 7MN2, LINE X9, CAP 2CAP_220 | 15 Oct 2026 06:30 | 15 Oct 2026 19:30 | COMPLETE | HV equipt maintenance | 0 |
| S_EAST | CB CB6609, CB CB8028 | 15 Oct 2026 07:00 | 15 Oct 2026 16:00 | COMPLETE | HV equipt maintenance | 0 |
| – | CAP 1, CB 8031 | 23 Oct 2026 05:30 | 23 Oct 2026 17:00 | COMPLETE | HV equipt maintenance | 0 |