Crowlands Wind Farm — system strength

VIC · System Strength · V_CWWF_FLT_55
Most frequent constraint: Limit Crowlands Wind Farm upper limit to 55 MW to manage post contingent voltage oscillation
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
24
% of period
1.1%
Network as built share
0.0%
Equipment outage share
0.0%
Single-plant limit share
100%
Units in constraints
1
MW in constraints
80
Curtailed while constrained
0.5 GWh
Value of that curtailment
$0.0m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
NC_V_CROWLWF119Limit on a single plantNon-ConformanceNon Conformance Constraint for CROWLANDS WIND FARM
V_CWWF_FLT_03Limit on a single plantSystem StrengthLimit Crowlands Wind Farm upper limit to 0 MW to manage post contingent voltage oscillation
V_CWWF_FLT_252Limit on a single plantSystem StrengthLimit Crowlands Wind Farm upper limit to 25 MW to manage post contingent voltage oscillation

Units behind it

UnitFuelMWWeightDirection
Crowlands Wind FarmWind801.00discharge

Associated outages

SubstationEquipmentStartEndStatusReasonBinding hours (whole outage)
–N/A N/A27 Oct 2026 06:0029 Oct 2026 16:00COMPLETEHV equipt commissioning3
JINDERA, WOTSLINE 060, LINE N/A28 Oct 2026 06:0028 Oct 2026 17:00COMPLETEHV equipt maintenance3
JINDERA, WOTSLINE 06028 Oct 2026 06:0028 Oct 2026 17:00COMPLETEHV equipt maintenance3
BURONGALINE 6F28 Oct 2026 06:0028 Oct 2026 17:00COMPLETEHV equipt commissioning3
MULWALACB 7B128 Oct 2026 06:0028 Oct 2026 17:00COMPLETEHV equipt maintenance3
BETS, SHTSLINE BETS_SHTS_22012 Oct 2026 11:0023 Oct 2026 17:00COMPLETEHV equipt maintenance2
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.