NEM Dashboard

ITK
Period

Waubra to Ballarat

VIC · Thermal · V>NIL_WBBA_KMRC
Most frequent constraint: Out= Nil, avoid O/L Waubra to Ballarat 220kV line on trip of Kiamal to Carwarp to Red Cliffs 220kV line, Feedback. Constraint active only when GFT2 on Murra Warra WF I/S.
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
0
% of period
0.0%
Network as built share
100%
Equipment outage share
0.0%
Single-plant limit share
0.0%
Units in constraints
7
MW in constraints
926
Curtailed while constrained
0.0 GWh
Value of that curtailment
$0.0m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
V>NIL_WBBA_KMRC0Network as builtThermalOut= Nil, avoid O/L Waubra to Ballarat 220kV line on trip of Kiamal to Carwarp to Red Cliffs 220kV line, Feedback. Constraint active only when GFT2 on Murra Warra WF I/S.

Units behind it

UnitFuelMWWeightDirection
Ararat Wind FarmWind2401.00discharge
Bulgana Green Power Hub - Wind FarmWind2040.99discharge
Kiamal Solar Farm - Stage 1Solar2000.96discharge
[auto-classified 2026-11-10]Solar1510.96discharge
Crowlands Wind FarmWind801.00discharge
Kiata Wind FarmWind310.91discharge
Bulgana Green Power Hub - BESSBattery200.99discharge

Associated outages

No associated outage overlapped this period.
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.