NEM Dashboard

ITK
Period

Glenrowan transformers (north-east Victoria)

VIC · Thermal · V>NIL_GNTX_GNTX_TEMP
Most frequent constraint: Out= Nil, maintain post-contingent loading (from 66 to 220kV) on either Glenrowan B txfmr less than 187.5 MVA for loss of one Glenrowan B txfmr, Feedback
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
285
% of period
13%
Network as built share
100%
Equipment outage share
0.0%
Single-plant limit share
0.0%
Units in constraints
3
MW in constraints
263
Curtailed while constrained
10.9 GWh
Value of that curtailment
$0.2m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
V>NIL_GNTX_GNTX_TEMP285Network as builtThermalOut= Nil, maintain post-contingent loading (from 66 to 220kV) on either Glenrowan B txfmr less than 187.5 MVA for loss of one Glenrowan B txfmr, Feedback

Units behind it

UnitFuelMWWeightDirection
Glenrowan West Solar FarmSolar1321.00discharge
Winton Solar FarmSolar851.00discharge
Mokoan Solar Farm (1999)Solar461.00discharge

Associated outages

No associated outage overlapped this period.
Source: AEMO. Summary built 25 Nov 2026 02:26; data through 25 Nov 2026 01:25 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.